Schleiss, Anton
 
Title:     
 

 
Abstract:     
 
For the highly loaded pressure tunnels and shafts that are used for the extension of storage power plants with pumped storage and to increase installed capacity, alignments of the waterway system with high overburden are of great importance from the economical and safety points of view. With the development of the raise-boring method, vertical pressure shafts can now be drilled up to 800 m in one step.
Considering rock cover, the use of vertical pressure shafts can enable optimal alignments. If the vertical shaft is located deep enough in the rock mass and safety against hydraulic jacking can be ensured, no steel liner is required in the shaft as long as rock permeability is low, and a reinforced concrete lining is sufficient. This is designed in order to limit crack widths and thus keep water losses below acceptable values. In view of highly increasing steel prices, such a concept results in economic and competitive pumped-storage projects.
Bei hochbeanspruchten Druckstollen und Druckschächten, wie diese bei der Erweiterung von Speicherkraftwerken mit Pumpspeicherwerken und durch Leistungserhöhungen vorkommen, sind tiefliegende Linienführungen der Triebwassersysteme aus wirtschaftlichen und sicherheitstechnischen Gründen von größter Bedeutung. Mit der Entwicklung des Raise-Boring-Verfahrens können heute Vertikalschächte bis gegen 800 m in einer einzigen Etappe ausgeführt werden. Dadurch ergeben sich bezüglich Felsüberdeckung optimale Linienführungen. Falls der Schacht genügend tief im Gebirge angeordnet wird und somit die Sicherheit gegen hydraulischen Gebirgsbruch gewährleistet ist, kann bei wenig durchlässigen Felsformationen auf eine Stahlpanzerung verzichtet werden. Eine bewehrte Betonauskleidung ist ausreichend, deren Bewehrung so bemessen ist, dass die Rissweiten und somit die Wasserverluste auf zulässige Werte beschränkt werden. Anbetracht der stark angestiegenen Stahlpreisen führt dieses Konzept zu wirtschaftlichen und konkurrenzfähigen Pumpspeicherwerkprojekten.
 
Source:     Geomechanics and Tunnelling 6 (2013), No. 5
 
Page/s:     456-463
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (0.59 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.