abo_gift abo_online abo_print abo_student abo_test angle_left angle_right angle_right_filled arrow_big_down arrow_big_down_filled arrow_big_left arrow_big_left_filled arrow_big_right arrow_big_right_filled arrow_big_up arrow_big_up_filled arrow_dropdown_down arrow_dropdown_up arrow_small_left arrow_small_left_filled arrow_small_right arrow_small_right_filled arrow_stage_left arrow_stage_left_filled arrow_stage_right arrow_stage_right_filled caret_down caret_up close close_thin close_thin_filled contact download_thick download_thick_filled download_thin download_thin_filled ebook edit element_headline element_label element_relatedcontent lock mail minus page page_filled pages pages_filled phone plus print print_filled quotationmarks_left quotationmarks_right search send share share_filled shoppingcart_big shoppingcart_big_filled shoppingcart_header shoppingcart_small shoppingcart_small_filled social_facebook social_googleplus social_linkedin social_pinterest social_twitter social_xing social_youtube user_big user_small

Artikeldatenbank

Filter zurücksetzen
  • Autor(en)

  • Sprache der Veröffentlichung

  • Erschienen

  • Rubrik

Zeitschriften-Selektion

  • Alle auswählen Alle abwählen
Autor(en) Titel Zeitschrift Ausgabe Seite Rubrik
Berhane, Gebreselassie Standsicherheitsnachweis in der tiefen Gleitfuge unter Berücksichtigung von Strömungskräften geotechnik 3/2015 205-217 Fachthemen

Kurzfassung

Im Beitrag wird die Auswirkung einer Strömungskraft, die sich infolge einer Grundwasserabsenkung hinter einer durchlässigen Verbauwand ergibt, auf den Nachweis der tiefen Gleitfuge behandelt. Die genannte Belastungssituation lässt sich zurzeit mit gängigen EDV-Programmen im Zusammenhang mit dem Nachweis der tiefen Gleitfuge nicht abbilden. Die Fachliteratur behandelt dieses Thema nur lückenhaft. Des Öfteren liegen die Grundwasserabsenkkurven außerhalb des aktiven Gleitkeils der Verbauwände, jedoch innerhalb des für den Nachweis der tiefen Gleitfuge zu betrachtenden Gleitkörpers. In der Praxis wird in solchen Fällen die erforderliche Ankerlänge häufig unter Berücksichtigung des nicht abgesenkten Grundwasserspiegels ermittelt. Anhand von praktischen Beispielen (geschichteter Untergrund, mehrfach rückverankerter Verbau) wird gezeigt, dass die so ermittelten Ankerlängen nicht zwangsläufig auf der sicheren Seite liegen. Ein Nachweiskonzept zur Berücksichtigung der Strömungskräfte wurde im Technischen Büro Tiefbau der Zentralen Technik, Ed. Züblin AG, bodenmechanisch abgeleitet und findet aktuell Anwendung bei Ausführungsprojekten.

Overall stability of anchored walls using sliding block method with due consideration of flow forces.
The paper presents the effect of additional groundwater flow forces that arise as a result of lowering of ground water behind a permeable retaining wall on the overall stability based on the sliding block method. This load situation cannot be solved with current computer programs for the overall stability analysis. The literature also deals with this topic very scarcely. Depending on the permeability of the underground, the groundwater table after drawdown may lie outside the active sliding wedge of a retaining wall, but within the sliding block to be considered for the overall stability of an anchored wall. In such case, the required anchor length is usually calculated in practice assuming a full groundwater table before drawdown. On the basis of practical examples (multi-anchored walls in a multi-layered underground), the article shows that the anchor length determined in such a way may not necessarily lie on the safe side. A concept to account for the groundwater flow forces in the overall stability (sliding block method) has been developed for anchored walls in the geotechnical department of the Zentrale Technik, Ed. Züblin AG. The approach is currently used in practical projects and is presented in detail in the following.

x
Grabe, Jürgen; Stefanova, Bozhana Numerical modeling of saturated soils based on smoothed particle hydrodynamics (SPH) - Part 2: Coupled analysis geotechnik 3/2015 218-229 Fachthemen

Kurzfassung

In the first part of this paper the meshless numerical method smoothed particle hydrodynamics (SPH) was introduced, and its application for seepage analysis was presented. In this second part the method is extended to truly coupled analysis using a two-phase model for saturated soils. In contrast to the simulations in the first part of the paper the soil is also subjected to displacements. A hypoplastic constitutive model is applied to the soil, considering a liquefaction threshold for the case of very low effective stress or tension. The interaction between the two phases - water and soil - is presented for the case of laminar and turbulent flow. Various approaches for the evaluation of the interaction coefficients are introduced and evaluated. Test cases for verification and application of the SPH model are presented and discussed.

Numerische Modellierung gesättigter Böden mit der Smoothed Particle Hydrodynamics - Teil 2: gekoppelte Analyse.
Die netzfreie numerische Methode Smoothed Particle Hydrodynamics sowie ihre Anwendung zur Grundwasserströmungsanalyse wurden in dem ersten Teil dieses Artikels vorgestellt. Für den vorliegenden zweiten Teil wurde die Methode für die gekoppelte Analyse des gesättigten Boden mittels eines Zweiphasenmodells erweitert. Im Unterschied zum Teil 1 des Artikels ist der Boden auch verformbar. Zur Beschreibung des Spannungs-Dehnungsverhaltens des Bodens kommt ein hypoplastisches Stoffgesetz zur Anwendung, wobei ein Verflüssigungskriterium für den Boden eingeführt wird, welches bei sehr niedrigen effektiven Spannungen oder sogar bei Zugspannungen greift. Die Wechselwirkung zwischen den beiden Phasen - Wasser und Boden - ist definiert für den laminaren sowie für den turbulenten Fall. Verschiedene Ansätze zur Bestimmung der dazugehörigen Interaktionskoeffizienten werden dargestellt und bewertet. Es werden Beispiele zur Verifizierung und Anwendung des Modells präsentiert und diskutiert.

x
Schädlich, Bert; Kirsch, Fabian; Richter, Thomas Zur lateralen Bettungssteifigkeit von Pfählen mit großen Durchmessern bei kleinen Verformungen - Vergleich von Finite-Elemente-Berechnungen mit Methoden basierend auf p-y-Kurven geotechnik 3/2015 230-234 Berichte

Kurzfassung

Die wirtschaftliche und sichere Bemessung von Offshore-Gründungen mit gerammten Stahlrohrpfählen hängt in hohem Maße von einer realistischen Abbildung der horizontalen Bettung des Pfahls durch den umgebenden Boden ab. Üblicherweise erfolgt die geotechnische und stahlbauliche Bemessung von Monopile-Gründungsstrukturen mit gebetteten Stabwerksmodellen, in denen die Nichtlinearität des Bodenverhaltens durch entsprechende nichtlineare Bettungsfedern (sogenannte p-y-Kurven) berücksichtigt wird. Das Verhalten der p-y-Kurven bei kleinen Verformungen hat dabei einen großen Einfluss auf die dynamischen Eigenschaften der Gesamtstruktur. Im vorliegenden Beitrag werden verschiedene Ansätze für p-y-Kurven mit Berechnungen nach der Finite-Elemente-Methode verglichen, in denen ein höherwertiges Materialmodell mit erhöhter Bodensteifigkeit im Bereich sehr kleiner Dehnungen verwendet wurde. Es wird gezeigt, dass mit Modifikationen der p-y-Kurven im Bereich kleiner Verformungen eine gute Übereinstimmung zwischen Finite-Elemente-Berechnung und den Berechnungen am gebetteten Balken erzielt werden kann.

Lateral bedding stiffness of large diameter piles at small displacements - comparison of Finite Element calculations with methods based on p-y-curves.
The economical and safe design of offshore foundations with driven steel pipe piles depends to a large degree on the realistic modelling of the lateral bedding provided by the surrounding soil. Usually, the complex and strongly non-linear soil behaviour is taken into account in the design of offshore foundations by employing non-linear bedding springs (p-y-curves) in beam-spring models. The behaviour of the p-y-curves at small displacements strongly influences the dynamic properties of the structure, which are crucial for both the ultimate limit state (ULS) and the serviceability limit state (SLS). This paper compares different approaches for p-y-curves with numerical results obtained with the Finite Element method, using advanced constitutive models accounting for high soil stiffness at very small strains in the numerical calculations. It is shown, that good agreement between the Finite Element calculation and the beam-spring model can be obtained if the p-y-curves are modified at small displacements.

x
Dietzel, Fred; Lächler, Walter; Mergelsberg, Werner; Unterweger, Hans-Ulrich Langzeitkontrolle der Sicherungsmaßnahmen der Sonderabfalldeponie Malsch geotechnik 3/2015 235-243 Berichte

Kurzfassung

Nachdem in den 1980er-Jahren im Vorland der Sonderabfalldeponie Malsch in erheblichem Umfang Umweltschäden aufgetreten waren, wurde die Deponie in den Jahren 1992 bis 1995 gesichert. Dazu wurden ein Dränagesystem, eine vollständige Umschließung mittels Dichtwand und eine Oberflächenabdichtung hergestellt.
Von Beginn an war es das Ziel, die dauerhafte Wirksamkeit der Sicherungsmaßnahmen zu kontrollieren. In diesem Beitrag werden die einzelnen Sicherungsmaßnahmen und die zugehörigen Kontrollsysteme kurz erläutert. Detailliert wird auf die Ergebnisse der direkten und indirekten Kontrollen der Dichtwand mittels geophysikalischer Messungen eingegangen. Dabei werden sowohl die Messungen zur Überprüfung der Dichtwand selbst (Mise-à-la-masse) als auch die Messungen zum Nachweis von Veränderungen der Schadstoffbelastung im Vorland durch Widerstandsmessungen sowie durch Messung der Polarisation vorgestellt und in ihrer Aussagekraft bewertet. Daneben wird auch auf die Entwicklung der Sickerwassermengen über die Jahre eingegangen sowie das Setzungsverhalten der Deponie aufgezeigt. Abschließend werden die gewählten Verfahren zur langfristigen Kontrolle der Sicherheitssysteme bei dieser Deponie bewertet.

Long-term monitoring of the safeguards of the hazardous waste dump Malsch.
After significant environmental damage had occurred in the 1980s in the berm of the hazardous waste landfill Malsch, the dump underwent remediation between 1992 and 1995. For this purpose, a leachate collection drain system, a complete enclosure by means of a cut-off wall and a sealing cover were constructed.
From the outset the objective was to control the permanent effectiveness of protective measures. In this paper, the individual protective measures and associated control systems are briefly explained. The results of the direct and indirect controls of the sealing wall by means of geophysical measurements are discussed in detail. Both the measurements to verify the cut-off wall itself (mise-à-la-masse) and the measurements for the detection of changes in the pollution in the berm by means of resistance and polarization measurements are presented and their significance assessed. Furthermore, the development of the leachate volume over the years is addressed and the settlement behaviour of the landfill highlighted. The chosen method for the long-term control of the safety systems are finally evaluated at this landfill in the article.

x
DGGT-Mitteilungen: geotechnik 3/2015 geotechnik 3/2015 244-246 DGGT-Mitteilungen

Kurzfassung

Aktivitäten der DGGT zur Nachwuchsförderung
34. Baugrundtagung 2016 in Bielefeld
35. Baugrundtagung 2018 in Stuttgart
ISSMGE International Society for Soil Mechanics and Geotechnical Engineering
ISRM International Society for Rock Mechanics
IAEG International Association for Engineering Geology and the Environment (Dr. Kirsten Laackmann)
Aus der DGGT-Nachwuchsförderung (Dipl.-Ing. Markus Uhlig)

x
Persönliches: geotechnik 3/2015 geotechnik 3/2015 247-248 Persönliches

Kurzfassung

Nachruf zum Tode von Professor Zbigniew Sikora (von Gerd Gudehus, Georg Heerten)
Nachruf Dr.-Ing. Hans-Werner Vollstedt (von Robert Howe)

x
CBTR-Nachrichten: geotechnik 3/2015 geotechnik 3/2015 248-250 CBTR-Nachrichten

Kurzfassung

Internationale CBTR-Tagung in Wien voller Erfolg (Dr. Andreas Höckmayr)
Das aktuelle Urteil: Boden wasserdurchlässiger als erwartet: Mehrvergütung? / Fehler beim Mindestlohn: Geschäftsführer strafbar / Wann ist die Leistung des Subunternehmers abgenommen? (RA Dr. jur. Günther Schalk)

x
Firmen und Verbände: geotechnik 3/2015 geotechnik 3/2015 251 Firmen und Verbände

Kurzfassung

CDM Smith: Veränderungen in der Geschäftsführung

x
Termine: geotechnik 3/2015 geotechnik 3/2015 251-252 Termine

Kurzfassung

Keine Kurzfassung verfügbar.

x
geotechnik aktuell 3/2015 geotechnik 3/2015 251 geotechnik aktuell

Kurzfassung

Kernstudium des Bauingenieurwesens an Hochschulen für angewandte Wissenschaften (Prof. Dr.-Ing. Horst Werkle)

x
Inhalt: Mauerwerk 3/2015 Mauerwerk 3/2015 Inhalt

Kurzfassung

Keine Kurzfassung verfügbar.

x
Schoch, Torsten Spirit of the time and "grandson suitability" / Zeitgeist und "Enkeltauglichkeit" Mauerwerk 3/2015 173-174 Editorial

Kurzfassung

Keine Kurzfassung verfügbar.

x
Altaha, Nasser Veneer walls of masonry as specified in EC 6 (DIN EN 1996-2/NA) / Zweischaliges Mauerwerk nach EC 6 (DIN EN 1996-2/NA) Mauerwerk 3/2015 175-182 Fachthemen

Kurzfassung

This article deals with the production of veneer walls as specified in DIN EN 1996-2/NA [3]. Against this background of the extensive revision of the section for veneer walls an exposition in accordance with the previous requirements as specified in DIN 1053-1 can hardly be recommended. The necessity for a basic revision of the section for veneer wall construction has already been discussed in detail and justified in several technical articles published in previous years, see [4] to [7].
With many changes and corrections in the section for veneer walls in the National Annex of DIN EN 1996-2 [8] it is certainly not a question of new rules for this method of building, but an adjustment of the requirements in the previous standard on the basis of the practical experience gained over several years. The new requirements for the execution of cavity facing masonry enable a simple and economic implementation of this external wall construction.

x
Jäger, Wolfram; Bakeer, Tammam Arching effect in case of exterior walls with low surcharge under wind action / Ausbildung der Bogentragwirkung bei Außenwänden mit geringer Auflast unter Windbeanspruchung Mauerwerk 3/2015 183-186 Fachthemen

Kurzfassung

It is very important to have a minimum surcharge on external masonry walls to help the wall resisting wind actions. The present contribution describes the behaviour of masonry wall under wind action with low surcharge. The behaviour has been investigated using a finite element non-linear model that considers the large displacement non-linearity. An increasingly wind load has been applied and the deformation state and the thrust line within the wall have been investigated. The results of the analysis show that the behaviour of the wall under low surcharge was greatly characterized by the arching effect. Due to the low surcharge the influence of the second order effect was very small and can be neglected.

x
Sustainability meets architecture - DGNB award "Sustainable construction" / Nachhaltigkeit trifft Architektur - DGNB-Preis "Nachhaltiges Bauen" Mauerwerk 3/2015 186 Wettbewerbe

Kurzfassung

Keine Kurzfassung verfügbar.

x
Naumann, Kai Effect of Multipor interior insulation on flanking sound transmission / Einfluss einer Innendämmung aus Multipor auf die flankierende Schallübertragung Mauerwerk 3/2015 187-198 Fachthemen

Kurzfassung

In order to improve the energy efficiency of an existing building, it is necessary, among other things, to improve the thermal insulation provided by that building’s external walls. If the additional insulation required for this cannot be fitted on the outside, then it will need to be applied on the inside instead. To avoid the need for complex designs, insulating materials with a considerably reduced susceptibility to damage should be used, for example the mineral insulation panel Multipor.
Xella Technologie- und Forschungsgesellschaft mbH has conducted a study in cooperation with Xella Deutschland GmbH to determine whether, and if so, how, Multipor affects structure-borne sound transmission when used as interior insulation. The study, the results of which are presented in this article, involved testing flanking sound transmission in a laboratory at the Hochschule für Technik (HFT) in Stuttgart, Germany.

x
Schäfers, Martin; Grethe, Wiebke Designing sound insulation in multi-storey residential dwellings in accordance with E DIN 4109-2 / Schallschutzplanung im Geschosswohnungsbau nach E DIN 4109-2 Mauerwerk 3/2015 199-208 Fachthemen

Kurzfassung

The method for calculating airborne sound insulation between apartments as specified in DIN EN 12354-1:2000 has been used for many years - and is increasingly being used - in architectural design. This article will give a short overview of the basic principles of this calculation method, highlighting some special aspects, and will then focus on its application in practice. In particular, the experience gained with the KS Schallschutzrechner software (calculator for the prediction of sound insulation between dwellings and terraced houses ), which has now been in use for twelve years, demonstrates that - in spite of the improved prognostic accuracy - the method is not more labour-intensive than that of the previous procedure specified in DIN 4109 Supplement 1, provided suitable design aids are used.

x
Loderer, Franz Design of masonry buildings of three-layered units according to Eurocode 6 / Bemessung von Mauerwerksbauten aus Dreischichtsteinen nach Eurocode 6 Mauerwerk 3/2015 209-213 Fachthemen

Kurzfassung

In the recent past, the masonry industry has developed many different solutions for optimising the heat protection of buildings. This took place for the building materials, geometric design, but also by development of multiple layered stones in which the components masonry unit, insulation and outer shell have been integrated into a block.

x
GAO, Lianyu; ZHANG, Jingjie; XU, Chunyi National Standards of the People's Republic of China - Thoughts of revision on technical specification for application of autoclaved aerated concrete / Nationale Standards der Volksrepublik China - Gedanken zur Überarbeitung der technischen Spezifikationen für die Anwendung von dampfgehärtetem Porenbeton Mauerwerk 3/2015 214-227 Fachthemen

Kurzfassung

The revision task on technical specification for application of autoclaved aerated concrete products JGJ/T17 is under way, which was assigned in November 2013.The framework, thoughts and contents of revision on the specification are presented in this paper.

x
Eßig, Natalie Performance labels for assessing the sustainability of buildings - from offices to detached and semi-detached houses / Gütesiegel für die Nachhaltigkeitsbewertung von Gebäuden - Vom Bürobau bis zu Ein- bis Zweifamilienwohnhäusern Mauerwerk 3/2015 228-238 Fachthemen

Kurzfassung

For some time now, certain types of buildings in Germany have been required to undergo a sustainability assessment. Increasingly, that now also includes residential buildings. A research project is currently underway to develop and test suitable criteria for the assessment of small residential buildings, the preliminary results of which were showcased at the BAU 2015 trade fair in Munich. With the help of examples, this article presents the criteria and provides some information on their application.

x
Improved user-friendliness on the website / Verbesserte Nutzerfreundlichkeit auf der Website Mauerwerk 3/2015 238 Firmen und Verbände

Kurzfassung

Keine Kurzfassung verfügbar.

x
Current masonry topics at the third Poroton masonry convention / Aktuelle Mauerwerksthemen beim 3. Poroton-Mauerwerkskongress Mauerwerk 3/2015 239-240 Veranstaltungen

Kurzfassung

Keine Kurzfassung verfügbar.

x
Firmen und Verbände: Mauerwerk 3/2015 Mauerwerk 3/2015 240-242 Firmen und Verbände

Kurzfassung

Placing of EPDs from IBU now also possible on the Spanish market / Platzierung von EPDs vom IBU nun auch auf dem spanischen Markt möglich
New members of the Association of Brick Manufacturers / Zuwachs für die Vereinigung der Backsteinhersteller

x
The IMS Student Project Awards 2015 / Awards der IMS für Studienprojekte 2015 Mauerwerk 3/2015 242 Wettbewerbe

Kurzfassung

Keine Kurzfassung verfügbar.

x
Inhalt: Stahlbau 3/2015 Stahlbau 3/2015 Inhalt

Kurzfassung

Keine Kurzfassung verfügbar.

x