abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
News: Geomechanics and Tunnelling 5/2016Geomechanics and Tunnelling5/2016370-378News

Abstract

First tunnel breakthrough at the Granitztal tunnel chain / Erster Tunneldurchschlag bei der Tunnelkette Granitztal
Works acceptance for Europe's largest EPB machine / Werksabnahme für Europas größte EBP-Maschine
Porr win their first tunnel contract in Norway / Porr erhält ersten Tunnelauftrag in Norwegen
Brenner Base Tunnel site in Wolf to gain a rail siding / BB-Baustelle in Wolf erhält Gleisanschluss
End of the Fehmarnbelt Tunnel participation period in Germany / Ende der Einwendungsfrist zum Fehmarnbelt-Tunnel in Deutschland
Powerhouse of the Gemeinschaftskraftwerk Inn enters the next phase / Krafthaus des Gemeinschaftskraftwerks Inn geht in die nächste Phase
DB passes 50 km mark at Stuttgart 21 / Bahn überschreitet 50-km-Marke bei Stuttgart 21
TBMs for Metro in Ecuador / TVMs für Metro in Ecuador
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 4/2016Geomechanics and Tunnelling4/2016292-299News

Abstract

• Implenia to extend Metro Line 11 for the Grand Paris Express project / Implenia verlängert U-Bahn-Linie 11 für das Projekt Grand Paris Express
• Tunnelling machine for the Eppenberg Tunnel accepted / Vortriebsmaschine für den Tunnel Eppenberg abgenommen
• Ground breaking for the Brenner contract Eisack / Spatenstich für das Brenner-Baulos Eisack
• Züblin wins award worth 400 million in Chile / Züblin erhält in Chile Auftrag in Höhe von 400 Millionen
• Planning decision for the first section at Stuttgart Airport / Planfeststellungsbeschluss für ersten Abschnitt am Stuttgarter Flughafen
• Successful tunnel breakthrough at Obervermuntwerk II / Erfolgreicher Stollendurchschlag beim Obervermuntwerk II
• Femern A/S signs main contracts with a value of EUR 4 billion / Femern A/S unterzeichnet Hauptbauverträge im Wert von 4 Mrd. Euro
• Robbins and NHI agree to a three-phase merger plan / Robbins und NHI vereinbaren Dreistufenplan zur Fusion
• Terratec supllies TBMs for Turkey, Thailand and India
• Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 3/2016Geomechanics and Tunnelling3/2016172-179News

Abstract

Tunnel boring machine at the Filder Tunnel ready for second drive / Tunnelvortriebsmaschine am Fildertunnel für zweite Schildfahrt bereit
Refurbishment of the Bruck chain of tunnels completed / Sanierung Tunnelkette Bruck abgeschlossen
Provisional result of tendering for the contract Mauls 2-3 / Vorläufiges Ergebnis der Ausschreibung Baulos Mauls 2-3
Implenia wins infrastructure project in Norway / Implenia gewinnt Infrastrukturgroßprojekt in Norwegen
Fröschnitzgraben access shafts for the Semmering Base Tunnel in operation / Zugangsschächte Fröschnitzgraben für den Semmering-Basistunnel in Betrieb
Strabag receives road and tunnel contract in Norway / Strabag erhält Straßen- und Tunnelbauauftrag in Norwegen
All three construction sections awarded at the Semmering Base Tunnel / Alle drei Baulose am Semmering-Basistunnel vergeben
Refurbishment of the Wald and Pretallerkogel Tunnels / Sanierung von Wald- und Pretallerkogeltunnel
Further underground railway contract in Cairo / Weiterer Auftrag für die U-Bahn in Kairo
TBM quartet for Norway / TBM-Quartett für Norwegen
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 2/2016Geomechanics and Tunnelling2/201668-78News

Abstract

First breakthrough at the Albabstieg Tunnel / Erster Durchschlag am Albabstiegstunnel
Last tunnel breakthrough in the Klaus Tunnel Chain / Letzter Tunneldurchschlag in der Tunnelkette Klaus
Start for the largest tunnel boring machine in Switzerland / Start für größte Tunnelbohrmaschine der Schweiz
Ground breaking at the Pforzheimer Tunnel / Anschlagsfeier für den Pforzheimer Tunnel
Marti GmbH and Marti Tunnelbau AG to build second bore of the Perjen Tunnel / Marti GmbH und Marti Tunnelbau AG bauen zweite Röhre des Perjentunnels
Fehmarn Belt Tunnel: Femern A/S names preferred bidders / Fehmarnbelt-Tunnel: Femern A/S benennt bevorzugte Bieter
Züblin to build part of the Stockholm Bypass / Züblin errichtet Teilstück des “Stockholm Bypass”
Aarau-Zurich rail corridor: direct link with 30 km long tunnel / Bahnkorridor Aarau-Zürich: Direktverbindung mit 30 km langem Tunnel
Strabag bundles infrastructure solutions / Strabag bündelt Infrastrukturlösungen
19th Vils construction materials day - Large construction sites in West Austria / 19. Vilser Baustofftag - Großbaustellen in Westösterreich
The 2016 ITA Tunnelling Awards / ITA lobt eigenen Tunnelbaupreis aus
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 1/2016Geomechanics and Tunnelling1/20164-10News

Abstract

Main breakthrough in the Ceneri Base Tunnel / Hauptdurchschlag im Ceneri-Basistunnel
First TBM breakthrough in Norway for 20 years / Erster TBM-Durchschlag in Norwegen seit 20 Jahren
Semmering Base Tunnel: start of tunnelling in Lower Austria / Semmering-Basistunnel: Start für Tunnelbau von niederösterreichischer Seite
Stellingen noise protection tunnel awarded / Lärmschutztunnel Stellingen vergeben
Asfinag awards the second bore of the Perjen Tunnel / Asfinag vergibt zweite Röhre des Perjentunnels
Züblin to extend the largest copper mine in the world / Züblin erweitert weltgrößtes Kupferbergwerk
German Railways awards the Albvorland Tunnel / Bahn vergibt Albvorlandtunnel
Works acceptance for the TBM for the Rastatt Tunnel / Werksabnahme der TBM für Tunnel Rastatt
Route planning for alignment selection commissioned for the Brenner north approach / Streckenplanung zur Trassenauswahl für den Brenner-Nordzulauf beauftragt
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 6/2015Geomechanics and Tunnelling6/2015464-471News

Abstract

First tunnel boring machine on the Austrian side of the Brenner Base Tunnel / Erste Tunnelbohrmaschine auf der österreichischen Seite des Brenner Basistunnels
TBM drive of Stadtbahn tunnel in Karlsruhe completed / TBM-Vortrieb für Stadtbahntunnel in Karlsruhe abgeschlossen
Mechanised tunnelling of the U5 in Berlin completed / Maschineller Vortrieb der U5 in Berlin beendet
Upgraded A 9 Bosruck Tunnel opened with two bores / Zweiröhrig ausgebauter A 9 Bosrucktunnel eröffnet
First infrastructure contract of the new Stockholm bypass awarded to Implenia / Erstes Infrastrukturlos der neuen Stadtumfahrung von Stockholm an Implenia vergeben
Züblin to extend the sewer network in Singapore / Züblin erweitert Kanalisationsnetz in Singapur
Test operation started in the Gotthard Base Tunnel / Testbetrieb im Gotthard-Basistunnel gestartet
Innovative tunnelling technology at the InnoTrans 2016 / Innovative Tunnelbautechnik auf der InnoTrans 2016
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 5/2015Geomechanics and Tunnelling5/2015371-378News

Abstract

First tunnel boring machine to start soon at the GKI / Erste Tunnelvortriebsmaschine am GKI vor dem Start
Tunnel ground breaking for the Stadtbahn extension in Dortmund / Tunnelanschlag für Stadtbahnerweiterung in Dortmund
Semmering Base Tunnel: start of construction of the access shafts in the Fröschnitzgraben / Semmering-Basistunnel: Startschuss für Bau der Zugangsschächte im Fröschnitzgraben
Variable Density Technology - game changer for Kuala Lumpur / Variable Density Technologie - Game Changer für Kuala Lumpur
ILF is working on the longest rail tunnel in Georgia / ILF arbeitet am längsten Eisenbahntunnel in Georgien
Breakthrough of the first tunnel for the Terzo Valico railway line in Italy / Durchbruch des ersten Tunnels der italienischen Eisenbahnlinie Terzo Valico
European Parliament confirms 1.18 b. Euros of financing for the Brenner Base Tunnel / Europäisches Parlament bestätigt Finanzierung von 1,18 Mrd. Euro für den Brenner Basistunnel
More than 110 projects entered for the ITA Award 2015 / Mehr als 110 Projekte für den ITA Award 2015 eingereicht
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 4/2015Geomechanics and Tunnelling4/2015291-298News

Abstract

Semmering Base Tunnel: Gloggnitz Tunnel contract awarded / Semmering-Basistunnel: Baulos Tunnel Gloggnitz vergeben
Italy approves 920 m. Euros for the third contract of the Brenner Base Tunnel / Italien gibt 920 Mio. Euro für drittes Baulos des Brenner Basistunnels frei
Bilfinger sells Infrastructure Division to Porr / Bilfinger verkauft Division Infrastructure an Porr
Implenia wins contract for the new Bözberg rail tunnel / Implenia erhält Zuschlag zum Neubau des Bözberg-Eisenbahntunnels
Crossrail's tunnelling marathon completed / Crossrail Tunnelmarathon abgeschlossen
New line from Wendlingen to Ulm: Breakthrough in the Imberg Tunnel / Neubaustrecke Wendlingen-Ulm: Durchschlag beim Tunnel Imberg
General refurbishment of the Oswaldiberg Tunnel awarded / Generalsanierung des Oswaldibergtunnels vergeben
Züblin Spezialtiefbau wins the Ground Engineering Award 2015 / Züblin Spezialtiefbau mit dem Ground Engineering Award 2015 ausgezeichnet
200 participants visited the Tunnelling Colloquium at the FH Münster / 200 Teilnehmer besuchten das Tunnelbau-Kolloquium an der FH Münster
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 3/2015Geomechanics and Tunnelling3/2015184-190News

Abstract

Ceremonial tunnel breakthrough in the Granitztal valley / Feierlicher Tunnelanschlag im Granitztal
TBM start at the Boßler Tunnel / TVM am Boßlertunnel gestartet
Start of excavation of the Imberg Tunnel / Vortriebsbeginn am Tunnel Imberg
Start of the main bores of the Brenner Base Tunnel / Startschuss für die Hauptröhren des Brenner Basistunnels
South drive broken through at the Ceneri Base Tunnel / Südvortriebe am Ceneri-Basistunnel durchgeschlagen
Breakthrough of the second bore at the Gleinalm Tunnel / Durchschlag zweite Röhre Gleinalmtunnel
Complete upgrading of the Karawanken Tunnel agreed / Vollausbau des Karawankentunnels vereinbart
Implenia awarded infrastructure project in Norway / Implenia erhält Infrastrukturprojekt in Norwegen
The 2015 ITA Tunnelling Awards / ITA lobt eigenen Tunnelbaupreis aus
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 2/2015Geomechanics and Tunnelling2/201592-102News

Abstract

Work starts on a further main contract of the Koralmbahn / Baustart für weiteres Hauptbaulos der Koralmbahn
Start of tunnelling in the second bore of the Burgberg Tunnel / Vortriebsbeginn für zweite Röhre Burgbergtunnels
Ground breaking ceremony for the GKI inclined shaft / Anschlagfeier für GKI-Schrägschacht
New record for a Herrenknecht TBM / Neuer Rekord für Herrenknecht-TBM
Crossrail TBM Elizabeth reaches the last intermediate station / Cross Rail-TBM Elizabeth erreicht letzte Zwischenstation
Breakthrough in the Tunnel de Court / Durchbruch im Tunnel de Court
Wet commissioning of the pumped storage hydropower station Reißeck II / Nasse Inbetriebsetzung des Pumpspeicherkraftwerks Reißeck II
Third line section of the NBS Wendlingen-Ulm awarded / Dritter Streckenabschnitt für NBS Wendlingen-Ulm vergeben
Swiss Tunnel project under the leadership of Porr / Schweizer Tunnelprojekt unter der Führung von Porr
Handbook Monitoring / ÖGG-Handbuch Monitoring
ILF receives an optimisation commission for the Austrian section of the Brenner Base Tunnel / ILF erhält Optimierungsauftrag für den österreichischen Abschnitt des Brenner Basistunnels
New ventilation for the Karawanken Tunnel / Neue Lüftung für den Karawankentunnel
36th Annual short course on grouting fundamentals and current practice
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 1/2015Geomechanics and Tunnelling1/20153-12News

Abstract

Start of second tunnel drive at the Waterview Connection Project / Start für zweiten Vortrieb im Projekt Waterview Connection
Start for the second tunnel bores at Klaus / Startschuss für zweite Tunnelröhren bei Klaus
Brenner Base Tunnel - tunnelling starts in the Ahrental / Brenner Basistunnel - Vortriebsbeginn im Ahrental
Tunnelling works start for second underground line in Rennes / Vortrieb für die zweite U-Bahnlinie in Rennes beginnt
Granitztal Tunnel Chain awarded / Tunnelkette Granitztal vergeben
SBB awards the construction of the Eppenberg Tunnel / SBB vergibt Bau des Eppenbergtunnels
Züblin to build hydropower station in Chile / Züblin baut Wasserkraftwerk in Chile
Design collaboration commissioned for the Austrian side of the Brenner Base Tunnel / Planungsgemeinschaft auf der österreichischen Seite am Brenner Basistunnel beauftragt
Amberg Engineering to design a road tunnel under the Suez Canal / Amberg Engineering plant Straßentunnel unter dem Suezkanal
Terratec to deliver a double shield TBM for hydropower station in Laos / Terratec liefert Doppelschild-TBM für Wasserkraftwerk in Laos
Implenia takes over Bilfinger Construction / Implenia übernimmt Bilfinger Construction
Leighton sells John Holland to CCCI / Leighton verkauft John Holland an CCCI
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 6/2014Geomechanics and Tunnelling6/2014644-651News

Abstract

Contract for the Eisack crossing awarded / Baulos Eisackunterquerung vergeben
Preliminary works for the new Semmering Base Tunnel in Gloggnitz completed / Vorarbeiten für den Semmering-Basistunnel neu in Gloggnitz abgeschlossen
Machine baptism at the Bossler Tunnel / Maschinentaufe am Boßlertunnel
Construction of the harbour tunnel in Bremerhaven awarded / Bau des Hafentunnels in Bremerhaven beauftragt
Half time at the Steinbühl Tunnel on the new line / Halbzeit am Steinbühltunnel auf der Neubaustrecke
Jagdberg Tunnel open for traffic / Freie Fahrt am Jagdbergtunnel
Last sleeper laid in the Gotthard Base Tunnel / Letzte Schwelle im Gotthard-Basistunnel eingebaut
Training on “Conventional Tunnelling” organized by DGPC in collaboration with ITA-CET and ITA-AITES

x
News: Geomechanics and Tunnelling 5/2014Geomechanics and Tunnelling5/2014390-401News

Abstract

Ventilation shaft for the Brenner Base Tunnel completed / Lüftungsschacht für den Brenner Basistunnel fertiggestellt
Bilfinger installs penstock for Austrian hydropower station / Bilfinger installiert Druckrohrleitungen für österreichische Wasserkraftwerke
Crossrail TBM Jessica arrives / Crossrail TBM Jessica am Ziel
Start of construction works on the largest yet contract of the BBT / Beginn der Bauarbeiten für das bisher größte Baulos des BBT
Klaus Tunnel Chain improvement / Vollausbau Tunnelkette Klaus
Final breakthrough at the Slowacki Tunnel / Finaler Durchschlag beim Slowacki-Tunnel
Germany railways DB awards structural works for the Rastatt Tunnel / Bahn vergibt Rohbauarbeiten für Tunnel Rastatt
Strabag to build outfall tunnel in Canada / Strabag baut Abwassertunnel in Kanada
Construction contracts awarded for the Gemeinschaftskraftwerk Inn / Bauaufträge für Gemeinschaftskraftwerk Inn vergeben
Ceneri Base Tunnel: delay of two years possible / Ceneri-Basistunnel: Verzögerung um zwei Jahre möglich
ITAWTC 2015 in Dubrownik
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 4/2014Geomechanics and Tunnelling4/2014291-298News

Abstract

General refurbishment of the Bruck/Mur tunnel chain / Generalsanierung der Tunnelkette Bruck/Mur
Construction start in the Albabstieg Tunnel - Rail project Stuttgart-Ulm / Baustart für den Albabstiegstunnel - Bahnprojekt Stuttgart-Ulm
Underground network extension in Copenhagen / U-Bahnnetzerweiterung in Kopenhagen
Construction of North West Rail Link underway in Australia / Arbeiten am North West Rail Link in Australien aufgenommen
Large construction contract awarded for the Brenner Base Tunnel / Großbaulos am Brenner Basistunnel vergeben
Extension of the U3 in Nuremberg / Verlängerung der U3 in Nürnberg
Groundbreaking at Obervermuntwerk II / Anschlag für Obervermuntwerk II
Rapid construction start for the Marieholm Tunnel in Göteborg / Schneller Baustart für Marieholmstunnel in Göteborg
Crossrail Project still well underway / Crossrail-Projekt nach wie vor auf einem guten Weg
New website of the Austrian society for Geomechanics / Neue Webseite der Österreichischen Gesellschaft für Geomechanik
Filder Tunnel Kick-off / Start des Fildertunnels
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 3/2014Geomechanics and Tunnelling3/2014196-203News

Abstract

17 bids for the main contracts of the Fehmarn Belt Tunnel / 17 Angebote für Hauptbaulose des Fehmarnbelttunnels
Multi-function tunnel for Wuhan / Multifunktionstunnel für Wuhan
Tunnelling started at the Albabstieg Tunnel / Vortriebsarbeiten am Albabstiegstunnel angelaufen
Symbolic blast in the Falkenberg Tunnel / Symbolische Sprengung im Falkenbergtunnel
Bilfinger to build the Eiganes Tunnel in Stavanger / Bilfinger baut Eiganestunnel in Stavanger
Preparation works for particle accelerator in Darmstadt / Vorbereitungen für Teilchenbeschleuniger in Darmstadt
Austrian hydropower project wins the European Concrete Award 2014 / Österreichisches Wasserkraftprojekt mit dem European Concrete Award 2014 ausgezeichnet
New Year's film 2013 from AlpTransit / Neuer Jahresfilm 2013 der AlpTransit
No official introduction of the new revision of DIN EN 1997-1:2014-03 (Eurocode 7-1) / Keine bauaufsichtliche Einführung der neuen Fassung der DIN EN 1997-1:2014-03 (Eurocode 7-1)
NATM Engineering Seminar in Santiago, Chile / NATM Engineering Seminar in Santiago, Chile
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 2/2014Geomechanics and Tunnelling2/2014104-111News

Abstract

Start of construction on the third Koralm Tunnel main contract / Baubeginn für drittes Koralmtunnel-Hauptbaulos
Eighth Crossrail TBM started / Achte Crossrail-TBM gestartet
Preparations for the intermediate start in the Albabstieg Tunnel / Vorbereitungen für den Zwischenangriff des Albabstiegstunnels
Construction contract awarded for the Obervermunt II power station / Bauauftrag für das Kraftwerk Obervermunt II vergeben
15 Herrenknecht TBMs for new Metro network in Doha / 15 Herrenknecht TBMs für neues Metronetz in Doha
Development of a coal mine using a TBM / Erschließung eines Steinkohlenbergwerks mittels TBM
Site Investigation by Seismic Methods - a new guideline / Seismische Baugrunderkundung - ein neues Merkblatt
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 1/2014Geomechanics and Tunnelling1/20144-11News

Abstract

New pressure tunnel for the Bärenwerk hydropower station / Neuer Druckstollen für Wasserkraftwerk Bärenwerk aufgefahren
Second tunnel breakthrough on the Schwäbisch Alb / Zweiter Tunneldurchschlag auf der Schwäbischen Alb
First blast in Wolf / Erste Sprengung in Wolf
Breakthrough in the Scheibengipfel Tunnel for the Reutlingen bypass / Durchschlag am Scheibengipfeltunnel der Ortsumgehung Reutlingen
S 10 Tunnel Götschka - breakthrough of the second bore / S 10 Tunnel Götschka - Durchschlag der zweiten Tunnelröhre
New Semmering Base Tunnel: Start of the first tunnelling contract / Semmering-Basistunnel neu: Baustart des ersten Tunnelbauloses
Porr awarded three contracts on the Vienna underground system / Porr erhält drei Baulose im Wiener U-Bahn-Netz
Emschergenossenschaft awards a further large contract / Emschergenossenschaft vergibt weiteres Großbaulos
European construction industry considers tunnel under the Baltic / Europäische Bauindustrie nimmt Tunnel unter der Ostsee ins Visier
Trial operation commenced in the Gotthard Base Tunnel / Versuchsbetrieb im Gotthard-Basistunnel aufgenommen
Jäger Bau building a water supply tunnel on Crete / Jäger Bau erstellt Wasserüberleitungstunnel in Kreta
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 6/2013Geomechanics and Tunnelling6/2013626-634News

Abstract

Breakthrough at Sparvo Tunnel / Durchschlag am Sparvo-Tunnel
First Crossrail tunnel complete / Erster Crossrail-Tunnel fertig
Final breakthrough at Hallandsas-Tunnel / Durchbruch am Hallandsas-Tunnel
Main construction contracts for the Brenner Base Tunnel tendered / Großbaulose für den Brenner Basistunnel ausgeschrieben
Vinci builds Line B of the Rennes Metro / Vinci baut Linie B für die U-Bahn Rennes
Wolf II contract awarded / Baulos Wolf II vergeben
Hydropower experts from all over the world in Innsbruck / Wasserkraft-Experten aus aller Welt in Innsbruck
Terratec delivers sixth TBM for Delhi Metro Phase III / Terratec liefert sechsten TBM für Delhi Metro Phase III
Master Builders Solutions globally introduced to Underground Construction industry / BASF führt Master Builders Solutions weltweit in der Tunnel- und Bergbaubranche ein
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 5/2013Geomechanics and Tunnelling5/2013386-397News

Abstract

Breakthrough in the Pyrenees - Durchschlag in den Pyrenäen
Half time for the Crossrail Tunnel in southeast London - Halbzeit für die Crossrail Tunnel im Südosten Londons
Tunnel breakthrough at the Port of Miami Tunnel - Tunneldurchschlag am “Port of Miami-Tunnel”
Contract KAT3 for the Koralm Tunnel awarded - Baulos KAT3 für Koramtunnel vergeben
Start of the Albabstieg Tunnel in early 2014 - Baubeginn für Albabstiegstunnel im Frühjahr 2014
Contracts awarded for the underground in Riyadh - Aufträge für U-Bahn in Riad vergeben
Award of the railway infrastructure for the Ceneri Base Tunnel - Vergabe der Bahntechnik am Ceneri-Basistunnel
New owner for Alpine subsidies - Neue Eigentümer für Alpine-Töchter
TBM for new Bosporus crossing - TBM für neue Bosporus-Unterquerung
Call for papers - Themes for the next issues of Geomechanics and Tunnelling -Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 4/2013Geomechanics and Tunnelling4/2013295-300News

Abstract

Major breakthrough for Crossrail as tunnelling machine enters Canary Wharf station / Durchbruch für Crossrail-TBM in die Canary Wharf Station
Breakthrough of new pressure shaft for the Kaunertal power station / Durchschlag beim neuen Druckschacht für das Kaunertalkraftwerk
Breakthrough of the second bore of the Neumarkt Tunnel / Durchschlag zweite Röhre Tunnel Neumarkt
First tunnel element submerged for the Söderström Tunnel / Erstes Tunnelelement am Söderströmstunnel abgesenkt
Underground in Qatar - largest contract in the history of Porr / U-Bahnbau in Katar - größter Auftrag in der Unternehmensgeschichte von Porr
Prequalification for the Fixed Fehmarn Belt crossing / Präqualifikation für Feste Fehmarnbeltquerung
German Founder's prize for Martin Herrenknecht / Deutscher Gründerpreis für Martin Herrenknecht
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 3/2013Geomechanics and Tunnelling3/2013188-196News

Abstract

• Closer cooperation on sprayed concrete technology in tunnelling and mining / Engere Zusammenarbeit zum Einsatz von Spritzbeton im Tunnel- und Bergbau
• Underground metro tunnels in Wuxi completed / Vortrieb der U-Bahn ist in Wuxi beendet
• Milan metro double / Milan Metro: Zeitgleicher Durchbruch
• Koralmtunnel: Start of the second TBM / Zweite Tunnelvortriebsmaschine im Koralmtunnel gestartet
• Progress on the Alb ascent on the new line Wendlingen-Ulm / Baufortschritte am Albaufstieg der Neubaustrecke Wendlingen-Ulm
• Simem Spa and Putzmeister Group agreed to join forces / Simem Spa und Putzmeister Group vereinigen ihre Kräfte
• Second tunnel completed at the Limmern hydropower plant / Zweiter Stollen für Wasserkraftwerk Limmern vollendet
• Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 2/2013Geomechanics and Tunnelling2/201391-100News

Abstract

Nominees for bauma Innovationspreis 2013 / Nominierungen für den bauma Innovationspreis 2013
Strabag and Rio Tinto try out the Mobile Tunnel Miner / Strabag und Rio Tinto erproben Mobile Tunnel Miner
First TBM starts operation in the Koralm Tunnel / Erste TBM am Koralmtunnel in Betrieb genommen
New tunnel at Küchen on the autobahn A 44 / Tunnel-Neubau Küchen im Zuge der A 44
Asfinag awards the general refurbishment of the Bosruck Tunnel / Asfinag vergibt Generalsanierung des Bosrucktunnels
Start of construction at the Crossrail Tunnel portal at Victoria Dock / Baubeginn am Crossrail-Tunnelportal Victoria Dock
Further machines for the Crossrail Project in London / Weitere Maschinen für Crossrail-Projekt in London
37 new escape routes for the Arlberg Tunnel / 37 neue Fluchtwege für den Arlbergtunnel
Revised construction schedule for Stuttgart 21 - Tunnel projects in preparation / Überarbeiteter Bauzeitenplan für Stuttgart 21 - Tunnelprojekte in der Vorbereitung
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 2/2013Geomechanics and Tunnelling1/20134-12News

Abstract

Germany's third longest rail tunnel in operation / Deutschlands drittlängster Bahntunnel in Betrieb
Current status of design on the Rastatt Tunnel / Aktueller Planungsstand bei Tunnel Rastatt
DB awards the Widderstall Tunnel (NBS) / DB vergibt Tunnel Widderstall (NBS)
A14: Half-time for the refurbishment of the Pfänder Tunnel / A14: Halbzeit bei der Sanierung des Pfändertunnels
Reißeck II: Half time at the largest power station site in Austria / Reißeck II: Halbzeit auf Österreichs größter Kraftwerksbaustelle
Construction contract awarded for the Stadtbahn Dortmund / Bauauftrag für Stadtbahn Dortmund vergeben
Strabag wins a contract for part of the Westbahn line / Strabag erhält Auftrag für Teilstück der Westbahn
Development of resource-efficient and advanced underground technologies - Montan Universität Loeben coordinates the EU-Project DRAGON
Hochtief to build hydropower station in South America / Hochtief baut Wasserkraftwerk in Südamerika
3rd International Conference on Computational Methods in Tunnelling and Subsurface Engineering (EURO:TUN 2013) / 3rd International Conference on Computational Methods in Tunnelling and Subsurface Engineering (EURO:TUN 2013)
Herrenknecht takes over Techni-Métal Systemes / Herrenknecht übernimmt Techni-Métal Systemes
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 6/2012Geomechanics and Tunnelling6/2012653-659News

Abstract

Ahrental access tunnel at the Brenner broken through / Zufahrtstunnel Ahrental am Brenner durchgeschlagen
S10 - Start of the Neumarkt Tunnel / S10 - Tunnelanschlag Neumarkt
Alpine completes the first underground tunnel for the Singapore Downtown Line / Alpine stellt ersten U-Bahn Tunnel der Singapur Downtown Line fertig
German Railways DB awards Albaufstieg tunnels / Deutsche Bahn vergibt Tunnelbauwerke des Albaufstiegs
Hochtief extends the subway in New York / Hochtief erweitert die U-Bahn in New York
Crossrail TBMs for the east section to start soon / Crossrail-TBMs für den Ostabschnitt vor dem Start
Works acceptance for Danzig TBM / Werksabnahme für Danziger TBM
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
News: Geomechanics and Tunnelling 5/2012Geomechanics and Tunnelling5/2012406-415News

Abstract

Breakthrough of the Eyholz Tunnel / Durchschlag des Tunnels Eyholz
Galleria Sparvo - breakthrough of the first tunnel bore / Galleria Sparvo - Durchbruch der ersten Tunnelröhre
Last tunnel breakthrough on the new line from Nuremberg to Berlin / Letzter Tunneldurchschlag für Neubaustrecken Nürnberg-Berlin
Strabag awarded tunnelling contract at the largest copper mine in the world / Strabag erhält Tunnelbau-Auftrag in größter Kupfermine der Welt
German government provides finance for the Rastatter Tunnel / Bund stellt Finanzmittel für den Rastatter Tunnel bereit
Deutsche Bahn awards further engineering structures for the major project Stuttgart 21 / Deutsche Bahn vergibt weitere Ingenieurbauwerke im Großprojekt Stuttgart 21
New venue for the 8th trade exhibition “Foundation and well construction” & 9th Austrian Geotechnics Conference with the “Vienna -Terzaghi Lecture” / Neuer Veranstaltungsort für die 8. Fachausstellung “Grundbau-Brunnenbau” & 9. Österreichische Geotechniktagung mit “Vienna -Terzaghi Lecture”
Porr receives a first contract in Qatar / Porr erhält ersten Auftrag in Katar
Aker Wirth delivers the first tunnel boring machine for the Koralm Tunnel / Aker Wirth liefert erste Tunnelbohrmaschine für den Koralmtunnel aus
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x