Autor(en): | Anagnostou, Georg; Schuerch, Roberto; Perazzelli, Paolo |
Titel: | Lake Mead Intake No 3 Tunnel - Design considerations and construction experience |
Kurzfassung: | This paper presents the pre-construction evaluation of the ground for the Lake Mead Intake No 3 Tunnel and the experience gained from the project, which had the aim of maintaining water supplies for the Las Vegas greater metropolitan area. The construction of this tunnel using a dual-mode slurry shield represents a major engineering achievement, which pushed back the boundaries of closed shield tunnelling: Overcoming an extended fault zone under high hydrostatic pressure in the metamorphic rocks and mucking-out difficulties associated with high rates of water inflow in the sedimentary rocks necessitated closed-mode operation over about 2 km at unprecedentedly high face pressures of up to 14 bar. |
Erschienen in: | Geomechanics and Tunnelling 11 (2018), Heft 1 |
Seite/n: | 15-23 |
Sprache der Veröffentlichung: | Englisch/Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (2.2 MB) herunterladen. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanics and Tunnelling" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanics and Tunnelling" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanics and Tunnelling" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |