Logo Ernst und Sohn

Preview

Author(s):     
 

 
Title:     
 

 
Abstract:     
 
The 32.9 km long Koralm tunnel (Austria) is the core piece of the Koralm railway and will be one of the longest railway tunnels worldwide after completion. At the longest construction section “KAT2” two approx. 17 km long parallel single-track tunnels were driven by two double-shield tunnel boring machines with a diameter of about 10 m. Accompanying the tunnelling of the two tubes, the continuous Tunnel Seismic While Drilling (TSWD) method was used shortly after the start of mechanical excavation in January 2013 until the final position was reached in February 2018. The aim was to consistently explore the rock mass up to 100 m in front of the tunnel face to detect faults and water-bearing zones which were relevant for tunnel construction. Another purpose of the measurements was to reduce the number of exploration drillings ahead of the tunnel face. After an initial test phase of about 5000 m, where exploration drillings were continuously carried out parallel with TSWD, an advanced and optimized exploration concept was evaluated and performed for permanent operation. This paper summarizes the findings gained from the TSWD measurements at this tunnel site.
Der 32,9 km lange Koralmtunnel ist das Kernstück der Koralmbahn und wird nach Fertigstellung einer der längsten Eisenbahntunnel weltweit sein. Im Baulos KAT2 haben zwei Doppelschild-Tunnelbohrmaschinen mit einem Durchmesser von etwa 10 m zwei parallele eingleisige, ca. 17 km lange Tunnelröhren aufgefahren. Begleitend zum maschinellen Vortrieb der beiden Röhren kam kurz nach Vortriebsbeginn im Januar 2013 bis zum Erreichen der Endposition im Februar 2018 die kontinuierliche tunnelseismische Vorauserkundungsmethode Tunnel Seismic While Drilling (TSWD) zum Einsatz. Ziel war es, das Gebirge bis zu 100 m vor die Ortsbrust hinsichtlich bautechnisch relevanter Störungen und wasserführender Zonen zu erkunden und gleichzeitig die Anzahl der Vorauserkundungsbohrungen vor der Ortsbrust zu reduzieren. Nach einer anfänglichen Testphase auf den ersten 5000 m, in der Vorauserkundungsbohrungen kontinuierlich und parallel zu TSWD durchgeführt wurden, wurde ein optimales Vorauserkundungskonzept evaluiert und danach auf Dauerbetrieb umgestellt. Die vorliegende Arbeit fasst die aus den TSWD-Messungen gewonnenen Erkenntnisse zusammen.
 
Source:     Geomechanics and Tunnelling 14 (2021), No. 5
 
Page/s:     616-625
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (3.59 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


Please enter your email address now to start the order process.
The link for the download will be sent to the email address stated after the
order process has been completed.

Your email address


I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.