Logo Ernst und Sohn

Preview

Author(s):     
 
Gasser, Oliver; Haidenthaller, Christoph; Magnusson, Robert; Laubreiter, Felix
 
Title:     
 

 
Abstract:     
 
The Stockholm bypass (E4 Förbifart Stockholm) is being built by the Swedish Transport Administration (Trafikverket) - the office responsible for transport infrastructure in Sweden. The project aims to improve connections between the regional town centres and reduce congestion on the main urban roads. The route, which runs mainly underground, employs numerous contractors and has a planned construction period of 14 years, preceded by a 10-year planning phase. This article looks at three projects: the FSE 61 Akalla Interchange, the FSE 309 Lovön Interchange and in particular, the FSE 613 Akalla Tunnel. The Akalla Tunnel is driven as a conventional full-face excavation with pre-grouting and supported with rock bolts and steel-fibre-reinforced shotcrete. The tunnel excavation is followed by the interior work comprising precast concrete walls, a suspended membrane reinforced with shotcrete, ceiling foundations and the carriageway structure.
Im Auftrag des schwedischen Zentralamts für Verkehrsinfrastruktur (Trafikverket) wird die Umfahrung Stockholms (E4 Förbifart Stockholm) errichtet. Das Projekt zielt darauf ab, die regionalen Stadtzentren besser zu verbinden und soll die Auslastung der städtischen Hauptverkehrsstraßen reduzieren. Die hauptsächlich unterirdisch verlaufende Straßenführung beschäftigt zahlreiche Auftragnehmer und hat eine geplante Bauzeit von 14 Jahren, der eine zehnjährige Planungsphase vorausgeht. In diesem Artikel wird auf die Projekte FSE 61 Verkehrsknoten Akalla, FSE 309 Verkehrsknoten Lovön und vorwiegend auf FSE 613 Tunnel Akalla eingegangen. Der Tunnel Akalla wird konventionell im Vollausbruch mit Vorausinjektionen aufgefahren und durch Felsanker und Stahlfaserspritzbeton gesichert. Dem Tunnelausbruch folgt der Innenausbau mit Betonfertigteilwänden, abgehängter mit Spritzbeton verstärkter Membran, Deckenfundamenten und dem Fahrbahnaufbau.
 
Source:     Geomechanics and Tunnelling 14 (2021), No. 6
 
Page/s:     697-707
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (3.71 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.