abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Bauträgerrecht - Aussagen in der Werbung müssen zum Produkt passenUnternehmerBrief Bauwirtschaft3/20072

Abstract

No short description available.

x
Bauträgerrecht - Keine Haftung für BG-Beiträge ausführender BetriebeUnternehmerBrief Bauwirtschaft5/20073

Abstract

No short description available.

x
Bauunternehmen mit mehreren Baustellen - So zerlegen Sie den Gewerbesteuermessbetrag richtigUnternehmerBrief Bauwirtschaft5/20063

Abstract

No short description available.

x
Rösch, P.Bauunternehmenssteuerung, Teil 1UnternehmerBrief Bauwirtschaft4/200917-20Berichte

Abstract

No Abstract.

x
Rösch, P.Bauunternehmenssteuerung, Teil 2UnternehmerBrief Bauwirtschaft5/200913-16Berichte

Abstract

No Abstract.

x
Rösch, P.Bauunternehmenssteuerung, Teil 3UnternehmerBrief Bauwirtschaft6/200913-17Berichte

Abstract

No Abstract.

x
Schalk, GüntherBauunternehmer - "ausgeprägt leidensfäig" ?UnternehmerBrief Bauwirtschaft3/20111Editorial

Abstract

No Abstract.

x
Schwinn, MichaelBauunternehmer: Ãœber alternative Strategien nachdenken!UnternehmerBrief Bauwirtschaft9/201815-16Berichte

Abstract

Hört und liest man derzeit Berichte über die Bauwirtschaft in Deutschland, entsteht der Eindruck, die Situation deutscher Bauunternehmer könne wünschenswerter nicht sein. Zwingen die aktuellen Entwicklungen in der Bauwirtschaft Bauunternehmen dennoch zu einem Strategiewechsel? Die Ergebnisse von Gesprächen mit Führungskräften in Unternehmen sind alarmierend!

x
Greiner-Mai, D.Bauvermessungs-Praxis digital - CD 1: Grundlagen der Bauvermessung - leicht und verständlich (Richter, R.)Bautechnik7/2006521Bücher

Abstract

No short description available.

x
Bauverträge erfolgreich gestalten und managenBautechnik9/1999838Termine

Abstract

No short description available.

x
Bauverträge erfolgreich gestalten und managenBautechnik4/1999348Termine

Abstract

No short description available.

x
Bauverträge erfolgreich gestalten und managenBautechnik2/1999188-189Termine

Abstract

No short description available.

x
Bauverträge rechtssicher gestaltenBautechnik2/1999188Termine

Abstract

No short description available.

x
Bauverträge: Vertragstypen - Sicherungsmittel - BauprozeßBautechnik1/200087Termine

Abstract

No short description available.

x
Meißner, Simon; Michael, Joachim; Kies, Maximilian; Cronen, BerndBauvorhaben FOUR: Deckelbauweise mit einer Kombinierten Schlitzwand-Pfahl-Plattengründunggeotechnik3/2020193-200Berichte

Abstract

Im Zentrum von Frankfurt am Main wird aktuell an der Wiederbelebung des Deutsche-Bank-Areals gearbeitet. Auf dem Areal werden vier Hochhäuser realisiert. Diese vier Hochhäuser stehen auf einer gemeinsamen Bodenplatte. Die Baugrube weist eine Fläche von ca. 15.000 m2 und eine Tiefe von 20 m auf und wird umringt von bestehenden Hochhäusern. Zur Herstellung der vier Untergeschosse wurde eine Deckelbauweise geplant, diese ist jetzt in Ausführung. Zur Optimierung der geplanten Kombinierten Pfahl-Plattengründung (KPP) wird zusätzlich die Schlitzwand zum Lastabtrag herangezogen. Insgesamt wurden 370 Gründungspfähle hergestellt. Die Verbauwand wurde in der Innenstadt von Frankfurt zum ersten Mal im Schlitzwandverfahren ausgeführt. Für die komplexe Bemessung der Verbauwand in Verbindung mit der großmaßstäblichen Deckelbauweise und der KPP-Gründung wurden detaillierte Nachweisstrategien erfolgreich entwickelt.

Project FOUR: Top-Down-Method with a combined diaphragm wall-pile-raft-foundation
At present the revitalization project FOUR of the former Deutsche Bank area in the center of the city of Frankfurt is under construction. The project contains of four high-rise buildings. These four high-rise buildings are sharing a reinforced concrete slab at ground level and four basement levels. The deep excavation has an area of approx. 15, 000 m2 and a depth of 20 m and is surrounded by other skyscrapers. A total number of 370 bored piles were required. For the basement excavations the top-down method was considered as an appropriate method in the conceptual design stage. It is the first time that a diaphragm wall is being constructed in the city center. Hence, it was essential for the realization of the project with the large-scale top-down method and construction embedded permanent diaphragm wall, that appropriate verification strategies were successfully developed.

x
Bauvorhaben rechtssicher begleitenBeton- und Stahlbetonbau2/2002A19Tagungen

Abstract

No short description available.

x
Bauvorhaben Wiener Platz in DresdenBeton- und Stahlbetonbau9/2002444Information

Abstract

No short description available.

x
Bauvorschriften und Normen onlineBautechnik10/2003750Firmen und Verbände

Abstract

No short description available.

x
Bauvorschriften und Normen onlineBeton- und Stahlbetonbau11/2003A28Information

Abstract

No short description available.

x
Kuhlemann, C.; Riechers, H.Bauweise mit Zukunft: Durch und durch mineralisch  - Wärmedämmendes Mauerwerk mit mineralischem PutzMauerwerk4/2010212-220Berichte

Abstract

Hat Mauerwerk eine Zukunft? Oder dienen Wände bald nur noch als Trägermaterial für Dämmschichten? Dabei ist gerade wärmedämmendes Mauerwerk aus gutem Grund im Wohnungsbau nach wie vor die Nummer Eins  -  und wird es nach Einschätzung der Fachleute auch bleiben. Dieser Beitrag schildert aktuelle Entwicklungen und beleuchtet Hintergründe.

Construction with a future  -  theral insulating brick with mineral plaster.
Does brickwork has a future? Couldn’t it be that walls will soon only serve as backing material for insulation layer? However, there are good reasons that heat insulating brickwork is still the number one in domestic constructions  -  according to experts this will remain so. The following article will characterize current developments und backgrounds.

x
Moritz, K.Bauweisen der ETFE-FoliensystemeStahlbau5/2007336-342Berichte

Abstract

No short description available.

x
Pittino, GerhardBauwerk-Boden-Interaktion bei lagenweise hinterfüllten StahlwellblechdurchlässenStahlbau1/201115-20Fachthemen

Abstract

Vorgeformte Stahlwellblechplatten werden vor Ort zu Rohren, Bögen oder Stahlwellblechdurchlässen zusammengebaut. Für die Tragfähigkeit der flexiblen, erdverlegten Stahlrohre ist die seitliche Bettung durch die Hinterfüllung mit Bodenmaterial ausschlaggebend. Während dem Hinterfüllen entwickelt sich der Erddruck, der zuerst alleine durch den kleinen Biegewiderstand des Rohres getragen werden muss. Die Biegemomentverteilung bleibt nach dem Verfüllen bis zum Rohrscheitel nahezu “eingefroren”. Der vorliegende Beitrag behandelt die Bauwerk-Boden-Interaktion anhand von numerischen Berechnungen mit dem Ziel, den Hinterfüllvorgang so zu gestalten, dass die Biegemomente klein bleiben.

Soil-structure interaction of structural plate steel underpasses backfilled in layers.
Curved corrugated steel plates are field assembled into pipes, arches, underpasses and other shapes. The lateral bedding that is responsible for the load bearing capacity of the flexible, earth embedded steel pipe is provided only by way of backfilling with soil material. The earth pressure that develops by backfilling must be solely born at first by the small bending resistance of the pipe. The bending moments remain nearly “frozen” after backfilling up to the top. This paper deals with the soil-structure interaction. This is shown by means of numerical calculations with FLAC as to how the steel conduit should be backfilled so that the bending moments remain small.

x
Idelberger, K.Bauwerke der Olympischen Sommerspiele 2000 in AustralienStahlbau11/2000917-922Berichte

Abstract

No short description available.

x
Grosse, J.; Hopfgartner, P.; Tölzel, A.Bauwerke im Kühlwasser-Rücklaufbereich des Kernkraftwerkes Unterweser.Beton- und Stahlbetonbau8/1976185-193

Abstract

Für die Errichtung der Kühlwasserkette musste unter anderem eine 650 m lange Rückgabeleitung aus Stahlbetonrohren mit NW 4000 6.50 m unter der Flussohle der Weser verlegt werden. Das Herstellen der Stahlbetonrohre, das Einschwimmen und sichere Ablassen und die Verbindung der bis zu 50 m langen Rohrschüsse werden erläutert.

x
Bauwerke im Wandel - Umnutzung, Anpassung, ÖkologieBautechnik8/1999711Termine

Abstract

No short description available.

x