Author(s): | Kitiyodom, Pastsakorn; Wiriyatharakij, Woraphon; Asanprakit, Auttakit; Yamchoo, Anucha |
Title: | Challenges in design and construction of Bangkok MRT Orange Line project |
Abstract: | The MRT Orange Line construction works in Bangkok are more complicated than works in earlier projects. As the tunnel alignment passes through the congested urban areas in the city, it either clashes with or passes beneath several existing structures. Underpinning works are then required. Assessment of movement of ground and structure plays an important role in the project. The rebound of piezometric pressure in sand layers that is being developed poses a major point of difficulty in the excavation and underground structure design and construction. Groundwater control measures become a crucial issue in MRT Orange Line project that leads to difficulties in deep MRT station excavations. To control base instability, various methods (e.g., cut-off wall, staged excavation) are introduced and presented in this article. |
Source: | Geomechanics and Tunnelling 16 (2023), No. 3 |
Page/s: | 263-271 |
Language of Publication: | English/German |
I would like to buy the article
You can download this article for 25 € as a PDF file (1.27 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library. |
I would like to order "Geomechanics and Tunnelling"This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |