Logo Ernst und Sohn

Preview

Author(s):     
 
Reis, A.; Cremer, J. M.; Lothaire, A.; Lopes, N.
 
Title:     
 
The steel design for the new railway bridge over the River Sado in Portugal
 
Abstract:     
 
The new railway crossing over the River Sado at Alcacer do Sal in Portugal required a 2.7 km long bridge, comprising two approach viaducts and a main bridge. Steel-concrete composite decks were adopted, the approach viaducts having plate girder decks with 45 and 37.5 m spans, and the main bridge three spans of 160 m each with a box girder deck. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a single plane of hangers on the bridge axis. The main aspects of the bridge concept design are described and the steel design in particular is discussed.
 
Source:     Steel Construction 3 (2010), No. 4
 
Page/s:     201-211
 
Language of Publication:     English



I would like to buy the article

You can download this article for 25 € as a PDF file (0.97 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library.

I would like to order "Steel Construction"

This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.