Logo Ernst und Sohn

Preview

Author(s):     
 
Magursi, Leonardo; Zurlo, Raffaele; Sorbello, Rosario
 
Title:     
 
Dynamic evaluation of the top-down construction of the Belfiore high-speed railway station
 
Abstract:     
 
The construction phase of underground railway stations executed with top-down method is often susceptible to a considerable number of interferences. The interference between the excavation of the Florence high-speed station and tunnels' execution is a critical element of the Florence underpass project, which foresees the simultaneous construction of the two infrastructures. The project's complexities and the interference between the various construction phases have been studied and resolved by developing the entire project in a Building Information Modeling (BIM) environment. In particular, the implemented four-dimensional (4D) BIM model managed to simulate the possible macrophases and identify an optimal construction solution or, at least, the crucial actions to be taken to ensure the simultaneous construction of the station and tunnels. The 4D BIM model allowed an accurate simulation of the specific critical construction phases by identifying spatial interferences between completed works, temporary structures, and overlapping interventions. Consequently, it was possible to adopt appropriate technical solutions and develop a reliable work plan. In addition, it was possible to verify the potential scenarios of the TBM passage through the excavated station, which allowed to foresee some specific interventions needed to ensure works' continuity. The BIM methodology also allowed to find optimal solutions in a reasonable time, preventing a significant use of resources.
 
Source:     Geomechanics and Tunnelling 15 (2022), No. 2
 
Page/s:     201-206
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (0.85 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.