Journal articles
Author(s) | Title | Journal | Issue | Page | Category |
---|---|---|---|---|---|
CBTR-Nachrichten: geotechnik 3/2019 | geotechnik | 3/2019 | 175-177 | CBTR-Nachrichten | |
AbstractCBTR-Tagung 2019 in Regensburg x | |||||
Das aktuelle Urteil: geotechnik 3/2019 | geotechnik | 3/2019 | 177-180 | CBTR-Nachrichten | |
AbstractDie HOAI ist tot - es lebe die HOAI? x | |||||
Tagungsberichte: geotechnik 3/2019 | geotechnik | 3/2019 | 180-181 | Tagungsberichte | |
Abstract12. Freiberger Geotechnik Kolloquium x | |||||
Hettler, A., Kurrer, K.-E.: Erddruck. | geotechnik | 3/2019 | 181 | Bücher | |
VDI 4640 Blatt 2 "Thermische Nutzung des Untergrunds - Erdgekoppelte Wärmepumpenanlagen". | geotechnik | 3/2019 | 181-182 | Neuerscheinungen | |
Symposium Ingenieurbaukunst - Design for Construction am 22. November in Stuttgart | geotechnik | 3/2019 | 182 | Firmen und Verbände | |
Termine: geotechnik 3/2019 | geotechnik | 3/2019 | 182 | Termine | |
AbstractGEO2019 Geotechnik Kolloquium 2019 / Colloquium on Geotechnical Engineering 2019 x | |||||
Titelbild: Mauerwerk 3/2019 | Mauerwerk | 3/2019 | Titelbild | ||
AbstractSlate facade in the DomRömer-Quartier, Frankfurt. In the completely new old town centre, the DomRömer-Quartier, 15 of 35 houses were built according to historic guidelines as “creative new buildings”. A further 20 “modern” buildings have been built on the basis of the historic town plan and according to the guidelines of the DomRömer design rules. The pattern of the slates to the gable front in the attic storey is worth mentioning. Instead of the usual laying to the right, the architect decided on a facade, in which the slating pattern runs to the left and right of the central window with left- and right-handed slating and thus forms a symmetrical gable. (photo: Rathscheck Schiefer) x | |||||
Inhalt: Mauerwerk 3/2019 | Mauerwerk | 3/2019 | Inhalt | ||
BIM laboratory at the FH Münster / BIM-Labor an der FH Münster | Mauerwerk | 3/2019 | 199 | Aktuelles | |
Firmen und Verbände: Mauerwerk 3/2019 | Mauerwerk | 3/2019 | 200-201 | Firmen und Verbände | |
AbstractSelf-laying calcium silicate blocks / Selbstmauernde Kalksandsteine x | |||||
Anett Fischer: Bricks | Ziegel: Architecture - Material - Production / Bricks | Ziegel: Architektur - Baustoff - Herstellung | Mauerwerk | 3/2019 | 201-202 | Rezensionen | |
Fire Protection 2019 / Brandschutz im Brennpunkt 2019 | Mauerwerk | 3/2019 | 202 | Veranstaltungen | |
Titelbild: Stahlbau 3/2019 | Stahlbau | 3/2019 | Titelbild | ||
Abstract
x | |||||
Inhalt: Stahlbau 3/2019 | Stahlbau | 3/2019 | Inhalt | ||
Stahlbau aktuell 3/2019 | Stahlbau | 3/2019 | 300-311 | Stahlbau aktuell | |
Abstract
x | |||||
Kongresse - Symposien - Seminare - Messen | Stahlbau | 3/2019 | 311-312 | Veranstaltungskalender | |
Content: Steel Construction 3/2019 | Steel Construction | 3/2019 | Contents | ||
Cover Picture: Steel Construction 3/2019 | Steel Construction | 3/2019 | 1 | Cover Pictures | |
AbstractThe new intercity line Toluca - Mexico City has a length of 57.7 km. The daily passenger estimate is about 230,000 to 300,000. The investment volume amounts to 2.5 bn US$. Its special feature is the MAURER seismic protection system for two long viaducts. The company installs for this purpose so-called guided cross-ties, the first absolutely earthquake-proof railroad bridge expansion joints. Together with a complex system consisting of bearings, dampers and elastomeric spring isolators they ensure structural stability, function and safety for various load cases: from braking and acceleration forces in normal operation to the Maximum Considered Earthquake (MCE). MAURER startet to work for this project in 2016. The last step scheduled is the installation of the guided cross-ties at viaduct 4 in the third quarter of 2020. (© MAURER SE) x | |||||
High hopes - why BIM does not pay off (yet) | Steel Construction | 3/2019 | 208 | Editor's Recommendations | |
Fire design of slim-floor beams | Steel Construction | 3/2019 | 230 | Editor's Recommendations | |
Steel Construction News 3/2019 | Steel Construction | 3/2019 | 249-260 | Steel Construction News | |
AbstractECCS News: ECCS R&D activities x | |||||
Events: Steel Construction 3/2019 | Steel Construction | 3/2019 | 261 | Events | |
Inhalt: UnternehmerBrief Bauwirtschaft 3/2019 | UnternehmerBrief Bauwirtschaft | 3/2019 | Inhalt | ||
Titelbild: Bauphysik 2/2019 | Bauphysik | 2/2019 | Titelbild | ||
AbstractIn Hilden wurde auf dem Gelände der Waldkaserne der Bundeswehr ein neuer Musik-Campus aus einem Ausbildungsgebäude mit Orchestersälen, Proberäumen und einem Unterkunftsgebäude errichtet, siehe Meldung S. 139. Bis zu 140 angehende Orchestermusiker werden hier ausgebildet. Der Campus wurde durch hks I architekten, Aachen errichtet. Die Beratung und Planung der Raumakustik, des Schallschutzes und der Bauphysik wurde von GRANER + PARTNER Ingenieure, Bergisch Gladbach durchgeführt. (© Foto: Jörg Hempel) x |