Author(s):     
 
Pfeffer, Robert; Rohm, Paul; Oppitz, David
 
Title:     
 

 
Abstract:     
 
The Semmering Base Tunnel is being built by Austrian Federal Railways as part of the upgrading of the southern railway line. On contract SBT3.1, Züblin Spezialtiefbau Ges.m.b.H. was employed to undertake slope stabilization, piles dia. 1,500 mm embedded into the rock, as well as vertical and horizontal boreholes in the fault zones of Semmering. Due to the high requirements on drilling speed and accuracy of the boreholes, they were drilled as directional drilling with a hydraulic down-the-hole hammer. The vertical holes were used to install sleeve pipes for grouting works for the shaft Sommerau 2. The horizontal holes, also planned for the inclusion of sleeve pipes for grouting works, were used after on-site rescheduling during the project for exploration and drainage of the rock mass. The drilling and survey data were subject to continual and thorough review to increase the efficiency of each control operation.
Der Semmering-Basistunnel wird im Zuge des Ausbaus der Südbahnstrecke von den österreichischen Bundesbahnen errichtet. Die Firma Züblin Spezialtiefbau Ges.m.b.H. hat am Baulos SBT3.1 eine Hangsicherung, Pfahlbohrungen DN 1.500 mm mit Einbindung in den Felsen sowie vertikale als auch horizontale gerichtete Vollbohrungen in den gestörten Formationen des Semmerings ausgeführt. Aufgrund der hohen Anforderungen an die Bohrgeschwindigkeit und die Lagegenauigkeit der Bohrungen wurden diese als gerichtete Imlochhammerbohrungen mit Wasserspülung abgeteuft. Die vertikalen Bohrungen dienten zur Aufnahme der Manschettenrohre für die Injektionsarbeiten am Schacht Sommerau 2. Die horizontalen Bohrungen, die ebenfalls zur Aufnahme von Manschettenrohren für die Injektionsarbeiten unter Tage angedacht waren, wurden nach einer bauseitigen Umplanung während des Projekts sowohl zur vorauseilenden Erkundung als auch zur Dränage des Gebirges genutzt. Zur Steigerung der Effizienz der einzelnen Steuervorgänge erfolgte eine laufende Analyse der Bohr- und Vermessungsdaten.
 
Source:     Geomechanics and Tunnelling 12 (2019), No. 6
 
Page/s:     690-694
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (0.99 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.