The ÖBB-Infrastruktur AG operates and maintains 246 tunnels and similar structures with an overall length of approx. 250 km. Nearly 150 of these structures are more than 100 years old, 35 of them are over 150 years old. Ageing processes, the impact of train traffic, ground conditions and environmental conditions are causing progressive damage to the tunnel linings, which - in order to maintain safe railway operation - requires ongoing maintenance procedures. Those procedures are carried out under a range of restrictions concerning availability, which is one of the most important principles at the ÖBB after safety. In order to obtain continuous availability of the facility, new methods of refurbishment were developed for the two double-track tunnels Rekawinkler Tunnel and Kleine Dürreberg. The described methods enabled extensive repair works of the tunnels, mostly with uninterrupted train traffic on the second track.
Die ÖBB-Infrastruktur AG betreibt und erhält 246 Tunnel und tunnelähnliche Bauwerke mit einer Gesamtlänge von ca. 250 Tunnelkilometer. Ungefähr 150 dieser Bauwerke weisen ein Alter von mehr als 100 Jahren auf, 35 sind sogar mehr als 150 Jahre alt. Alterungsprozesse, hervorgerufen durch Einflüsse aus dem Betrieb, aus dem Gebirge sowie aus den Umweltbedingungen führen zu fortschreitenden Schäden an den Tunnelauskleidungen und erfordern zur Aufrechterhaltung eines sicheren Bahnbetriebs laufende Instandhaltungsmaßnahmen. Die Umsetzung derartiger Maßnahmen führt häufig zu Behinderungen im laufenden Bahnbetrieb und zu Einschränkungen der Anlagenverfügbarkeit, die innerhalb der ÖBB neben der Sicherheit als eine der höchsten Prämissen angesehen wird. Für die Ertüchtigung des zweigleisigen Rekawinkler- und Kleinen Dürrebergtunnels wurden daher Methoden entwickelt, die eine umfangreiche Instandsetzung des Tunnelgewölbes größtenteils unter laufendem Bahnbetrieb des zweiten Gleises ermöglichte und die Anlagenverfügbarkeit bestmöglich gewährleistet haben.
 
Source:     Geomechanics and Tunnelling 10 (2017), No. 5
 
Page/s:     533-541
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.09 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.