| Autor(en): | Bach, D.; Fuchs, W.; Lehner, W.; Obermeier, O. |
| Titel: | Tunnelkette Perschling - Reiserbergtunnel and Stierschweiffeldtunnel: TBM Success under Difficult Ground Conditions |
| Kurzfassung: | Due to the very difficult geological conditions and the partly low overburden the TBM drives of the ?Tunnelkette Perschling? have been a challenge for the persons involved in the project. This paper is a report on the experiences and conclusions gained from two of the three driven tunnels. It deals with the unexpected major occurrences and the related solutions as well as with the adjustment of the concept for backfilling the annular gap in order to achieve sufficient stabilization of the segmental tunnel lining under all conditions encountered. |
| Erschienen in: | Geomechanics and Tunnelling 1 (2008), Heft 6 |
| Seite/n: | 567-575 |
| Sprache der Veröffentlichung: | Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (2.25 MB) herunterladen. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanics and Tunnelling" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanics and Tunnelling" abonnieren |