abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Artikeldatenbank

Filter zurücksetzen
  • Autor(en)

  • Sprache der Veröffentlichung

  • Erschienen

  • Rubrik

Zeitschriften-Selektion

  • Alle auswählenAlle abwählen
Autor(en)TitelZeitschriftAusgabeSeiteRubrik
Content: Steel Construction 4/2021Steel Construction4/2021Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 4/2021Steel Construction4/2021Cover Pictures

Kurzfassung

Steel and composite bridges offer economic advantages, even for short and medium spans. To simplify and speed up the design process, ArcelorMittal now offers Advance Bridge Expert, a free preliminary design software that includes complex geometries and innovative solutions. The software is suitable for the pre-dimensioning of curved and/or skewed composite road, railway and pedestrian bridges according to the Eurocodes and several National Annexes. It supports the predesign of steel composite bridges, filler beam bridges and PreCoBeam/composite dowel strips using the hot-rolled section and modern steel grades libraries of ArcelorMittal up to S460, including HISTAR® grades and weathering steel (Arcorox®) according to EN 10025-5:2019.
The free version of Advance Bridge Expert can be downloaded from the following website:
https://sections.arcelormittal.com/design_aid/design_software/EN (© ArcelorMittal)
(Photo: Wirkowice composite bridge in Poland: Europe's first road bridge in Arcorox 460® weathering steel.
© MOSTY ZAMO Tomasz Czy)

x
Ernst & Sohn (Hrsg.)Sonderheft: European Steel Design Awards 2021Steel Construction4/20211-72Sonderheft

Kurzfassung

Keine Kurzfassung verfügbar.

x
Content: Steel Construction 3/2021Steel Construction3/2021Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 3/2021Steel Construction3/2021Cover Pictures

Kurzfassung

As part of the AiF-FOSTA research project P1020 “Economical welded joints of high-strength steels”, extensive tests were carried out at the Institute of Steel and Timber Construction at the TU Dresden. Tested were lap joints, cruciform joints and butt joints of steels in grades S500 to S960. The picture shows the flat tensile test specimens made from butt joints with a thickness of 20 mm and a width of 35 mm in the weld area to be tested. Fully and partially penetrated butt welds were tested. In order to determine the strains in the course of the tests, strain measurements were carried out using photogrammetry in addition to inductive measurements. For this purpose, a stochastic pattern of graphite spray was applied to the test specimens and the high-frequency image recordings were digitally evaluated (s. article pp. 138-149. Foto: TU Dresden, Institute of Steel and Timber Construction).

x
Cover Picture: Steel Construction 2/2021Steel Construction2/2021Cover Pictures

Kurzfassung

Approach to the alpha ventus offshore wind farm. The support structures are exposed to extreme fatigue loads. © Leibniz University Hannover, Institute for Steel Construction (s. article p. 74 ff.).

x
Content: Steel Construction 2/2021Steel Construction2/2021Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 1/2021Steel Construction1/2021Cover Pictures

Kurzfassung

The building of the San Giorgio bridge in Genoa re-establishes the connection between autoroutes A10 and A7 after the tragic event of the Morandi bridge collapse of 14 August 2018.
The bridge deck layout required the use of a torsionally rigid section. This was achieved, in particular, with two longitudinal beams spaced 7.00 m apart, a curved, calendared soffit and a top slab made of composite concrete.
The new bridge was opened on 3 August 2020, finally revealing the idea of the architect, Renzo Piano: A big, white vessel moored in the valley, a bridge that enters a dialogue with the sea, with the wind, with light, a structure that encourages builders to continue building bridges as links between territories and symbols of union. (Sarcina, G. et al., pp. 14-21)

x
Content: Steel Construction 1/2021Steel Construction1/2021Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Steel Construction: Annual table of contents Volume 13 (2020)Steel Construction1/2021Annual table of contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Content: Steel Construction 4/2020Steel Construction4/2020Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 4/2020Steel Construction4/2020Cover Pictures

Kurzfassung

A 2 stories, 15 m cantilever, called the “Effet Wow” being erected in the 8th floor in Issy-Les-Moulineaux near Paris. An exceptional space is created to accommodate 700 m2 of restaurant and bar amenities on the new Orange's Headquarters (Foto: Bouygues Bâtiment Îles de France. S. paper pp. 264 ff).

x
Cover Picture: Steel Construction 3/2020Steel Construction3/2020Cover Pictures

Kurzfassung

The 277 m high Baku Tower in Baku, the capital of Azerbaijan, is the tallest building in the Caucasus ever built. The tower is constantly subjected to enormous wind loads, that gave the city's name it's meaning “city of wind”. To cope with these wind loads a 400 t pendulum damper was installed on the tower's uppermost platform. Its special feature: in case of strong wind and earthquake, the 400 t mass block moves horizontally by up to 1.3 m in all directions in a controlled manner. This pendulum damper reduces the strain on the structure, thus it ensures the building's living and working comfort. The mass block consists of a massive steel box that was filled with concrete on site. MAURER not only manufactured the steel construction but also supervised the entire assembly and put the vibration damper into operation. (© Maurer SE)

x
Content: Steel Construction 3/2020Steel Construction3/2020Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Content: Steel Construction 2/2020Steel Construction2/2020Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 2/2020Steel Construction2/2020Cover Pictures

Kurzfassung

The fabrication of constructional steelwork with manual or automated welding takes place in a controlled and safe environment.
© Christoph Schuhknecht, Düsseldorf

x
Steel Construction: Annual table of contents Volume 12 (2019)Steel Construction1/2020Annual table of contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 1/2020Steel Construction1/2020Cover Pictures

Kurzfassung

For Schorgast Bridge Full Locked Coil Rope high strength tension components have been designed and implemented as stay cables. As part of the revision of EN 1993-1-11 the fatigue design rules for tension components have been modified and adjusted. An article in this edition provides insight and background information (Annan, R. et al., pp. 61-75) © FATZER AG

x
Content: Steel Construction 1/2020Steel Construction1/2020Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 4/2019Steel Construction4/2019Cover Pictures

Kurzfassung

In 2002, construction work for the largest combined railroad/road bridge in India started. The Bogibeel Bridge owes its name to a secluded village in the tri-border region of India, Myanmar, and the PR China, where the Brahmaputra leaves the Himalaya. MAURER supplied 164 spherical bearings to be placed between the bridge deck and the piers. The bearing specialists from Munich were awarded the contract because they succeeded in designing bearings capable of transmitting the extreme structural loads of 2,800 t, yet fitting into the confined space on the piers. (© MAURER SE)

x
Content: Steel Construction 4/2019Steel Construction4/2019Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Content: Steel Construction 3/2019Steel Construction3/2019Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Cover Picture: Steel Construction 2/2019Steel Construction2/2019Cover Pictures

Kurzfassung

MOCAPE in Shenzhen/China, housing the Museum of Contemporary Art (MOCA) and the Planning Exhibition (PE) is a vast building consisting of many long-span structural elements. The transparent façade highlights the main entrance and circulation zone between the two buildings and allows unobstructed views between the inside and outside. The open, column-free exhibition areas with heights from 6 to 17 m also strengthen the impression of a generous design concept.
(Foto © Duccio Malagamba. Paper: Ruppert et al., S. 98)

x
Content: Steel Construction 2/2019Steel Construction2/2019Contents

Kurzfassung

Keine Kurzfassung verfügbar.

x
Steel Construction: Annual table of contents Volume 11 (2018)Steel Construction1/2019Annual table of contents

Kurzfassung

Keine Kurzfassung verfügbar.

x