The two shafts located at Gotthard Base Tunnel in Sedrun - each 800 m deep - are serving during final tunnel operation as ventilation and as supply shafts. During construction phase of the main tunnels, each 57 km in length, they have been used as access and supply shafts for the construction of the central section of the Gotthard Base Tunnel. The central lot consists of the two single lane tunnels with 9 km length each and also of the multifunction area Sedrun.
The preliminary works started in 1996 and were finished 2003 from when the first shaft was used as logistical access for the construction of the main tunnels. Until 2012 the whole operation of the tunnel construction as well as major parts of final fit out of the rail equipment has been carried out by using supply shaft 1. Shaft 2 which had been finished slightly later was mainly used as ventilation shaft and for transport of heavy and large sized equipment.
The presentation describes the construction-technology and the requirements with regard to the needs of the construction phase.
Die beiden 800 m tiefen Schächte am Gotthard-Basistunnel in Sedrun dienen in der Betriebszeit des Eisenbahntunnels als Zuluft- bzw. Abluftschacht und zur Aufnahme von Versorgungsleitungen. Für die Bauphase der beiden je 57 km langen Tunnelröhren wurden sie darüber hinaus zur Minimierung der Gesamtbauzeit als Zugangs- und Versorgungsschächte für den Bauabschnitt Mitte des Gotthard Basistunnels geplant und genutzt. Das Baulos Mitte umfasst die beiden Einspurtunnelröhren von je etwa 9 km Länge sowie die Multifunktionsstelle Sedrun.
Die Vorarbeiten und der Schachtbau begannen im Jahre 1996, ehe ab 2003 der erste Schacht als Ver- und Entsorgungsschacht für den eigentlichen Tunnelbau in Betrieb ging. Während des Zeitraums bis 2012 wurde der gesamte Baubetrieb einschließlich eines Teils des nachfolgenden Einbaus der Tunnelausrüstung im Wesentlichen über den Versorgungsschacht 1 abgewickelt. Der später abgeteufte Schacht 2 diente vornehmlich als Wetterschacht und als Transportschacht für schwere, sperrige Geräte und Ausrüstungen.
Der Beitrag beschreibt die ausgeführte Schachtbautechnik und die Anforderungen an die Ausstattung der Schächte für den Baubetrieb.
 
Source:     Geomechanics and Tunnelling 6 (2013), No. 5
 
Page/s:     603-614
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.64 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.