abo_gift abo_online abo_print abo_student abo_test angle_left angle_right angle_right_filled arrow_big_down arrow_big_down_filled arrow_big_left arrow_big_left_filled arrow_big_right arrow_big_right_filled arrow_big_up arrow_big_up_filled arrow_dropdown_down arrow_dropdown_up arrow_small_left arrow_small_left_filled arrow_small_right arrow_small_right_filled arrow_stage_left arrow_stage_left_filled arrow_stage_right arrow_stage_right_filled caret_down caret_up close close_thin close_thin_filled contact download_thick download_thick_filled download_thin download_thin_filled ebook edit element_headline element_label element_relatedcontent lock mail minus page page_filled pages pages_filled phone plus print print_filled quotationmarks_left quotationmarks_right search send share share_filled shoppingcart_big shoppingcart_big_filled shoppingcart_header shoppingcart_small shoppingcart_small_filled social_facebook social_googleplus social_linkedin social_pinterest social_twitter social_xing social_youtube user_big user_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select all De-select all
Author(s) Title Journal Issue Page Category
Content: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 Content

Abstract

No short description available.

x
News: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 172-179 News

Abstract

Tunnel boring machine at the Filder Tunnel ready for second drive / Tunnelvortriebsmaschine am Fildertunnel für zweite Schildfahrt bereit
Refurbishment of the Bruck chain of tunnels completed / Sanierung Tunnelkette Bruck abgeschlossen
Provisional result of tendering for the contract Mauls 2-3 / Vorläufiges Ergebnis der Ausschreibung Baulos Mauls 2-3
Implenia wins infrastructure project in Norway / Implenia gewinnt Infrastrukturgroßprojekt in Norwegen
Fröschnitzgraben access shafts for the Semmering Base Tunnel in operation / Zugangsschächte Fröschnitzgraben für den Semmering-Basistunnel in Betrieb
Strabag receives road and tunnel contract in Norway / Strabag erhält Straßen- und Tunnelbauauftrag in Norwegen
All three construction sections awarded at the Semmering Base Tunnel / Alle drei Baulose am Semmering-Basistunnel vergeben
Refurbishment of the Wald and Pretallerkogel Tunnels / Sanierung von Wald- und Pretallerkogeltunnel
Further underground railway contract in Cairo / Weiterer Auftrag für die U-Bahn in Kairo
TBM quartet for Norway / TBM-Quartett für Norwegen
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
Product Information: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 276-282 Product Information

Abstract

The Klaus tunnel chain: DSI ground support products stabilize excavation of the new Eastern tubes / Die Tunnelkette Klaus: Stützmittel der DSI sichern Vortrieb der neuen Oströhren
Project-planning software for the Brenner Base Tunnel / Projektplanungssoftware für den Brenner Basistunnel

x
Diary of Events: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 285-286 Diary of Events

Abstract

No short description available.

x
Inhalt: Mauerwerk 3/2016 Mauerwerk 3/2016 Inhalt

Abstract

No short description available.

x
Simple and efficient: Brochure for dimensioning and constructing brick masonry / Einfach und effizient: Brosch√ľre zur Bemessung und Konstruktion von Ziegelmauerwerk Mauerwerk 3/2016 212 Firmen und Verb√§nde

Abstract

No short description available.

x
The Order of Merit of the Federal Republic of Germany for Thomas L√ľtzkendorf / Bundesverdienstkreuz f√ľr Thomas L√ľtzkendorf Mauerwerk 3/2016 252-253 Pers√∂nliches

Abstract

No short description available.

x
Successful winter seminars on plastered façades without damages / Erfolgreiche Winterseminare zu schadenfreien Putzfassaden Mauerwerk 3/2016 253-254 Veranstaltungen

Abstract

No short description available.

x
Hamburg Wilhelmsburg honoured with the German Building-Owner Award 2016 / Hamburg Wilhelmsburg mit dem Deutschen Bauherrenpreis 2016 ausgezeichnet Mauerwerk 3/2016 254 Wettbewerbe

Abstract

No short description available.

x
Firmen und Verbände: Mauerwerk 3/2016 Mauerwerk 3/2016 255-256 Firmen und Verbände

Abstract

Digital planning aid for thermal and acoustic protection / Digitaler Planungshelfer zum Wärme- und Schallschutz
New strategic orientation of the Federal Association Aerated Concrete / Neue strategische Ausrichtung des Bundesverbandes Porenbeton

x
Termine: Mauerwerk 3/2016 Mauerwerk 3/2016 256 Termine

Abstract

16th IB2MAC. 16th International Brick and Block Masonry Conference “Masonry in a world of challenges”

x
Inhalt: Stahlbau 3/2016 Stahlbau 3/2016 Inhalt

Abstract

No short description available.

x
FIDIC-Seminare 2016 Stahlbau 3/2016 180 Aktuell

Abstract

No short description available.

x
The 9th International Conference on BRIDGES IN DANUBE BASIN Stahlbau 3/2016 194 Aktuell

Abstract

No short description available.

x
Die Eisenbibliothek - ein Kurzportrait Stahlbau 3/2016 228 Aktuell

Abstract

No short description available.

x
Persönliches: Stahlbau 3/2016 Stahlbau 3/2016 236 Persönliches

Abstract

Tobias Melz neuer Leiter des Fraunhofer LBF
Zum Tode von Artur Fischer

x
Ausstellung √ľber Ove Arup in London Stahlbau 3/2016 237-238 Aktuell

Abstract

No short description available.

x
Firmen und Verbände: Stahlbau 3/2016 Stahlbau 3/2016 238-239 Firmen und Verbände

Abstract

Special Feuerverzinkte Fassadenunterkonstruktionen
Arbeitshilfe zur Planung feuerverzinkter Brücken - Die wichtigsten Inhalte im Überblick

x
Termine: Stahlbau 3/2016 Stahlbau 3/2016 239-240 Termine

Abstract

No short description available.

x
Inhalt: UnternehmerBrief Bauwirtschaft 3/2016 UnternehmerBrief Bauwirtschaft 3/2016 Inhalt

Abstract

No short description available.

x
Gesamtausgabe UBB 3/2016 UnternehmerBrief Bauwirtschaft 3/2016 1-24 Gesamtausgabe

Abstract

Komplette Monatsausgabe

x
Kurz informiert: UnternehmerBrief Bauwirtschaft 3/2016 UnternehmerBrief Bauwirtschaft 3/2016 2 Kurz informiert

Abstract

Gutachten des Bundesrechnungshofs stärkt BVMB den Rücken
“Serielles Bauen” soll Nachhaltigkeit im Wohnungsbau sichern
Gute Stimmung in der Planungsbranche

x
UBB-Steuertrends UnternehmerBrief Bauwirtschaft 3/2016 16 Berichte

Abstract

No short description available.

x
Bauleistung: Vertrauensschutz? UnternehmerBrief Bauwirtschaft 3/2016 16 Berichte

Abstract

Im Chaos zur Steuerschuldnerschaft bei Bauleistungen können Baufirmen einen entscheidenden Etappensieg feiern. Der Bundesfinanzhof hat entschieden, dass ernstliche Zweifel an der Rechtmäßigkeit des § 27 Abs. 19 UStG bestehen. Wir erklären Ihnen, was das bedeutet.

x
Neue Gestaltungs√ľberlegungen UnternehmerBrief Bauwirtschaft 3/2016 17 Berichte

Abstract

Trägt eine Kapitalgesellschaft Kosten für die Tochtergesellschaft, stellt sich die Frage, ob die Muttergesellschaft diese Kosten als sofort abziehbare Betriebsausgaben behandeln darf oder ob sie diese Kostenübernahme als verdeckte Einlage behandeln und die Kosten deshalb auf die Beteiligung aktivieren muss. In der Praxis haben Mutter- und Tochtergesellschaft hier interessante Gestaltungsmöglichkeiten.

x