Logo Ernst und Sohn

Preview

Author(s):     
 
Mihaylov, Vladislav; Zenz, Reinhard
 
Title:     
 

 
Abstract:     
 
In the course of the construction of the new Wendlingen-Ulm line, the Boßler Tunnel with a length of 8,806 m is under construction between Aichelberg and Filstal. Both single-track main tunnel tubes are for the most part excavated by TBM and lined with segments. The main tunnel tubes have an overburden of up to 280 m and are separated by a rock pillar ranging in width from 5 to 30 m. For safety reasons, seventeen cross passages connect the main tunnels, each at a spacing maximum of 500 m. Cross passage excavation requires the opening of the main tunnel lining and therefore the removal of lining segments. In order to ensure stability of the tunnel lining during the construction phase, special lining segments are used for the main tunnel in cross passage areas. Special lining segments are adapted with additional reinforcement and built-in components. Shear forces in the circumferential joints are transmitted by shear dowels.
Im Zuge der Neubaustrecke Wendlingen-Ulm wird zwischen Aichelberg und Filstal der Boßlertunnel mit einer Länge von 8.806 m errichtet. Die beiden eingleisigen Haupttunnel werden vorwiegend maschinell aufgefahren und mit einer einschaligen Tübbingschale ausgebaut. Die Dicke des Gebirgspfeilers zwischen den beiden Röhren beträgt zwischen 5 und 30 m, die maximale Überlagerungshöhe ca. 280 m. Die beiden Haupttunnel werden in einem maximalen Abstand von 500 m mit insgesamt 17 Verbindungsbauwerken verbunden. Für den Vortrieb der Verbindungsbauwerke müssen die im Bereich der Tübbingöffnung verbauten Tübbinge ausgebaut werden. Um die Stabilität der Tübbingschale in der Bauphase sicherzustellen, werden die Tunnelröhren im Bereich der Verbindungsbauwerke mit Sondertübbingen, die entsprechend den zusätzlichen statischen und konstruktiven Anforderungen mit den erforderlichen Einbauteilen und zusätzlicher Bewehrung ergänzt werden, ausgeführt. Die Kraftübertragung im Bereich der Ringfuge erfolgt mit Schubdübeln.
 
Source:     Geomechanics and Tunnelling 12 (2019), No. 1
 
Page/s:     53-61
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (0.32 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.