Logo Ernst und Sohn

Preview

Author(s):     
 
Carlucci, Alberto; Hooton, Martin; Salim, Hj Mazlan Abd; Yip, Sammy; Moneypenny, Kelvin; Kite, Steve
 
Title:     
 
Temburong Bridge, Brunei - Design of two cable stayed bridges
 
Abstract:     
 
The Temburong Bridge Project is a 30 km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei districts. The main objective of the project is to stimulate economic growth in the Temburong region by connecting it to the country's airport and ports. The alignment crosses two navigation channels resulting in the need for two cable stayed bridges - the Brunei Channel Bridge (145 m main span) and the Eastern Channel Bridge (260 m main span).
The design of these cable stayed bridges is one of the first applications of the Eurocode to a fully concrete cable stayed bridge. Both cable stayed bridges draw on strong Islamic architectural influences from the region to form a tower shape that is unique and instantly recognisable.

Temburong Brücke, Brunei - Entwurf von zwei Schrägkabelbrücken
Die Temburong Brücke ist eine 30 km lange Verbindung über die Brunei Bucht mit zwei Richtungsfahrbahnen mit je zwei Fahrstreifen. Sie wird den relativ isolierten Distrikt Temburong mit den anderen drei Distrikten Bruneis verbinden. Hauptanliegen des Projekts ist die Stimulierung von ökonomischem Wachstum in der Temburong Region, indem sie an den Flughafen und Seehafen des Landes angebunden wird. Die Trassierung erfordert die Überquerung zweier Schiffahrtsrouten. Dies wird mit der Anordnung zweier Schrägkabelbrücken ermöglicht, der Brunei Channel Brücke (145 m Hauptspannweite) und der Eastern Channel Brücke (260 m Hauptspannweite).
Die Bemessung der beiden Brücken stellt eine der ersten Anwendungen des Eurocode auf Schrägkabelbrücken mit Betonüberbau dar. Optisch sind die beiden Brücken geprägt von der islamischen Architektur der Umgebung, die Pylonform ist ein besonderes Erkennungsmerkmal der Brücken.
 
Source:     Bautechnik 92 (2015), No. 3
 
Page/s:     220-226
 
Language of Publication:     English



I would like to buy the article

You can download this article for 25 € as a PDF file (0.84 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Bautechnik" you can access this article via Wiley Online Library.

I would like to order "Bautechnik"

This article has been published in the journal "Bautechnik". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.