Logo Ernst und Sohn

Preview

Author(s):     
 

 
Title:     
 

 
Abstract:     
 
The joint venture Bau Obervermuntwerk II, consisting of the companies Jäger Bau, Porr, Östu-Stettin and Hinteregger are constructing the pumped storage works Obervermunt II (OVW II) under a contract from the Vorarlberger Illwerke AG between the Silvretta and the Vermunt reservoirs. The Obervermuntwerk II is being built as a parallel works to the existing Obervermuntwerk (OVW). Together with the OVW II, a new headrace is being built for the existing Obervermuntwerk and the existing overground penstock will be demolished. All excavation is being undertaken conventionally by drill and blast; only the surge tank and the pressure shaft will be excavated by raise boring previously excavated mucking shafts. The aggregates for the concrete of the Obervermunt II power station (about 200,000 m3) are being prepared from excavated material as far as possible. A dedicated material processing plant for the project is being operated in Vermunt as well as a batching plant.
Die Arbeitsgemeinschaft Bau Obervermuntwerk II, bestehend aus den Firmen Jäger Bau, Porr, Östu-Stettin und Hinteregger errichtet im Auftrag der Vorarlberger Illwerke AG zwischen dem Speichersee Silvretta und dem Speichersee Vermunt das Pumpspeicherwerk Obervermunt II (OVW II). Das Obervermuntwerk II wird als Parallelwerk zum bestehenden Obervermuntwerk (OVW) errichtet. Mit der Errichtung des OVW II wird auch eine neue Triebwasserführung für das bestehende Obervermuntwerk hergestellt und die bestehende oberirdische Druckrohrleitung abgetragen. Sämtliche Ausbrucharbeiten erfolgen konventionell im Sprengvortrieb, lediglich beim Wasserschloss und dem Druckschacht werden mittels Raiseboring vorab Schutterschächte hergestellt. Die Zuschlagstoffe für den Beton des Kraftwerks Obervermunt II (ca. 200.000 m3) werden so weit wie möglich aus dem Ausbruchmaterial aufbereitet. Für diese Maßnahme wird im Bereich Vermunt eine eigene Materialaufbereitungsanlage sowie eine Betonmischanlage betrieben.
 
Source:     Geomechanics and Tunnelling 9 (2016), No. 5
 
Page/s:     435-446
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.66 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.