abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Artikeldatenbank

Filter zurücksetzen
  • Autor(en)

  • Sprache der Veröffentlichung

  • Erschienen

  • Rubrik

Zeitschriften-Selektion

  • Alle auswählenAlle abwählen
Autor(en)TitelZeitschriftAusgabeSeiteRubrik
Arge - Ansprüche eines insolventen Mitglieds gegen die ArgeUnternehmerBrief Bauwirtschaft4/20051

Kurzfassung

Keine Kurzfassung verfügbar.

x
Arge - Auseinandersetzung bei Insolvenz eines Arge-PartnersUnternehmerBrief Bauwirtschaft12/20052

Kurzfassung

Keine Kurzfassung verfügbar.

x
Englert, F.ARGE Baurecht im Deutschen Anwaltverein (DAV) e. V.UnternehmerBrief Bauwirtschaft1/201118-19Verbände

Kurzfassung

No Abstract.

x
ARGE Energiepaß gegründetBautechnik1/200172Nachrichten

Kurzfassung

Keine Kurzfassung verfügbar.

x
Argumentationstraining für IngenieureBeton- und Stahlbetonbau6/2002A15Tagungen

Kurzfassung

Keine Kurzfassung verfügbar.

x
Armin Neunast 60 JahreBautechnik2/1998129Nachrichten

Kurzfassung

Keine Kurzfassung verfügbar.

x
Armin Neunast im RuhestandBautechnik5/2002345Nachrichten

Kurzfassung

Keine Kurzfassung verfügbar.

x
Walser, Peter; Trojaborg, Steen Savery; Darholm, Thomas; Kollén, Magnus; Stockmann, RicoArpeggio - die Hauptbrücke der neuen Hisingsbron in GöteborgStahlbau10/2021731-740Aufsätze

Kurzfassung

Herrn Dipl.-Ing. Wolfang Eilzer zur Vollendung des 65. Lebensjahres gewidmet.
Es wird über den Wettbewerb, die Detailplanung, die Ausschreibung und die Bauausführung des Arpeggio, der Hauptbrücke der Hisingsbronquerung in Göteborg, berichtet. Diese Hubbrücke wird die alternde Klappbrücke aus dem Jahre 1939 ersetzen und für eine bessere Anbindung von Straße, Straßenbahn sowie Geh- und Radwegen der nördlich gelegenen Bereiche an die Stadtmitte beitragen. Durch die Absenkung der Gradiente wurde es möglich, die Länge der Querung kürzer zu gestalten und somit wertvolle Flächen zur weiteren Entwicklung der Stadt zu gewinnen.

Arpeggio - the main bridge of the new Hisingsbron in Gothenborg
It is reported on the competition, detailed design, tendering and construction of the Arpeggio, the main bridge of the Hisingsbron crossing in Gothenburg. This lift bridge will replace the aging bascule bridge from 1939 and will contribute to a better connection of road, tram way and foot and cycle paths from the northern areas to the city center. By lowering the gradient, it was possible to shorten the length of the crossing and thus gain valuable space for the further development of the city.

x
ARRIBA - Komplettlösung für AVA, Kalkulation und BaumanagementBautechnik4/1998257-258EDV im Bauwesen

Kurzfassung

Keine Kurzfassung verfügbar.

x
ARRIBA für STLB-Bau-Schnittstelle zertifiziertBautechnik7/2002490Nachrichten

Kurzfassung

Keine Kurzfassung verfügbar.

x
Stiglat, K.Arroganz welcher Macht?Beton- und Stahlbetonbau12/1991285

Kurzfassung

Über die Stellung des Prüfingenieurs zwischen Aufsteller einer statischen Berechnung und der Baurechtsbehörde.

x
Vicente, Bruno AndrésArroyo Vega flood relief tunnel designGeomechanics and Tunnelling2/2023175-183Topics

Kurzfassung

This article aims to present structural and geotechnical design challenges of the flood relief project “Segundo Emisario del Arroyo Vega”, part of Buenos Aires city hydraulic master plan. Works comprised the execution of an 8.4 km-long tunnel for relief of the existing sewer network. Tunnel alignment develops in a highly populated area, with important interferences such as two metro lines, three railway lines and a main potable water tunnel. All tunnel sections extend mostly within firm, silty soils. Overburden varies between 15 and 25 m. The downstream section was executed with a 6.1 m-diameter Earth pressure Balance Tunnel Boring Machine (EPB TBM) launched from a 35 m-diameter shaft with water table pressures up to 200 kPa. Break-in was performed across a watertight, plastic diaphragm wall cell, which allowed safe shaft wall manual demolition, resulting in a very safe TBM launch. The tunnel upstream section, 2.85 m in diameter, was executed using pipe jacking technology, with the peculiarity of using bidirectional launch shafts along its alignment. To allow water entrance from existing system - through flow diversion chambers - into the new relief tunnel, openings were made in the TBM tunnel, with connection areas of 4 to 7 m2. Its design was particularly challenging, given that unbolted segmental lining was used.

x
ARTE MUNDIT - Verfahren zur Reinigung von BaudenkmälernBautechnik11/2007780Bautechnik aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
Klösges, Simon; Müller, MichaelArtificial ground freezing as a consolidation measure for tunnelling under Bern main station / Erstellung eines Gefrierkörpers als Bauhilfsmaßnahme für einen Tunnelvortrieb unter dem Hauptbahnhof BernGeomechanics and Tunnelling5/2021441-447Topics

Kurzfassung

In the course of the planned underground extension of the central station in Bern, an access tunnel had to be constructed from an existing shaft. The first 60 m of this tunnel cross through unstable, water-bearing and unconsolidated rock, and run under existing railway tracks. Thyssen Schachtbau GmbH has been commissioned the contract to carry out an artificial ground freezing measure to enhance the realization of the tunnel construction. The horizontal directional drilling work within the shaft as well as the construction and operation of the freezing plant were carried out in 2020 in a very confined space, and parallel to the ongoing operation of the train station. In order to ensure sufficient water saturation and thus the freezability of the unconsolidated rock, artificial ground irrigation procedure was operated. After completion of the predefined frost body, the tunnel was successfully and safely driven from the shaft into the bedrock.
Im Zuge der geplanten untertägigen Erweiterung des Hauptbahnhofs Bern sollte ein Zugangsstollen aus einem bestehenden Schacht heraus erstellt werden. Die ersten 60 m dieses Stollens durchqueren nicht standfestes und wasserführendes Lockergestein und verlaufen unter bestehenden Gleisanlagen. Die Thyssen Schachtbau GmbH wurde mit der Durchführung einer Baugrundvereisung beauftragt, um den bergmännischen Bau des Stollens realisieren zu können. Die horizontalen Richtbohrarbeiten innerhalb des Schachts sowie die Errichtung und der Betrieb der Gefrieranlage erfolgten im Verlaufe des Jahres 2020 auf engstem Raum parallel zum laufenden Bahnhofbetrieb. Um eine ausreichende Wassersättigung und damit Gefrierbarkeit des Lockergesteins sicherzustellen, wurde eine künstliche Baugrundbewässerung betrieben. Nach Fertigstellung des vorgegebenen Frostkörpers konnte der Stollen erfolgreich und sicher vom Schacht bis ins Festgestein vorgetrieben werden.

x
Artur Fischer - 85 JahreBeton- und Stahlbetonbau12/20041021Persönliches

Kurzfassung

Keine Kurzfassung verfügbar.

x
Arups on Engineering (D. Dunster, Editor)Bautechnik5/1998344-345Bücher

Kurzfassung

Keine Kurzfassung verfügbar.

x
Litzner, H.-U.ASBau-Standards zur Akkreditierung, Evaluierung und Weiterentwicklung von Studiengängen im BauingenieurwesenBeton- und Stahlbetonbau3/2004231-238Berichte

Kurzfassung

Keine Kurzfassung verfügbar.

x
Brux, G.Asbest beim Tunnelbau - neue RegelwerkeBautechnik10/2007743Nachrichten

Kurzfassung

Keine Kurzfassung verfügbar.

x
Asbest-Gefahr bei Dächern und FassadenBautechnik4/2004294BAUTECHNIK aktuell

Kurzfassung

Keine Kurzfassung verfügbar.

x
ASCAD TrainingskonzeptStahlbau10/1999856Termine

Kurzfassung

Keine Kurzfassung verfügbar.

x
Marinitsch, S.; Sischka, J.Ascot Racecourse - Architektur trifft TraditionStahlbau10/2007682-687Fachthemen

Kurzfassung

Ascot ist neben Wimbledon eines der sportlichen Großereignisse des Jahres. Während Royal Ascot besuchen täglich bis zu 80000 Personen die Pferderennen. International bekannt ist besonders der “Ladies Day”, wo jedes Jahr besonders extravagante Hutkreationen zu bewundern sind. Seit 2006 erstrahlt die Rennbahn im neuen Glanz. Kernstück dabei ist der neue Grand Stand, ein insgesamt 260 m langes Gebäude mit einer transparenten Glasfassade sowie einem geschwungenem Dach mit Blech- und Membranendeckung. Dieses ist geometrisch komplex und kragt bis zu 21 m über die Tribünen aus. Thema dieses Aufsatzes ist die Planung und Umsetzung der aufwendigen Dachkonstruktion unter Einhaltung eines sehr engen Terminrahmens.

x
Stihl, T.Ascot Racecourse - Stahl-Kunststoff-Sandwich für die Tribüne des neuen GrandstandStahlbau6/2009419-424Fachthemen

Kurzfassung

Die erste kommerzielle Tribünenanwendung mit dem Sandwich-Plate-System (SPS) - einem Stahl-Kunststoff-Sandwich-System - konnte durchgeführt werden, weil besondere Umstände an dem gerade fertiggestellten Tribünengebäude der Pferderennbahn in Ascot eine zusätzliche dringliche Anpassung erforderten.

Ascot Racecourse - Steel-plastic sandwich for the terrace of the new Grandstand
The first commercial application of the sandwich-plate-system (SPS) - a steel-plastic sandwich system - could be carried out because special circumstances at the just completed building of the Grandstand at Ascot Racecourse required additional urgent adjustments.

x
ASHRAE und VDI-TGA arbeiten zusammenBauphysik4/2000231Aktuelles

Kurzfassung

Keine Kurzfassung verfügbar.

x
Gokce, Hasan Burak; Demir, Korhan; Bakir, Ayd?n; Aribilginc, Tamer; Arioglu, ErginAsia Transition Box and Conventionally Excavated Twin Tunnels for the Istanbul Strait Road Crossing ProjectGeomechanics and Tunnelling4/2016310-316Topics

Kurzfassung

The 14.6 km long Istanbul Strait Road Crossing Project is a safe, quick and environmentally responsible alternative road link between Asia and Europe, as such it is being constructed under a Build-Operate-Transfer contract by a public-private partnership. The investor/contractor has committed to build the Project in 55 months and to operate the facility for a concession period of approximately 25 years. This article examines the project's two critical structures located in the Asian side of Istanbul, considering site investigation, construction and monitoring. The first structure is a cut and cover construction next to the Bosphorus, called the Asia Transition Box (ATB), which enabled the launching of the TBM and conventional tunnels. The second is the conventionally excavated twin tunnels (CETT), which pass under a highly urbanized part of Istanbul and provide the transition from the highway into the tunnel under the Bosphorus.

x
ASPAN - Durability Assessment of Sandwich Panels Intended to be used for Roof Coverings and Wall FinishesStahlbau3/2004216Termine

Kurzfassung

Keine Kurzfassung verfügbar.

x