Logo Ernst und Sohn

Preview

Author(s):     
 
Bonapace, Paul; Hofer, Bernhard
 
Title:     
 

 
Abstract:     
 
The Tiroler Wasserkraft AG (Tiwag) currently operates eleven large hydropower stations (> 8 MW) and more than 30 smaller plants (< 5 MW) generating electricity for commercial consumption. Most of the larger stations are storage schemes in the high mountains, intended to be able to balance the opposing seasonal supply and demand situation in the Alps and current fluctuations in the network. The headrace tunnels and penstocks of the high-pressure power stations of Tiwag are some of the most highly loaded of their type in the world. Great emphasis is placed on sustainable use and low maintenance costs, starting with the construction. Some stations have already been in operation for more than 60 years. This article describes the experience with the headrace tunnels of some of the larger hydropower stations.
Bei der Tiroler Wasserkraft AG (Tiwag) sind elf große Wasserkraftwerke (> 8 MW) und über 30 Kleinanlagen (< 5 MW) in Betrieb, die elektrische Energie für den kommerziellen Gebrauch erzeugen. Die meisten Großanlagen sind als Hochgebirgsspeicherkraftwerke ausgelegt, um die jahreszeitlich entgegengesetzte Angebot- und Nachfragesituation in den Alpen sowie Stromschwankungen im Netz ausgleichen zu können. Die für die Hochdruckanlagen der Tiwag gebauten Triebwasserwege und Kraftabstiege gehören zu den am höchsten beanspruchten derartigen Anlagenteilen der Welt. Es wurde bereits beim Bau großer Wert auf eine nachhaltige Nutzung mit geringem Instandhaltungsaufwand gelegt. Manche Anlagen sind bereits seit über 60 Jahren in Betrieb. In diesem Beitrag werden die Erfahrungen mit den Triebwasserwegen einiger größerer Wasserkraftanlagen dargestellt.
 
Source:     Geomechanics and Tunnelling 8 (2015), No. 1
 
Page/s:     35-49
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (1.39 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.