Author(s):     
 

 
Title:     
 

 
Abstract:     
 
The Pummersdorf Tunnel is part of the works to close the gap between St. Pölten and Loosdorf and is planned as a single-bore, two-track tunnel about 3.5 km long. Before the start of the design work leading to handing the project in for approval, a risk analysis was carried out regarding suitable tunnelling methods, with four variants being compared. As a result of this risk analysis, taking the current market conditions into account, a decision was made to submit two methods of tunnelling to free market competition:
· Variant A: Sequential advance with two lining layers (with relief of water pressure),
· Variant B: Continuous advance with an EPB shield with single-layer segment lining (resistant to water pressure).
This article describes the project as affected by the geotechnical, hydrogeological and environmental constraints as well as the specific sensitive aspects on this project. It describes the decision-making process, which led to the selection of the two tendered variants, and briefly describes the tendered variants.
Der Tunnel Pummersdorf ist Bestandteil des Lückenschlusses St. Pölten-Loosdorf und ist als einröhriger, zweigleisiger Tunnel mit rund 3,5 km Länge geplant. Vor Beginn der Ausschreibungsplanung wurde eine Risikoanalyse betreffend geeigneter Vortriebsmethoden durchgeführt, wobei vier Varianten miteinander verglichen wurden. Als Ergebnis der Risikoanalyse wurde unter Berücksichtigung von derzeitigen Marktverhältnissen die Entscheidung getroffen, zwei Vortriebsmethoden dem freien Wettbewerb zu stellen:
· Variante A: Zyklischer Vortrieb mit zweischaligem Ausbau (druckwasserentlastend),
· Variante B: Kontinuierlicher Vortrieb mit EPB-Schild mit einschaligem Tübbingausbau (druckwasserhaltend).
Im vorliegenden Bericht wird das Projekt im Rahmen der geotechnischen, hydrogeologischen und umfeldrelevanten Randbedingungen sowie der spezifisch sensiblen Aspekte des Projekts vorgestellt. Es wird auf die Entscheidungsfindung eingegangen, die zur Auswahl der beiden ausgeschriebenen Varianten geführt hat, und die ausgeschriebenen Varianten werden in ihren Grundzügen vorgestellt.
 
Source:     Geomechanics and Tunnelling 4 (2011), No. 5
 
Page/s:     499-507
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (1.92 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.