Logo Ernst und Sohn

Preview

Author(s):     
 

 
Title:     
 
New built and refurbished railway tunnels: Data delivery from BIM Models to OEBB's asset management
 
Abstract:     
 
Digitalisation in the construction industry has been progressing continuously and bringing major changes for everyone involved in virtually all areas. Austrian Federal Railways ÖBB has been pushing BIM (Building Information Modelling) for the construction and rehabilitation of their infrastructure. By means of various pilot projects, the basics and the processes required for design and construction are developed and applied with a strong focus on system operation. For Granitztal tunnel and a total length of ≈6.1 km, the as-built design of the civil structures is done with an element-based, open BIM model. As part of the handover to the maintenance and operation division, the data of civil structures relevant for operation are derived from the BIM model, validated by means of automatic methods and transferred to the facility management system (AVS, Anlagen-Verzeichnis-System). In the absence of an IFC (Industry Foundation Class) structure tunnel, a semantic and spatial data structure is developed. Furthermore, the model will be enriched with components of railway equipment. On the other hand, there is the over-100-year-old Karawanks tunnel as part of the railway section between Villach and Jesenice. The line has been in operation since 1906 and includes the ≈8 km-long, single-tube Karawanks tunnel. The current situation of the tunnel including the superstructure and technical equipment no longer meets performance, safety and durability requirements and is being rehabilitated within an international cooperation project between Austria and Slovenia. The focus in this BIM project is set on the as-built design and merging data of the existing historic tunnel structure with information of new components implemented during refurbishment. A core task is the structured transfer of data contained in the BIM model to the facility/asset management system of ÖBB (AVS) and the Slovenian infrastructure operator. The case histories of Granitztal tunnel and Karawanks tunnel are used to describe the implementation of BIM, including the development of required data structures, validation mechanisms and data delivery to the asset management.
 
Source:     Geomechanics and Tunnelling 15 (2022), No. 2
 
Page/s:     190-200
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.11 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.