abo_gift abo_online abo_print abo_student abo_test angle_left angle_right angle_right_filled arrow_big_down arrow_big_down_filled arrow_big_left arrow_big_left_filled arrow_big_right arrow_big_right_filled arrow_big_up arrow_big_up_filled arrow_dropdown_down arrow_dropdown_up arrow_small_left arrow_small_left_filled arrow_small_right arrow_small_right_filled arrow_stage_left arrow_stage_left_filled arrow_stage_right arrow_stage_right_filled caret_down caret_up close close_thin close_thin_filled contact download_thick download_thick_filled download_thin download_thin_filled ebook edit element_headline element_label element_relatedcontent lock mail minus page page_filled pages pages_filled phone plus print print_filled quotationmarks_left quotationmarks_right search send share share_filled shoppingcart_big shoppingcart_big_filled shoppingcart_header shoppingcart_small shoppingcart_small_filled social_facebook social_googleplus social_linkedin social_pinterest social_twitter social_xing social_youtube user_big user_small

Artikeldatenbank

Filter zurücksetzen
  • Autor(en)

  • Sprache der Veröffentlichung

  • Erschienen

  • Rubrik

Zeitschriften-Selektion

  • Alle auswählen Alle abwählen
Autor(en) Titel Zeitschrift Ausgabe Seite Rubrik
DBV-Heft 29 "Sichtbeton im Team - Vom architektonischen Entwurf bis zur Abnahme" erschienen Bautechnik 6/2014 413 Firmen und Verbände

Kurzfassung

Keine Kurzfassung verfügbar.

x
Ortlepp, Regine; Schiller, Georg Baumaterialien in deutschen Nichtwohngebäuden - eine Analyse Bautechnik 6/2014 414-424 Aufsätze

Kurzfassung

Die Schonung der natürlichen Ressourcen rückt mehr und mehr in den Fokus der Politik. Es ist zu erwarten, dass sich dieser Perspektivenwechsel zukünftig auch auf das Bauwesen auswirken wird. Zur Beurteilung des künftigen Bedarfs an Baustoffen sind neben verlässlichen Prognosen über die Bautätigkeit sowohl im Neubau als auch in der Sanierung Kenntnisse über die Baustoffmengen erforderlich, welche sich durch Rückbaumaßnahmen aus der bestehenden Bausubstanz als Recyclingbaustoffe wiedergewinnen lassen. Die Basis für eine systematische und wirtschaftliche Nutzung im Sinne der Kreislaufführung bildet dabei das Wissen über die Menge und Verteilung der Baustoffe, denn der erreichbare Verwendungsgrad hängt neben bautechnischen Anforderungen an die Bauprodukte auch von der Verfügbarkeit entsprechender Rezyklatmengen im Verhältnis zum allgemeinen Bedarf an Baustoffen ab.
Dieser Beitrag richtet sich thematisch an die Fachverbände der Baustoffhersteller, Planer und weitere für Ausschreibungen verantwortliche Personen. Er soll zukünftige Entwicklungstendenzen der politischen Rahmensetzung aufzeigen sowie Einblicke in den Bauwerksbestand geben. Der Artikel behandelt am Beispiel von Nichtwohngebäuden in Deutschland die Thematik der Baumaterialzusammensetzung. Verschiedene Datenbanken werden vorgestellt und hinsichtlich der Qualität bezüglich der daraus ableitbaren Informationen bewertet. Die Auswertung der aktuellen Bautätigkeitsstatistik gibt einen Eindruck von der quantitativen Verteilung der hauptsächlich verwendeten Baustoffe über verschiedene Nichtwohngebäudearten. Diesem wird vergleichend das Ergebnis einer Analyse auf Basis der BKI-Objektdatenbank gegenübergestellt. Am Beispiel von landwirtschaftlichen Bauten wird gezeigt, an welchen Stellen am Gebäude sich die wesentlichen Materialdepots befinden und welche Quantität diese haben.

Building materials in German non-residential buildings - an analysis
The preservation of the natural resources moves more and more into the focus of the politics. It is expected that this shift in perspective will have a future effect on the building and construction industry too. To the judgement of the future requirements for building-materials knowledge is required besides reliable forecasts about the building activity both in the new construction and in the rehabilitation also about the amounts of building-materials which can be regained by deconstruction measures as recycling material from the existing built volumes. The knowledge about the amount and distribution of the building-materials forms the base for a systematic and economic use in terms of circular flow because the attainable level of utilisation also depends on the availability of corresponding amounts of recycled material besides structurally engineered requirements on the building materials in proportion to the general requirements for building-materials.
This contribution is thematically particularly aimed at the trade associations of the building-material manufacturers, planners and further persons responsible for announcements. It shall show future evolutional trends of the legislative framework and give insights into the building stock. The article deals with the topic of the building material composition at the example of non-residential buildings in Germany. Different databases are introduced and judged with regard to that one of the quality regarding the information derivable from it. The evaluation of the current building activity statistics gives an impression about the quantitative distribution of the building-materials used mainly over different kinds of non-residential buildings. The result of an analysis based on the BKI object database is opposed to it comparatively. It is shown at the example of agricultural buildings in which places the essential material depositories are located and which quantity these have in the building.

x
Wagner, Tobias; Unglaub, Julian; Thiele, Klaus Ansatz zur Risserkennung in Stahlblechen anhand der Verzerrung von Lamb-Wellen Bautechnik 6/2014 425-429 Aufsätze

Kurzfassung

In der hier vorgestellten Arbeit wird die Materialermüdung von Stahlproben anhand der Verzerrung von Lamb-Wellen untersucht. Gekerbte Stahlproben werden zyklisch auf Zug bis zum Bruch im Low-Cycle-Fatigue (LCF) belastet. In Abständen von 1000 Lastzyklen wird die Prüfmaschine angehalten. Ein Aktuator regt Lamb-Wellen bei einzelnen Frequenzen und Frequenzbändern im Bereich von 1 bis 500 kHz an. Nachdem die Lamb-Wellen die Kerbe durchlaufen haben, werden sie von einem Sensor aufgenommen. Die Auswertung der gemessenen Spektren zeigt, dass die mittlere Amplitude mit zunehmender Materialermüdung kleiner wird. Diese Ergebnisse bieten die Grundlage zur Entwicklung eines möglichst robusten Verfahrens zur Risserkennung. Ein wesentlicher Vorteil eines solchen Ansatzes ist, dass kurz vor der Entstehung sichtbarer Risse die Materialermüdung erkannt werden kann, ohne dass dafür Referenzmessungen des ungeschädigten Bauwerks nötig sind.

Lamb-wave distortion as approach to detect cracks in steel plates
The work presented here examines fatigue of steel specimens based on harmonic-distortion of Lamb-waves. Cyclic tension load is applied on notched steel specimens until failure under Low-Cycle-Fatigue (LCF) occurs. The fatigue test is interrupted every 1000 load cycles. An actuator excites Lamb-waves with singular frequencies and frequency bands in a range from 1 to 500 kHz. After the Lamb-waves passed the notch they are recorded by a sensor. Analysing the spectra shows a declining of the average amplitude with increasing material fatigue. These results provide an approach to develop a robust crack detection methodology. A major advantage of such an approach is the ability to detect cracks at least shortly before they become visible without requiring reference measurements of the undamaged structure.

x
Priebe, Heinz J. Die Setzung von Fundamenten auf unterschiedlichen Gründungen mit eingeschränkter Lastausbreitung Bautechnik 6/2014 430-437 Aufsätze

Kurzfassung

Die Gründung von Fundamenten lässt sich prinzipiell zwischen dem Grenzfall der ‘flachen’ Gründung auf unbehandeltem Untergrund und dem der ‘tiefen’ auf Pfählen einordnen. Im ersten Fall breitet sich die Spannung aus der gesamten Fundamentlast im Baugrund systematisch aus. Es treten mehr oder weniger große Setzungen auf, die zumindest bei kleinen Fundamenten wegen der Spannungsausbreitung mit der Tiefe verhältnismäßig schnell abklingen. Im zweiten Fall leiten Pfähle fast die gesamte Last in Bodenschichten mit hoher Tragfähigkeit ab. Obwohl es zu keiner nennenswerten entlastenden Spannungsausbreitung kommt, sind die Setzungen dann auch bei hoher Last wegen der großen Pfahlsteifigkeit gering.
Zwischen diesen Grenzfällen gibt es viele Gründungsarten oder -kombinationen, die in ihrem Setzungsverhalten weniger leicht einzuschätzen sind. Sie reichen von der sogenannten Pfahl-Plattengründung bis zu bodenverbessernden Maßnahmen. In all diesen Fällen konzentriert sich die Lastabtragung auf den bewehrten oder verbesserten Baugrund unter dem Fundament, aber ein mehr oder weniger großer Teil der Fundamentlast wird auch nach außen auf den unbehandelten Boden abgegeben. Dieser abfließende Teil, nachstehend als Lastausbreitung bezeichnet, lässt sich oft schwer bestimmen. Da er aber eine erhebliche Rolle im Hinblick auf das Setzungsverhalten der Gründung spielen kann, wird hiermit ein brauchbares Berechnungsverfahren vorgestellt, das die jeweilige Lastausbreitung näherungsweise berücksichtigt.

The settlement of footings on different kinds of subsoil treatment with reduced load distribution
In principal, the foundation of footings can be ranked between the border case of a shallow foundation on unimproved ground and a deep foundation with piles. In the first case the pressure of the total load spreads systematically in the subsoil. More or less large settlements occur but - at least in the case of small footings - they decrease fairly quickly due to the spreading of the pressure with the depth. In the second case piles transfer the load directly to soil strata with high bearing capacity. Although no notably relieving spreading of pressure occurs settlements are small even at a high load due to the stiffness of the piles.
In between these two cases there are many foundation methods or combinations with settlement performances that cannot easily be evaluated. They range from the so-called pile-plate foundation to soil improvement below the foundation. In all these cases the load pressure concentrates on the reinforced or improved subsoil under the foundation. However, either more or less of it is delivered to the untreated soil around. This ”escaping” part, hereinafter called “load distribution” is often difficult to be determined. It may, however, be of substantial importance with regard to the settlement behaviour, so this is to introduce a suitable approximation to consider in a settlement calculation the appropriate load distribution.

x
Busse, Daniel; Empelmann, Martin Stahlbetonfachwerke - ein ungenutztes Potenzial? Bautechnik 6/2014 438-447 Aufsätze

Kurzfassung

Bereits zu Beginn des 20. Jahrhunderts werden von der jungen “Eisenbetonbauweise” die Fachwerkkonstruktionen des Holz- und Stahlbaus adaptiert. Der vorliegende Beitrag zeigt die daraufhin einsetzende Entwicklung des Betonfachwerkbaus über nun mehr als 100 Jahre. Von den großen Ortbetonkonstruktionen der Stahlbetonpioniere über die vorgefertigten, typisierten Strukturen der 1950er- und 1960er-Jahre bis hin zu aktuellen Ansätzen zur modularen Gestaltung von Stahlbetonfachwerken werden anhand ausgewählter Beispiele entscheidende Entwicklungsschritte dargestellt. Obwohl die Anwendung der Stahlbetonfachwerke, vor allem aufgrund der ausführungstechnischen Schwierigkeiten, bis heute nur in Einzelfällen erfolgt, zeigt die Betrachtung der historischen sowie der aktuellen Entwicklungen das erhebliche Potenzial dieser Konstruktionen.

Concrete truss structures - an untapped potential?
At the beginning of the 20th Century wooden and steel trusses had been adapted by the young concrete architecture. This paper shows the following development of concrete truss structures until today. Starting with the major truss structures made up by the pioneers of concrete constructions, looking at the prefabricated, standardised truss structures of the 1950s and 60s and finally the current modular approaches, crucial steps in development are illustrated by selected examples. Although concrete truss structures, mainly due to technical difficulties, are still only used in individual cases, the historical as well as the current developments show the significant potential of these constructions.

x
Bautechnik aktuell 6/2014 Bautechnik 6/2014 449-452 Bautechnik aktuell

Kurzfassung


Nachrichten:
Deutscher Bautechnik-Tag 2015 in Düsseldorf: Call for Papers. / Die neue Fassung der DIN EN 1997-1:2014-03 (Eurocode 7-1) wird nicht bauaufsichtlich eingeführt! (Dr.-Ing. B. Schuppener)

Persönliches: Professor Dr.-Ing. habil. Fritz-Ferdinand Zitscher verstorben. (Georg Heerten)

Firmen und Verbände: Bundesstiftung Baukultur und Förderverein starten gemeinsame Aktion “Die Bundesstiftung Baukultur stärken. / DWA übernimmt Programm des F. Hirthammer Verlags.

Auslobung: Karl-Imhoff-Preis der DWA ausgeschrieben. / Neue Runde im Wettbewerb “Auf IT gebaut - Bauberufe mit Zukunft”.

x
Kongresse - Symposien - Seminare - Messen Bautechnik 6/2014 453-454 Veranstaltungskalender

Kurzfassung

Keine Kurzfassung verfügbar.

x
Inhalt: Beton- und Stahlbetonbau 6/2014 Beton- und Stahlbetonbau 6/2014 Inhalt

Kurzfassung

Keine Kurzfassung verfügbar.

x
Blaschko, Michael Sind Sie fit? Beton- und Stahlbetonbau 6/2014 375 Editorial

Kurzfassung

Keine Kurzfassung verfügbar.

x
Schmidt, Jörg; Orgass, Marko; Renger, Steffen; Dehn, Frank Tunnel Königshainer Berge - Vom Brandschaden zum Instandsetzungskonzept Beton- und Stahlbetonbau 6/2014 376-383 Fachthemen

Kurzfassung

Am 18. Mai 2013 kam es ca. 600 m vor dem östlichen Tunnelportal zu einem LKW-Brand in der Südröhre des Tunnels Königshainer Berge. Nach dem Brand waren im Bereich der Unglücksstelle Betonabplatzungen festzustellen. Zur Bewertung des Schädigungsgrads an Tunnelschale, Dichtung, Dränage, Kabelleerrohren, Kappen, Entwässerung, Schlitzrinne, Markierung und Fahrbahn wurden mit dem Ziel der Ableitung von Instandsetzungsmaßnahmen experimentelle Untersuchungen und numerische Berechnungen durchgeführt. Unter Zugrundelegung der ermittelten Brandlast wurde die Temperaturbeanspruchung der Tunnelschale orts- und zeitabhängig bestimmt, um mit diesen Informationen das Durchwärmungsverhalten zu berechnen und die statisch-konstruktiven Auswirkungen auch im Vergleich zu den experimentellen Untersuchungen und Werkstoffprüfungen zu verifizieren. Im Ergebnis der Untersuchungen konnte ein Instandsetzungskonzept für den Konstruktionsbeton abgeleitet und umgesetzt werden.

Tunnel Königshainer Berge from fire incident to repair concept
On May 18, 2013, a truck fire happened in the southern tube of the Tunnel Königshainer Berge - 600 m before the eastern tunnel portal. After the fire, concrete spalling was observed in the crash area. For the evaluation of the damage degree of tunnel lining, sealing, drainage, cable ducts, sidewalks etc. experimental investigations and numerical calculations have been conducted in order to derive repair measures. On the basis of the evaluated fire load, the temperature loading on the tunnel lining was determined - both site- and time-orientated. These information were used to calculate the temperature ingress and distribution and to verify the static and structural effects in comparison to the experimental investigations and material tests. As a conclusion, a repair concept for the structural concrete was derived and executed.

x
Bolle, Guido; Schacht, Gregor; Marx, Steffen Spannbetonbau in der DDR - Anwendung und experimentelle Untersuchung des ITB-Spannverfahrens Beton- und Stahlbetonbau 6/2014 384-393 Fachthemen

Kurzfassung

Der Beitrag gibt einen Überblick über die in der ehemaligen DDR eingesetzten Spannverfahren und stellt eines davon, das Verfahren ITB, ausführlich vor. Beim Abbruch der Brücke des 10. Jahrestages in Neubrandenburg, bei deren Errichtung dieses Spannverfahren erstmals zum Einsatz kam, wurden Material- und Bauteilproben entnommen und diese experimentell untersucht. Mit dem Ziel, das Schubversagen eines Spannbetonbauteils ohne schlaffe Betonstahlbewehrung zu untersuchen, wurde ein aus der Brücke herausgetrennter Träger einem Bruchversuch unterzogen, wobei verschiedene Messverfahren, wie die Photogrammetrie, die Schallemissionsanalyse und die bereichsweise Krümmungsmessung zum Einsatz kamen. Die Ergebnisse dieser experimentellen Untersuchungen werden ausführlich vorgestellt und das Tragverhalten hinsichtlich einer Versagensvorankündigung bewertet.

Investigations on a pre-stressed concrete bridge beam without pre-tensioned reinforcement
The paper gives an overview of the pre-stressing systems used in the former GDR and describes one system, called ITB, in detail. During the demolition of the bridge “10. Jahrestag” in Neubrandenburg, at which this pre-stressing system was first used, material samples and a specimen were taken and experimentally investigated. For the objective of the investigation of a pre-stressed concrete element without non-pre-stressed reinforcement, a cut out beam of a bridge was loaded until failure and different measuring technologies, like the photogrammetry, the acoustic emission analyses and the sectionwise curvature-measurement were used. The results of this experimental investigation are discussed in detail and the bearing behavior according to an unannounced failure is evaluated.

x
Sichtbeton im Team Beton- und Stahlbetonbau 6/2014 393 Aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
Amsler, Michael; Thoma, Karel; Heinzmann, Daniel Mit Aufbeton verstärkte Durchstanzplatte - Versuch und Nachrechnungen Beton- und Stahlbetonbau 6/2014 394-402 Fachthemen

Kurzfassung

Sowohl restriktivere Anforderungen an den Durchstanzwiderstand [5, 8, 9] als auch höhere Einwirkungen erfordern bei punktgestützten Flachdecken oft deren Verstärkungen. In diesem Beitrag wird eine Verstärkung mit Aufbeton und zusätzlicher Querkraftbewehrung diskutiert. Dazu wird ein an der Hochschule Luzern - Technik & Architektur durchgeführter Durchstanzversuch mit Aufbeton [4] vorgestellt. Bei diesem Versuch wurde eine unverstärkte Durchstanzplatte vorbelastet und nach einer teilweisen Entlastung mit einem bewehrten Aufbeton und nachträglich eingebauter Querkraftbewehrung verstärkt und bis zum Bruch belastet. Nach der Beschreibung des Bauteilversuchs werden die Messresultate dargestellt und die Bruchlast mit den Berechnungsergebnissen ausgewählter Theorien zur Berechnung des Durchstanzwiderstands verglichen. Dabei wird untersucht, wie sich die Wahl der statischen Nutzhöhe der verstärkten Platte auf das Last-Verformungs-Verhalten resp. den Durchstanzwiderstand der Platte auswirkt. Zum Abschluss wird aufgezeigt, in welchen Bereichen weiterer Forschungsbedarf besteht.

Punching slab strengthened with an additional concrete layer - Test and recalculations
Due to more restrictive requirements for the punching resistance [5, 8, 9] as well as increased loads, point supported flat slabs often need strengthening. In this paper, a strengthening method consisting of an additional concrete layer and additional shear reinforcement is discussed. Thereto a punching test with an additional concrete layer [4] carried out at the Department of Engineering and Architecture of the Lucerne University of Applied Sciences and Arts is presented. In this test a non-strengthened punching slab is preloaded, partially unloaded, reinforced with an additional concrete layer and shear reinforcement and then loaded to failure. After a description of the structural member test, the measurements are presented and the failure load is compared to the punching resistances calculated with selected theoretical models. Within this context it is analysed how the chosen effective depth of the strengthened slab influences the load and deformation behaviour as well as the punching resistance of the slab. Finally, areas requiring further research are pointed out.

x
Verfahrensmechaniker Transportbeton Beton- und Stahlbetonbau 6/2014 402 Aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
Grünberg, Jürgen; Göhlmann, Joachim; Marx, Steffen Mechanische Modelle für mehraxiales Festigkeits- und Ermüdungsversagen von Stahlbeton Beton- und Stahlbetonbau 6/2014 403-416 Fachthemen

Kurzfassung

Räumliche Beanspruchungssituationen haben erhebliche Auswirkungen auf die Betonfestigkeit. Das gilt sowohl für monoton steigende als auch für zyklische Belastung. Ausgehend von zwei geeigneten mehraxialen Festigkeitsmodellen werden mechanische Modelle für das Ermüdungsversagen von Normalbeton sowie von hochfestem und ultrahochfestem Beton entwickelt. Für Normalbeton werden in das Fünfparametermodell nach WILLAM/WARNKE zwei Schädigungsvariablen eingeführt, welche über einen energetischen Ansatz die Erfassung der Schädigung aus zyklischer Beanspruchung erlauben. Mit dem darauf aufbauenden schädigungsabhängigen Verlauf der Verzerrungsentwicklung können in numerischen Simulationen von Tragstrukturen Spannungsumlagerungen realitätsnah abgebildet werden. Für die Beschreibung des Ermüdungsversagens von hochfestem und ultrahochfestem Beton ist das Dreiphasenmodell nach GRÜNBERG wesentlich besser geeignet als das Fünfparametermodell. Verschiedene Bereiche des Modells wurden anhand mehraxialer Laborversuche kalibriert. Zur vollständigen Validierung sind weitere Versuche erforderlich, besonders im Bereich hoher Lastwechselzahlen.

Mechanical Models for concrete failure under monotonically increasing as well as cyclic multiaxial loading
Triaxial stress states have a considerable effect on the material strength of concrete in case of both, monotonically increasing as well as cyclic loads. Based on two suitable multiaxial strength models mechanical models for the fatigue failure of normal strength concrete respectively high-performance and ultra-high-performance concrete are developed. The five parameter model by WILLAM/WARNKE is used for normal strength concrete. Two energy based damage variables were introduced into the model, which allow the mathematical description of damage from cyclic loading. Using this model in numerical simulations of structures the evolution of strains and the damage-depending redistribution of stresses can be displayed realistically. For the description of the fatigue failure of high-performance and ultra-high-performance concrete, the three-phases model by GRÜNBERG is more appropriate than the five-parameter model. Several areas of the model were calibrated using triaxial laboratory tests. To fully validate the model, further tests are required, especially in the range of high numbers of load cycles.

x
Umsatz mit Betonbauteilen legte 2013 wohl leicht zu Beton- und Stahlbetonbau 6/2014 416 Aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
PORR erhält drei Baulose im Wiener U-Bahn-Netz im Gesamtwert von 68 Mio. Beton- und Stahlbetonbau 6/2014 416 Aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
Schmidt, Wolfram; Kühne, Hans-Carsten; Haamkens, Frank Shewhart- und CUSUM-Kontrollkarten zur gleichzeitigen Prozesssteuerung und Konformitätsbewertung - Neue Nachweisverfahren der Konformität in der zukünftigen EN 206 Beton- und Stahlbetonbau 6/2014 417-427 Fachthemen

Kurzfassung

Im Hinblick auf die Konformitätsbewertung der Druckfestigkeit von Beton wird es in der für 2014 geplanten Fassung der EN 206 signifikante Änderungen geben. Neben den bisher bekannten Verfahren werden auch sogenannte Kontrollkartensysteme als Konformitätsnachweis zugelassen. Dabei können beliebige Kontrollkartensysteme verwendet werden, sofern nachgewiesen werden kann, dass der maximale Durchschlupf (Average Outgoing Quality Limit, AOQL) 5 % beträgt. Im informativen Normenanhang werden zwei grundlegende Verfahren, das sogenannte Shewhart-Verfahren sowie das CUSUM-Verfahren (Cumulative Sum) beschrieben, welche beide die Forderung an das AOQL erfüllen.
Kontrollkartensysteme sind eigentlich Werkzeuge zur Prozesssteuerung. Sie können effektiv dabei helfen, die Produktion technisch, ökonomisch und ökologisch zu optimieren. Allerdings sind Kontrollkarten deutlich komplexer in der Anwendung als die bisher normativ erfassten Methoden. Der vorliegende Beitrag stellt die neuen Verfahren und deren Besonderheiten anhand von Beispielen vor. Darüber hinaus werden der Zusatznutzen bei sachgerechter Anwendung im Vergleich und Vor- und Nachteile zu den bisherigen Verfahren dargestellt und diskutiert.

Shewhart and CUSUM Control Charts for simultaneous process control and conformity assessment - New conformity verification methods for the upcoming EN 206
With regard to the conformity assessment of the compressive strength of concrete, there will be significant changes in the EN 206, which is scheduled for publication in 2014. So called control chart systems will be approved supplementary to the existing methods. Any control chart can be used as long as the system can grant an average outgoing quality limit (AOQL) of 5 %. The informative appendix of the standard presents two fundamental control chart methods, the so called Shewhart method and the CUSUM method (cumulative sum), both of which fulfill the required AOQL.
Control card systems are actually tools for process control. They can effectively help to optimise production processes technically, economically, and ecologically. However, control charts are much more complex to use than the methods known from the recently applied standard. This paper presents these new methods and their characteristics using examples. Furthermore, the additional benefit of these systems is illustrated and advantages and disadvantages are discussed in comparison to existing methods.

x
Bastert, Heinrich; Meyer, Lars Instandhaltungskonzepte für Parkbauten als Ergebnis der Bedarfsplanung Beton- und Stahlbetonbau 6/2014 428-434 Berichte

Kurzfassung

Bei der Planung sowohl neuer Betonbauwerke als auch für Instandsetzungen bestehender Objekte sind die Aspekte Wartung und Instandhaltung gemäß einschlägigen Normen und Regelwerken von Anfang an zu berücksichtigen. Dies ist sowohl für den Erhalt von Stand- und Verkehrssicherheit der Baukonstruktion als auch im Sinne der uneingeschränkten Gebrauchstauglichkeit des Bauwerks unabdingbar. Der Umfang planmäßig erforderlicher Instandhaltungsmaßnahmen hängt dabei wesentlich von der gewählten Baukonstruktion ab. Insbesondere bei Parkbauten in Betonbauweise beeinflusst die gewählte Ausführungsvariante wesentlich die erforderlichen Inspektions- und Wartungsmaßnahmen. Diese führen über den Lebenszyklus, neben den daraus unmittelbar entstehenden Kosten, zu unterschiedlichen Nutzungseinschränkungen und damit möglicherweise zu Einnahmeausfällen. Hieraus ergibt sich, dass bereits bei der Konzeption von Parkbauten die diesbezüglichen Erwartungen und Bedürfnisse des Bauherrn bzw. Betreibers berücksichtigt werden sollten. Zu deren systematischer Erfassung bietet sich ein methodisches Vorgehen im Rahmen einer Bedarfsplanung für Parkbauten an, die sich darüber hinaus zur umfassenden Dokumentation der Planungsziele auf Basis definierter Bauherrenwünsche eignet.

Maintenance concepts for parking facilities as results of a design brief
Structural design of new concrete constructions as well as repair of existing buildings from the very beginning have to follow the relevant standards and guidelines concerning maintenance and repair. This is also necessary to preserve stability, traffic safety, and usability of the building. The designed and required measurements basically depend on the selected construction method or design option. Especially in case of parking facilities built in reinforced concrete the selected design option requires certain inspection and maintenance activities that also concern the commercial viability. The brief for building design or identification of needs is a recommended tool that is appropriate for parking facilities to systematically capture the needs of the client/user and to document them in a design brief.

x
Beton- und Stahlbetonbau aktuell 6/2014 Beton- und Stahlbetonbau 6/2014 435-440 Beton- und Stahlbetonbau aktuell

Kurzfassung


Persönliches:
Jürgen Grünberg - 70 Jahre / Nachrichten: Ingenieurpreis 2015 ausgelobt / Die Entscheidung zur Ausführung des Betongartens BUGA 2015 ist gefallen / Neue Runde im Wettbewerb “Auf IT gebaut - Bauberufe mit Zukunft” / Faszination Achterbahn - Ingenieurnachwuchs ausgezeichnet / Bibliotheca Mechanico-Architectonica (BMA) / Deutscher Bautechnik-Tag 2015 in Düsseldorf: Call for Papers / Ingenieurmangel verschärft sich - Gehälter steigen

x
Voormann, Friedmar Bücher: Das Bauunternehmen Dyckerhoff & Widmann Beton- und Stahlbetonbau 6/2014 440-441 Beton- und Stahlbetonbau aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
Kongresse - Symposien - Seminare - Messen Beton- und Stahlbetonbau 6/2014 442 Veranstaltungskalender

Kurzfassung

Keine Kurzfassung verfügbar.

x
Content: Geomechanics and Tunnelling 6/2014 Geomechanics and Tunnelling 6/2014 Content

Kurzfassung

Keine Kurzfassung verfügbar.

x
Galler, Robert 9th Austrian Tunnel Day / 9. Österreichischer Tunneltag Geomechanics and Tunnelling 6/2014 642-643 Editorial

Kurzfassung

Keine Kurzfassung verfügbar.

x
News: Geomechanics and Tunnelling 6/2014 Geomechanics and Tunnelling 6/2014 644-651 News

Kurzfassung

Contract for the Eisack crossing awarded / Baulos Eisackunterquerung vergeben
Preliminary works for the new Semmering Base Tunnel in Gloggnitz completed / Vorarbeiten für den Semmering-Basistunnel neu in Gloggnitz abgeschlossen
Machine baptism at the Bossler Tunnel / Maschinentaufe am Boßlertunnel
Construction of the harbour tunnel in Bremerhaven awarded / Bau des Hafentunnels in Bremerhaven beauftragt
Half time at the Steinbühl Tunnel on the new line / Halbzeit am Steinbühltunnel auf der Neubaustrecke
Jagdberg Tunnel open for traffic / Freie Fahrt am Jagdbergtunnel
Last sleeper laid in the Gotthard Base Tunnel / Letzte Schwelle im Gotthard-Basistunnel eingebaut
Training on “Conventional Tunnelling” organized by DGPC in collaboration with ITA-CET and ITA-AITES

x