Author(s):     
 
Posch, Helmut; Otto, Richard; Huber, Helmut; Murr, Roland; Kager, Matthias; Wagner, Hanns
 
Title:     
 
Recycling of tunnel excavation using the example of the Koralm Tunnel, contract KAT2 - Status April 2015 / Verwertung von Tunnelausbruch am Beispiel des Koralmtunnels, Baulos KAT2 - Stand April 2015
 
Abstract:     
 
Contract KAT2 will produce about 8.6 m. t of material excavated from the tunnel. In the course of the design work, maximum reuse of this material was intended, always considering economics and while reducing the environmental impact by minimizing transport and saving resources. More than half of the suitable tunnel spoil will be preliminarily screened and then processed for the production of aggregates for concrete production. After the first year of production, the high losses associated with the preliminary screening and processing demanded measures to improve the processing, which led to an improvement of the recycling quota. The aggregates produced on site so far fulfil the technical requirements for concrete production, even for high strength concrete grades.
Am Baulos KAT2 fallen insgesamt rund 8,6 Mio. t Tunnelausbruchmaterial an. In der Projektplanung wurde eine maximale Wiederverwertbarkeit des Ausbruchmaterials unter Berücksichtigung der Wirtschaftlichkeit bei einer geringen Umweltbelastung durch Minimierung der Transportvorgänge und eine weitgehende Ressourcenschonung angestrebt. Mehr als die Hälfte des geeigneten Tunnelausbruchmaterials wird für die Produktion von Gesteinskörnungen zur Betonherstellung vorabgesiebt und anschließend weiter aufbereitet. Die hohen Vorabsiebungs- und Aufbereitungsverluste erforderten nach dem ersten Produktionsjahr Verbesserungsmaßnahmen im Aufbereitungsprozess, die zu einer Erhöhung der Aufbereitungsquote führten. Die bisher vor Ort hergestellten Gesteinskörnungen erfüllen die technischen Anforderungen für die Betonerzeugung und darüber hinaus auch für Betonsorten mit hohen Druckfestigkeiten.
 
Source:     Geomechanics and Tunnelling 8 (2015), No. 4
 
Page/s:     340-347
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (1.34 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.