Author(s): | |
Title: | Assembly of the steel roof structure for the football stadium in Gdansk |
Abstract: | The technology of assembling the roof over the stadium built in Gdan´sk for the EURO 2012 European Football Championship is discussed here. The stadium has a characteristic silhouette - its shape and the colours of the façade resemble a cut block of amber. The steel roof structure has a quasi-elliptical form, with a maximum diameter of 220 m and minimum diameter of 187 m. It is 38 m high and the roof girders extend 48 m over the grandstand below. The roof structure weights 7150 t and was assembled in 226 days. |
Source: | Steel Construction 6 (2013), No. 1 |
Page/s: | 54-60 |
Language of Publication: | English |
I would like to buy the article
You can download this article for 25 € as a PDF file (1.64 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library. |
I would like to order "Steel Construction"This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |