Table of contents
List of Figures viii
List of Tables x
About the Authors xi
Preface xiii
Introduction 1
Chapter 1: Initial data 5
1.1 The project (design) documentation 6
1.2 The bill of quantities and the bill of activities 7
1.3 Job descriptions and specifications 7
1.4 The contract conditions set out in the bidding invitation documents 8
1.5 The report of the construction site inspection 8
Chapter 2: Outline of site management planning in the bidding stage 15
2.1 The goal 16
2.2 The explanatory note 16
2.3 Construction site layout 19
2.4 The construction time schedule 21
2.5 Cost estimation of temporary works and construction site set-up 23
Chapter 3: Outline of site management after contract signature 28
3.1 The goal 29
3.2 Initial data 29
3.3 Construction site layout 30
3.4 Construction scheduling 35
3.5 Calculation of site work quantities and estimate of costs 46
Chapter 4: Suggestions for choosing construction cranes 51
4.1 General 52
4.2 Selection and positioning of tower cranes 53
4.3 Selection and impact areas of mobile cranes 77
4.4 Cranes working near overhead power lines 91
4.5 Hoist danger area 94
4.6 Operating cranes near buildings in use 95
4.7 Restrictions on crane work 97
4.8 Working in the danger area 98
Chapter 5: Suggestions for calculating resource requirements 99
5.1 Construction site temporary roads 100
5.2 Construction site storage 105
5.3 Temporary buildings 111
5.4 Temporary water supply 115
5.5 Temporary heating supply 116
5.6 Temporary power supply 121
5.7 Construction site lighting 126
5.8 Construction site transport 127
5.9 Load take up devices 130
5.10 Construction site fencing 135
Chapter 6: On-site safety requirements 137
6.1 General basics and responsibilities 138
6.2 The duties of building contractors 141
6.3 The obligations and rights of the labourer 144
6.4 Ensuring safety on the construction site 146
Chapter 7: Requirements for work equipment 155
7.1 General requirements 156
7.2 Mobile work equipment 158
7.3 Lifting devices 160
7.4 Dangers from energy 161
7.5 The usage of work equipment 163
7.6 Usage of work equipment for temporary work at height 164
7.7 Work with flammable and explosive materials 168
Chapter 8: Work healthcare 169
8.1 Allowable physical effort 170
8.2 The usage of personal protective equipment 170
8.3 Welfare facilities and first-aid 171
Appendix: Construction site layout symbols 173
Bibliography 177
Index 178