Autor(en): | Kitiyodom, Pastsakorn; Wiriyatharakij, Woraphon; Asanprakit, Auttakit; Yamchoo, Anucha |
Titel: | Challenges in design and construction of Bangkok MRT Orange Line project |
Kurzfassung: | The MRT Orange Line construction works in Bangkok are more complicated than works in earlier projects. As the tunnel alignment passes through the congested urban areas in the city, it either clashes with or passes beneath several existing structures. Underpinning works are then required. Assessment of movement of ground and structure plays an important role in the project. The rebound of piezometric pressure in sand layers that is being developed poses a major point of difficulty in the excavation and underground structure design and construction. Groundwater control measures become a crucial issue in MRT Orange Line project that leads to difficulties in deep MRT station excavations. To control base instability, various methods (e.g., cut-off wall, staged excavation) are introduced and presented in this article. |
Erschienen in: | Geomechanics and Tunnelling 16 (2023), Heft 3 |
Seite/n: | 263-271 |
Sprache der Veröffentlichung: | Englisch/Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (1.27 MB) herunterladen. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanics and Tunnelling" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanics and Tunnelling" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanics and Tunnelling" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |