Logo Ernst und Sohn

Preview

Author(s):     
 

 
Title:     
 

 
Abstract:     
 
Forecasts made during tunnelling of the daily advance, to control the machine, specify the lining and verify system behaviour are of great importance for safety and for the success of the whole project. In practice, such forecasts are obtained in deep tunnels by probe drilling, leading to downtime periods and by analog/digital face documentation with shorter downtime periods. Measurement and evaluation of rock mass cutting at the cutterhead of the TBM enables continuous monitoring without downtime. From the spatial distribution of the disc forces, basic geological/geotechnical information about the tunnel face can be derived. In addition, this data is valuable for load monitoring and monitoring the condition of the discs to determine the optimal changing time. This contribution deals with a geological-geotechnical interpretation of the disc forces of the open TBM on contract H33 Tulfes-Pfons of the Brenner Base Tunnel. The spatially distributed disc forces are evaluated and compared with the geological documentation.
Baubegleitende Prognosen für den täglich zu erwartenden Vortriebsablauf, die Steuerung der Maschine, die Ausbaufestlegung und die Überprüfung des Systemverhaltens sind wichtig für die Sicherheit und den Projekterfolg eines maschinellen Tunnelvortriebs. In der Praxis werden diese Prognosen bei tiefen Tunneln anhand von Vorauserkundungsbohrungen mit längeren Vortriebsstillständen und durch analoge/digitale Ortsbrustaufnahmen in halbtäglichen/täglichen Intervallen mit kurzen Vortriebsstillständen gewonnen. Eine kontinuierliche Überwachung ohne Bauverzug stellt die Messung und Auswertung des Gebirgslöseprozesses am Bohrkopf der TBM dar. Aus dem räumlichen Verlauf der Diskenkräfte können grundlegende geologische/geotechnische Informationen der Ortsbrust abgeleitet werden. Darüber hinaus sind diese Daten für die Last- und Zustandsüberwachung der Disken und den optimalen Zeitpunkt eines Diskenwechsels wertvoll. Dieser Beitrag befasst sich mit einer geologisch-geotechnischen Interpretationen der Diskenkräfte an der offenen TBM im Baulos H33 Tulfes-Pfons des Brenner Basistunnels. Dabei werden die ausgewerteten räumlichen Diskenkräfte der geologischen Aufnahme gegenüberstellt.
 
Source:     Geomechanics and Tunnelling 12 (2019), No. 5
 
Page/s:     586-594
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.96 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.