Logo Ernst und Sohn

Preview

Title:     
 
Cover Picture: Steel Construction 1/2021
 
Abstract:     
 
The building of the San Giorgio bridge in Genoa re-establishes the connection between autoroutes A10 and A7 after the tragic event of the Morandi bridge collapse of 14 August 2018.
The bridge deck layout required the use of a torsionally rigid section. This was achieved, in particular, with two longitudinal beams spaced 7.00 m apart, a curved, calendared soffit and a top slab made of composite concrete.
The new bridge was opened on 3 August 2020, finally revealing the idea of the architect, Renzo Piano: A big, white vessel moored in the valley, a bridge that enters a dialogue with the sea, with the wind, with light, a structure that encourages builders to continue building bridges as links between territories and symbols of union. (Sarcina, G. et al., pp. 14-21)
 
Source:     Steel Construction 14 (2021), No. 1
 
Page/s:     
 
Language of Publication:     English



Download article free of charge

The following article is available at no additional cost (PDF - 0.29 MB)
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.

I would like to order "Steel Construction"

This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.