Logo Ernst und Sohn

Vorschau

Titel:     
 
Cover Picture: Steel Construction 1/2019
 
Kurzfassung:     
 
The Gustave Eiffel Pavilion and the Ferrié Pavilion complete with a museum as well as an information and service area were each reconstructed between two pillars. In the case of the already existing 58 Tour Eiffel restaurant the glass facade was brought in line with those present in the other two pavilions. Glass surfaces facing inside and outside, a 130 m2 glass floor, which opens up a view of the Champ-de-Mars below. In order to meet the energy requirements, the Strasbourg-based façade builder, HEFI, opted for insulating glass elements, using Super Spacer® TriSealTM Premium Plus by Edgetech Europe GmbH as the spacer. (© L. Herbrecht)
 
Erschienen in:     Steel Construction 12 (2019), Heft 1
 
Seite/n:     
 
Sprache der Veröffentlichung:     Englisch



Ich möchte den Artikel kaufen

Dieser Artikel steht aktuell nicht als Download zur Verfügung.
Wir digitalisieren diesen selbstverständlich gerne auf Anfrage, bitte geben Sie hierfür Ihr E-Mail-Adresse ein. Sie erhalten von uns eine Nachricht, sobald der Artikel als Download bereit steht. Bitte beachten Sie, dass dies bis zu sieben Werktage dauern kann.

Einen digitalisierten Artikel können Sie für 25 € als PDF herunterladen.
Das PDF kann gelesen, gedruckt und gespeichert werden.
Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet.


Ihre E-Mail-Adresse


Ich möchte "Steel Construction" abonnieren


Preise inkl. MwSt. und inkl. Versand. Preise für 2017/2018.
€ Preise gelten ausschließlich für Deutschland. Änderungen und Irrtum vorbehalten.