abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
71 Geomechanics Colloquium - 71. Geomechanik KolloquiumGeomechanics and Tunnelling5/2022Cover Pictures

Abstract

As part of the modernisation of the railway line between entilj and Maribor, the existing Poehovo tunnel will be replaced by a new tunnel. The new double-track tunnel through the Pekel Mountains is around 1530 m long and will be equipped with various safety systems. DSI provided AT - Casing System 114 with squeeze connection, self-drilling Hollow Bar Anchors as well as other ground support products in one line including lattice girders, drill steel, and pumps. Breakthrough on the new Pekel railway tunnel was achieved on 18 August 2022. (photo: DSI Underground)
Im Zuge der Modernisierung der Eisenbahnstrecke zwischen entilj und Maribor wird der Tunnel Poehovo durch einen Neubau ersetzt. Der neue zweigleisige Tunnel durch das Pekel-Gebirge ist rund 1.530 m lang und mit verschiedenen Sicherheitssystemen ausgestattet. DSI lieferte neben AT - Rohrschirmsystem, Hohlstabanker sowie Gitterträger, Bohrstahl und Pumpen. Der Durchschlag im neuen Pekel-Eisenbahntunnel erfolgte am 18. August 2022. (Foto: DSI Underground)

x
Geomechanics and Tunnelling 4/2022Geomechanics and Tunnelling4/2022Imprint

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 4/2022Geomechanics and Tunnelling4/2022Contents

Abstract

No short description available.

x
Tunnel drainage and sinteringGeomechanics and Tunnelling4/2022Cover Pictures

Abstract

To increase overall safety, standardize Croatia's highway network, and adapt to the increased traffic to and from European countries, the Croatian Government decided to build a second tube for the Uka Tunnel - the third-longest tunnel in Croatia. DSI Underground produced and supplied anchor systems and equipment to support excavation. (photo: DSI underground)
Um die Sicherheit insgesamt zu erhöhen, das kroatische Autobahnnetz zu vereinheitlichen und sich an den zunehmenden Verkehr von und nach Europa anzupassen, beschloss die kroatische Regierung den Bau einer zweiten Röhre für den Uka-Tunnel - dem drittlängsten Tunnel in Kroatien. DSI Underground lieferte Ankersysteme und Ausrüstung zur Unterstützung des Vortriebs. (Foto: DSI Underground)

x
Digitisation in Tunnelling - ResearchGeomechanics and Tunnelling3/2022Cover Pictures

Abstract

The A26 Linz Motorway is one of the most important projects to improve traffic situation in Linz as well as in the surrounding area of the Upper Austrian state capital. The first section has been under construction since the beginning of 2019 and consists of an approximately 300 m long suspension bridge over the Danube, which will be anchored in the rocky slopes above the Danube, as well as the two underground motorway interchanges Danube North and South with a total tunnel system of approximately 3200 m in length with driving or main tubes and ramps. (Source: DSI Underground)
Die A26 Linzer Autobahn ist eines der wichtigsten Projekte zur Verbesserung der Verkehrslage in Linz sowie im Umfeld der oberösterreichischen Landeshauptstadt. Der erste Abschnitt befindet sich seit Anfang 2019 im Bau und besteht aus einer rund 300 m langen Hängebrücke über der Donau, die in den Felshängen oberhalb der Donau verankert wird, sowie den beiden unterirdischen Autobahnanschlüssen Donau Nord und Süd mit einem insgesamt rund 3.200 m langen Tunnel-System mit Fahr- bzw. Hauptröhren und Rampen (Quelle: DSI Underground)

x
Content: Geomechanics and Tunnelling 3/2022Geomechanics and Tunnelling3/2022Contents

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 2/2022Geomechanics and Tunnelling2/2022Contents

Abstract

No short description available.

x
Digitisation in Tunnelling - EngineeringGeomechanics and Tunnelling2/2022Cover Pictures

Abstract

The excavation for the Slovenian part of the new tube for the Karavanke Tunnel started in August 2020. The geological and tectonic structure of the rock is very complex. To overcome the difficult tunnelling challenges, the contractor relied on support equipment from DSI Underground. (photo: DSI Underground)
Der Vortrieb für den slowenischen Teil der neuen Röhre für den Karawanketunnel begann im August 2020. Die geologische und tektonische Struktur des Gebirges ist sehr komplex. Um die schwierigen tunnelbautechnischen Herausforderungen zu bewältigen, setzte das Bauunternehmen auf Stützmittel von DSI Underground. (Foto: DSI Underground)

x
Geomechanics in geothermal energyGeomechanics and Tunnelling1/2022Cover Pictures

Abstract

The 27 km long second track between Divaa and Koper is one of Slovenia's most important infrastructure projects and includes eight tunnels with a total length of approx. 20.5 km. For tunnel T8, starting form Koper to the North, DSI Underground supplies all ground support equipment. (photo: DSI Underground)
Die 27 km lange zweite Bahnstrecke zwischen Divaa und Koper ist eines der größten Infrastrukturprojekte in Slowenien und beinhaltet den Bau von acht Tunneln mit einer Gesamtlänge von rund 20,5 km. Für den Tunnel T8, der von Koper nach Norden führt, liefert DSI Underground sämtliche Stützmittel. (Foto: DSI Underground)

x
Geomechanics and Tunnelling: Table of contents Volume 14 (2021)Geomechanics and Tunnelling1/2022Jahresinhaltsverzeichnis

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 1/2022Geomechanics and Tunnelling1/2022Contents

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 6/2021Geomechanics and Tunnelling6/2021Contents

Abstract

No short description available.

x
Austrian Tunnel DayGeomechanics and Tunnelling6/2021Cover Pictures

Abstract

The Borth underground salt mine with an annual production volume in the range of 2 m t of halite is amongst the largest underground mines in Central Europe. All mined halite is transported to the central hoisting shaft with belt conveyor systems. To ensure a safe and efficient operation of the main conveyor belt, precautionary support measures in geotechnically stressed areas of various stopes were necessary. For the rehabilitation measures, an innovative anchoring system was applied using 3.7 to 5.7 m long hollow bar anchors which were first anchored mechanically in a borehole, pre-stressed and then fully grouted with resin.
Das Bergwerk Borth mit einer Jahresfördermenge von rund 2 Mio. t Steinsalz ist eines der größten untertägigen Steinsalzbergwerke in Mitteleuropa. Das abgebaute Steinsalz wird über Bandanlagen zum Förderschacht transportiert. Um den sicheren Betrieb der Hauptbandanlage zu gewährleisten, mussten gebirgsmechanisch stark beanspruchte Bereiche einiger Kammern saniert werden. Für die Sanierungsmaßnahmen kam ein innovatives Ankersystem zum Einsatz, bei dem 3,7 bis 5,7 m lange Hohlstabanker zunächst kraftschlüssig in einem Bohrloch verankert, vorgespannt und anschließend vollständig mit Kunstharz vermörtelt wurden.

x
Geomechanics and Tunnelling 6/2021Geomechanics and Tunnelling6/2021Imprint

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 5/2021Geomechanics and Tunnelling5/2021Contents

Abstract

No short description available.

x
70. Geomechancis ColloquiumGeomechanics and Tunnelling5/2021Cover Pictures

Abstract

The joint venture Austrian Tunnel Consortium Stuttgart 21 is constructing the Filder Tunnel with a length of 9.4 km and the Ober- and Untertürkheim Tunnel with a length of 6 km as part of the Stuttgart 21 project. The tunnel Ober- and Untertürkheim as well as the middle sections of the Filder Tunnel, which are located in difficult ground conditions, were driven conventionally. The tunnelling work was carried out under the protection of the AT - Pipe Umbrella System. (photo: DSI Underground)
Die Arbeitsgemeinschaft Austrian Tunnel Consortium Stuttgart 21 erstellt im Rahmen des Projekts Stuttgart 21 den Fildertunnel mit einer Länge von 9,4 km sowie den Tunnel Ober- und Untertürkheim mit einer Länge von 6 km. Der Tunnel Ober- und Untertürkheim sowie die in schwierigen Baugrundverhältnissen gelegenen mittleren Streckenteile des Fildertunnels wurden konventionell aufgefahren. Die Vortriebsarbeiten erfolgten im Schutz des AT - Rohrschirmsystems. (Foto: DSI Underground)

x
Fibre reinforced tunnel linings - design and construction experienceGeomechanics and Tunnelling4/2021Cover Pictures

Abstract

The new Nikachhu hydropower station in Bhutan has an installed capacity of 118 MW and is supplied with 25.45 m3/s via a 12,144 m long, 4 m diameter head race tunnel. Extensive tunnelling works were required for the project. In addition to a diversion tunnel, two adits were built near the dam to be able to access the desilting chambers. Five additional adits had to be built for the head race tunnel, and three adits, a ventilation tunnel, and a main access tunnel were required in the powerhouse. DSI Underground supplied Mai grout-mixing pumps and DSI Hollow Bar Spiles type R32 and T76 for this tunnel project. (photo: DSI Underground)
Das neue Wasserkraftwerk Nikachhu in Bhutan hat eine Nennleistung von 118 MW und wird über einen 12, 144 m langen Druckstollen mit 4 m Durchmesser mit 25, 45 m3/s versorgt. Für das Projekt waren umfangreiche Tunnelbauarbeiten erforderlich. Neben einem Umleitungstunnel wurden zwei Stollen zu den Absetzkammern in der Nähe der Staumauer gebaut. Für den Druckstollen mussten fünf zusätzliche Stollen aufgefahren werden, und im Bereich des Maschinenhauses waren drei Querschläge, ein Lüftungsstollen und ein Zugangstunnel erforderlich. DSI Underground lieferte für dieses Tunnelprojekt das DSI Hohlstab-System, Typ R32 und T76, sowie Mai Mörtelmischpumpen. (Foto: DSI Underground)

x
Content: Geomechanics and Tunnelling 4/2021Geomechanics and Tunnelling4/2021Contents

Abstract

No short description available.

x
Logistical challenges at the construction of long tunnelsGeomechanics and Tunnelling3/2021Cover Pictures

Abstract

Ring line no.15 is one of four new metro lines of the Grand Paris Express mega-project. The construction lot T2C in the southeast of Paris with a length of approx. 7 km is a key part of the new line. It consists of a 4.7 km long tunnel between Noisy-Champs and Champigny, a 2.2 km long bypass tunnel with a maintenance station, a large-scale underground junction cavern, and intermediate access shafts. Difficult ground conditions, limited space for construction, and the requirement for minimization of settlements in an urban environment determine the ground control systems for this tunnel project. Among others, the AT - 139 pipe umbrella system with press connection and a wall thickness of 8 mm, foot piles from the DSI hollow bar system as well as GRP face anchors were used. (photo: DSI Underground)
Die Ringlinie Nr. 15 ist eine von vier neuen U-Bahnlinien für das Megaprojekt Grand Paris Express. Das Baulos T2C im Südosten von Paris mit einer Länge von ungefähr 7 km ist ein Kernstück der neuen Linie. Im Zuge der Bauarbeiten werden ein 4,7 km langer zweiröhriger Tunnel zwischen Noisy-Champs und Champigny und ein 2,2 km langer Umfahrungstunnel mit einer Wartungsstation, ein weitreichendes Kreuzungsbauwerk sowie dazugehörige Versorgungsschächte hergestellt. Schwierige Baugrundverhältnisse, begrenzte Platzverhältnisse im Bereich der Baustelle sowie hohe Anforderungen an Oberflächensetzungen bestimmen die Auswahl der Stützmittel. Zum Einsatz kamen u. a. das AT - 139 Rohrschirmsystem mit Pressverbindung und einer Wandstärke von 8 mm, Kalottenfußpfähle aus dem DSI Hohlstab-System sowie GFK-Ortsbrustanker. (Foto: DSI Underground)

x
Content: Geomechanics and Tunnelling 3/2021Geomechanics and Tunnelling3/2021Contents

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 2/2021Geomechanics and Tunnelling2/2021Contents

Abstract

No short description available.

x
Geomechanics and Tunnelling 2/2021Geomechanics and Tunnelling2/2021Imprint

Abstract

No short description available.

x
Cover Picture: Geomechanics and Tunnelling 2/2021Geomechanics and Tunnelling2/2021Cover Pictures

Abstract

From the excavation pit of the future Sydney Metro Pitt Street station, a connecting tunnel had to be constructed underneath a busy road. To secure the station box wall, the AT - Pipe Umbrella System was used, which was installed at a 19° downwards. In close cooperation with the drilling equipment specialist Robodrill, DSI Underground has developed a successful concept for the installation of the AT - Pipe Umbrella System consisting of 60 individual pipes with a length of 18 meters each. For this project, DSI Underground's proprietary squeezed connection for pipe umbrella pipes has been used as a replacement for a conventional threaded connection. (photo: DSI Underground)
Aus der Baugrube der künftigen U-Bahnstation Pitt Street der Metro Sydney heraus war ein Verbindungstunnel unterhalb einer verkehrsreichen Straße zu erstellen. In enger Zusammenarbeit mit dem Maschinenhersteller Robodrill hat DSI Underground ein erfolgreiches Konzept für den Einbau eines AT - Rohrschirms mit 60 Bohrungen zu je 18 m Einbaulänge erarbeitet, die mit einer Neigung von 19° fallend hergestellt wurden. Für dieses Projekt wurde die innovative Pressverbindung für Rohrschirmrohre als Ersatz für konventionelle Gewindeschraubverbindungen gewählt. (Foto: DSI Underground)

x
Long-term observation of geotechnical structuresGeomechanics and Tunnelling1/2021Cover Pictures

Abstract

The Pflaurenz Tunnel, which is roughly 1 km long, is being built to provide a bypass which relieves pressure on the St. Lorenzen municipality in South Tirol. Half of the tunnel (approx. 417 m) passes through loose rock and was driven by excavators. To provide advance support, the innovative AT - Pipe Umbrella System with 139 [mm] squeezed connection developed by DSI Underground was successfully used in the loose rock sections of the Pflaurenz Tunnel to quickly and safely connect the tubes when driving the tunnel. (photo DSI Underground)
Zur Entlastung der Gemeinde St. Lorenzen in Südtirol wird der ca. 1 km lange Tunnel Pflaurenz als Ortsumfahrung errichtet. Die Hälfte des Tunnels liegt im Lockergestein (ca. 417 m) und wurde im Baggervortrieb aufgefahren. Als vorauseilendes Stützmittel wurde in den Lockergesteinsabschnitten des Tunnel Pflaurenz das von DSI Underground entwickelte innovative AT - Rohrschirmsystem mit Pressverbindung zur schnellen und sicheren Verbindung der Hüllrohre bei der Auffahrung des Tunnels eingesetzt. (Foto: DSI Underground)

x
Content: Geomechanics and Tunnelling 1/2021Geomechanics and Tunnelling1/2021Contents

Abstract

No short description available.

x