Logo Ernst und Sohn

Preview

Author(s):     
 
Horny, Ulrich; Bayer, Lars; Schiesser, Karl; Kliem, Olaf
 
Title:     
 
Metro Doha Green Line: Fibre reinforced tunnel linings - Design and construction experience
 
Abstract:     
 
The Design and Build project “Metro Doha Green Line Underground” has been awarded to a joint venture composed of Porr, the Saudi Bin Ladin Group and HBK in summer 2013. It contains the “ready to use” construction of the underground part of the Green Line with 2 × 17 km tunnels, six stations, switching areas as well as cross passages and emergency exit shafts. The 34 km of tunnelling, realized with six EPB machines simultaneously, have been completed in only 18 months. The main impact on the determination of the design and build specification in terms of the segmental ring design is based on the extraordinary geological environment properties of the project area of Doha City. The geology is characterized by a dominating 3-rocklayers system comprising massive upper and lower limestone deposits, which are commonly separated by a thin shale layer. Additionally, and in regard to the nearby located sea-side the type of identified aggressive exposure conditions relevant to the concrete segment lining in terms of significant sulphate and chloride impact requires a durable reinforcement solution fit for required 120-year service life. Especially due to chloride attack an ordinary steel bar reinforcement system including a projected 90 mm nominal concrete cover at lining's intrados and extrados turns out statically difficult and constructionally non-practicable. Therefore, steel fibres are chosen to meet the strict design constraints.
 
Source:     Geomechanics and Tunnelling 14 (2021), No. 4
 
Page/s:     347-355
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.76 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.