Gobiet, Gerhard
 
Title:     
 

 
Abstract:     
 
The New Semmering Base Tunnel (SBTn) has been designed with a flat gradient to meet the requirement for uniform high-speed rail infrastructure for the new Südbahn line, which is considered an internationally significant transport corridor for Austria as an industrial location. The 27.3 km tunnel is divided into a number of construction sections with separate contracts due to the geological and hydrogeological conditions. In addition to the tunnel drives from the Gloggnitz portal, the tunnel will also be driven from three intermediate starting points. The individual tunnelling contracts will be started at intervals of about one year. The first tunnelling contract starts in 2014 in the Fröschnitzgraben, the drives in Gloggnitz and the intermediate starting point at Göstritz in 2015 and the tunnel drive in Grautschenhof from 2016. From 2021, when all tunnelling works have been completed and the structure of the two running tunnels has been completed, the installation of the tunnel equipment will start. Opening for service is intended for the end of 2014.
Der Semmering-Basistunnel neu (SBTn) wurde gemäß den Vorgaben zur Bereitstellung einer einheitlich leistungsfähigen Eisenbahninfrastruktur für die neue Südbahn, die als international bedeutende Verkehrsachse für den Wirtschaftsstandort Österreich gilt, mit einer flachen Neigung konzipiert. Der 27,3 km lange Tunnel wird aufgrund der geologischen und hydrogeologischen Verhältnisse sowie der baulogistischen und tunnelbautechnischen Anforderungen in mehreren Bauabschnitten mit unterschiedlichen Baulosen errichtet. Neben den Vortrieben vom Portal Gloggnitz wird der Tunnel über drei Zwischenangriffe aufgefahren. Die einzelnen Tunnelbaulose werden gestaffelt in Abständen von etwa einem Jahr begonnen. Das erste Tunnelbaulos startet 2014 im Fröschnitzgraben, 2015 beginnen die Vortriebe in Gloggnitz und beim Zwischenangriff Göstritz, ab 2016 erfolgt der Tunnelvortrieb in Grautschenhof. Ab 2021, wenn alle Vortriebsarbeiten abgeschlossen und die beiden Tunnelröhren im Rohbau durchgängig fertiggestellt sind, beginnt der Einbau der Tunnelausrüstung. Die Inbetriebnahme ist Ende 2024 vorgesehen.
 
Source:     Geomechanics and Tunnelling 6 (2013), No. 6
 
Page/s:     680-687
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (1.44 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.