abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Ausstellung BrückenschlagBeton- und Stahlbetonbau4/2002A15Ausstellungen und Messen

Abstract

No short description available.

x
Ausstellung Faszination Bauprozess - Von der Idee zur gebauten RealitätBauphysik5/2016331Aktuell

Abstract

No short description available.

x
Ausstellung Flußbau in der SchweizBeton- und Stahlbetonbau5/2004421Aktuelles

Abstract

No short description available.

x
Ausstellung Gottfried Semper - Architektur und WissenschaftBeton- und Stahlbetonbau11/2003A27Tagungen

Abstract

No short description available.

x
Ausstellung StraßenbrückenBautechnik10/2004851Nachrichten

Abstract

No short description available.

x
Schmidt, HartwigAusstellung über Bollinger Grohmann im Deutschen Architekturmuseum Frankfurt/MStahlbau8/2013625-627Berichte

Abstract

No short description available.

x
Ausstellung über Ove Arup in LondonStahlbau3/2016237-238Aktuell

Abstract

No short description available.

x
Ausstellung ZeitSchichten. Erkennen und ErhaltenBautechnik5/2005334Nachrichten

Abstract

No short description available.

x
Ausstellung zum Internationalen Hochbau-Preis 2004Bautechnik6/2004501Nachrichten

Abstract

No short description available.

x
Kleefisch-Jobst, UrsulaAusstellung: "Tragende Linien - Tragende Flächen" Konstruktionsprinzipien im Werk von Stefan PolónyiStahlbau5/2012429-431Berichte

Abstract

No short description available.

x
Ausstellungen und Messen Bau '99Beton- und Stahlbetonbau1/199954Ausstellungen und Messen

Abstract

No short description available.

x
Führer, W.; Knaack, U.Ausstellungspavillon aus Glas.Stahlbau2/199789Berichte

Abstract

No short description available.

x
Schalk, GüntherAustausch beim NeujahrsempfangUnternehmerBrief Bauwirtschaft3/201511Berichte

Abstract

No short description available.

x
Ewert, S.Austausch des Versteifungsträgers einer Hängebrücke unter fließendem VerkehrStahlbau3/2002223-224Berichte

Abstract

No short description available.

x
Austausch: Bürgschaft anstelle von EinbehaltBautechnik6/1998419Recht

Abstract

No short description available.

x
Ohlemutz, A.Australiens höchste Gebäude.Stahlbau8/1978250-252Berichte

Abstract

No short description available.

x
Galler, R.Austrian Southern Railway Link Conference 2009 / Südbahntagung 2009Geomechanics and Tunnelling2/201090Editorial

Abstract

No short description available.

x
Galler, Robert; Moritz, BerndAustrian Southern-Railway-Link-ConferenceSüdbahntagungGeomechanics and Tunnelling6/2017636Editorials

Abstract

No short description available.

x
Marcher, Thomas; Galler, RobertAustrian Tunnel Competence Center - ATC2Geomechanics and Tunnelling6/2019616Editorials

Abstract

No short description available.

x
Austrian Tunnel DayGeomechanics and Tunnelling6/2021Cover Pictures

Abstract

The Borth underground salt mine with an annual production volume in the range of 2 m t of halite is amongst the largest underground mines in Central Europe. All mined halite is transported to the central hoisting shaft with belt conveyor systems. To ensure a safe and efficient operation of the main conveyor belt, precautionary support measures in geotechnically stressed areas of various stopes were necessary. For the rehabilitation measures, an innovative anchoring system was applied using 3.7 to 5.7 m long hollow bar anchors which were first anchored mechanically in a borehole, pre-stressed and then fully grouted with resin.
Das Bergwerk Borth mit einer Jahresfördermenge von rund 2 Mio. t Steinsalz ist eines der größten untertägigen Steinsalzbergwerke in Mitteleuropa. Das abgebaute Steinsalz wird über Bandanlagen zum Förderschacht transportiert. Um den sicheren Betrieb der Hauptbandanlage zu gewährleisten, mussten gebirgsmechanisch stark beanspruchte Bereiche einiger Kammern saniert werden. Für die Sanierungsmaßnahmen kam ein innovatives Ankersystem zum Einsatz, bei dem 3,7 bis 5,7 m lange Hohlstabanker zunächst kraftschlüssig in einem Bohrloch verankert, vorgespannt und anschließend vollständig mit Kunstharz vermörtelt wurden.

x
Austrian Tunnel DayGeomechanics and Tunnelling6/2018Cover Pictures

Abstract

In the Frasers underground gold mine in New Zealand several previously mined areas had to be sealed off and secured against water ingress. To ensure that the bulkhead structures are effective, the surrounding highly fractured rock masse had to be reinforced. In cooperation with Mastermyne, DSI Underground Australia suggested pumping Mineral Bond urea silicate resin into the rock mass around the drive to consolidate the ground and eliminate the water passage around the bulkhead seal sites. Mineral Bond was chosen as it is a nonexpanding resin which is unaffected by water, remains flexible and develops a strength of 40 MPa (see page 738).
Im neuseeländischen Goldbergwerk Frasers mussten alte Abbaubereiche abgedämmt und gegen Wassereinbruch gesichert werden. Damit die Schottbauwerke wirken, musste das umgebende gebräche Gebirge ertüchtigt werden. In Zusammenarbeit mit Mastermyne schlug DSI Underground Australien zur Konsolidierung und Abdichtung des Untergrunds vor, das Harnstoff-Silikatharz Mineral Bond in das Gebirge um den Stollen herum zu injizieren. Das Produkt Mineral Bond wurde ausgewählt, weil es sich um ein flexibles und nicht expandierendes Kunstharz handelt, auf das Wasser keine Auswirkungen hat und das eine Festigkeit von 40 MPa entwickelt (siehe Seite 738).

x
Galler, RobertAustrian Tunnel Day / Österreichischer TunneltagGeomechanics and Tunnelling6/2021678Editorials

Abstract

No short description available.

x
Galler, R.Austrian Tunnel Day / Österreichischer TunneltagGeomechanics and Tunnelling6/2010690-691Editorial

Abstract

No short description available.

x
Austrian Tunnel Day 2022Geomechanics and Tunnelling6/2022Cover Pictures

Abstract

The approx. 1760 m long twin tube Tunnel Ivan is part of the A1 motorway in Bosnia and Herzegovina, which will connect the north of the country with the Adriatic coast. After a construction start in October 2019, the tunnel could be opened to traffic in September 2022. To secure and support the tunnel, DSI supplied Hollow Bars and the AT - Casing System  114 mm. (photo: DSI Underground)
Der zweiröhrige, rund 1760 m lange Tunnel Ivan ist Teil der Autobahn A1 in Bosnien und Herzegowina, die den Norden des Landes mit der Adriaküste verbinden wird. Nach einem Baustart im Oktober 2019 konnte der Tunnel im September 2022 für den Verkehr freigegeben werden. Zur Sicherung des Tunnelvortriebs lieferte DSI Hohlstabanker und das AT - Hüllrohrsystem  114 mm. (Foto: DSI Underground)

x
Galler, RobertAustrian Tunnel Day 2022 / Österreichischer Tunneltag 2022Geomechanics and Tunnelling6/2022683-684Editorials

Abstract

No short description available.

x