The southern tube of the Koralm Tunnel, contract KAT3, is being conventionally excavated with two-pass lining, while the northern tube is being driven by TBM with single-pass segment lining. The tunnel tubes are located in quite different geotechnical conditions, with soft ground of high and low permeability, major fault zones and hard rock. Cross passages are provided about every 500 m of the 12 km long tunnel section. Different support types are required for the opening of the segment lining and connection to the excavation of the cross passage. In hard rock, the support consists of anchors, tail void grout and permanent bolts between the segments. In soft ground, a temporary pre-stressed steel structure is provided, with longitudinal dowels at ring joints and special segments with increased reinforcement for the special case where cross passage excavation enters the segment-lined tunnel.
Im Baulos KAT3 des Koralmtunnels KAT3 wird die Südröhre konventionell mit zweischaligen Ausbau und die Nordröhre maschinell mit einschaliger Tübbingauskleidung aufgefahren. Die Fahrröhren liegen in sehr unterschiedlichen geologischen Verhältnissen wie durchlässigen und undurchlässigen Lockerböden mit hohem Wasserdruck, großen Störungszonen und langen Abschnitten mit standfestem Gebirge. So wie für den gesamten Tunnel sind auch für den 12 km langen Tunnelabschnitt in der Nordröhre Querschläge im Abstand von rund 500 m herzustellen. Das Auffahren der Nordröhre erfolgt mittels einer Tunnelvortriebsmaschine (TVM) mit einschaliger Tübbingauskleidung. Aufgrund dieser Randbedingungen ergeben sich unterschiedliche Sicherungstypen für die Querschlaganbindung an die Tübbingröhre. Im kristallinen Festgestein erfolgt die Sicherung durch Anker, Ringspaltvermörtelung und permanente Schrauben. In den neogenen Sedimenten wurde eine temporäre Sicherung mit vorgespannter Stahlabstützung, Längsdübeln in den Ringfugen und Sondertübbingen entwickelt, die für diesen besonderen Fall des Einfahrens des Querschlagvortriebs in die Tübbingröhre anwendbar ist.
 
Source:     Geomechanics and Tunnelling 12 (2019), No. 1
 
Page/s:     33-44
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (0.65 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.