Logo Ernst und Sohn

Preview

Author(s):     
 

 
Title:     
 

 
Abstract:     
 
Tiroler Wasserkraft AG realized the extension of hydropower plant Kirchbichl located in the Unterinntal built in the 1940s for the first time. The excavation pits were retained by a bored pile wall with jet grouting connections between the piles, supported with up to two bracing horizons. Safety against uplift during construction stage is managed by a deep-set jet grouting plate, which is partially anchored. Due to the dismantling of the bracing during the construction progress a partially load transfer from the bored pile wall on the partly completed concrete construction and the jet grouted plate occurs. This interaction is simulated at the static calculations. The excavation shoring was calculated by using a geotechnical program. The resulting spring supporting forces from geotechnical consideration were used in the finite element model as loads on the new reinforced concrete walls to calculate the necessary reinforcement content during construction sequence. The results from construction sequence were perpetuated at final state of the new powerhouse structure to get the governing reinforcement content.
Das Bauvorhaben Kraftwerk Kirchbichl-Erweiterung der Tiroler Wasserkraft AG liegt im Unterinntal und dient in Zukunft als Erweiterung des in den 1940er-Jahren errichteten Wasserkraftwerks. Zur Sicherung der Baugruben wurden aufgelöste Bohrpfahlwände mit dazwischen liegenden DSV-Zwickeln abgeteuft und mit bis zu zwei Aussteifungshorizonten gegenseitig abgestützt. Die Auftriebssicherheit während des Bauzustands bildet eine hochliegende DSV-Platte mit teilweiser Verankerung. Mit fortschreitendem Bau erfolgt durch den Ausbau der Steifen eine partielle Lastübertragung von Bohrpfahlsystem auf den teilweise fertiggestellten Stahlbetonbau des KH 2 und die DSV-Sohle. Diese Bauwerksinteraktion wird in statischen Berechnungen simuliert. Die Baugrubenumschließung wird mit einem geotechnischen Programm ausgelegt. Die in der geotechnischen Betrachtung resultierenden Federauflagerkräfte werden wiederum als Kräfte auf die Krafthausstruktur für deren bewehrungstechnische Auslegung im Bauzustand angesetzt. In den statischen Berechnungen wird dieser Kraftzustand in den Endzustand weitergeführt; um dadurch die resultierende maximale Bewehrung zu erhalten.
 
Source:     Geomechanics and Tunnelling 13 (2020), No. 5
 
Page/s:     566-573
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.51 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.