abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_googleplussocial_linkedinsocial_pinterestsocial_twittersocial_xingsocial_youtubeuser_biguser_small

Artikeldatenbank

Filter zurücksetzen
  • Autor(en)

  • Sprache der Veröffentlichung

  • Erschienen

  • Rubrik

Zeitschriften-Selektion

  • Alle auswählenAlle abwählen
Autor(en)TitelZeitschriftAusgabeSeiteRubrik
Haselsteiner, Ronald; Ersoy, Burcu; Pamuk, ResulAspects concerning the shear strength of rockfill material in rockfill dam engineeringgeotechnik3/2017193-203Fachthemen

Kurzfassung

The stress-dependent shear strength behaviour of rockfill is frequently estimated by simple shear strength parameter. A linear shear relation between vertical and shear stresses is almost always applied. However, the actual shear strength behaviour of rockfill differs from this theoretical line. A curve is formed which indicates that strong shear strength at low stresses gradually decreases with increasing stress.
The shear strength behaviour is influenced by many aspects, such as grain size distribution, compressive strength of the original rock, saturation, stress conditions, grain shape, etc. Reliable large-scale shear tests are not usually available and a realistic non-linear shear strength function has to be estimated using analytical approaches. Only rarely are case studies available for rockfill dams under dynamic loads induced by earthquakes. However, it is assumed that typical rockfill materials will resist dynamic loads.
Das spannungsabhängende Scherfestigkeitsverhalten von Steinschüttmaterialien wird in der Praxis häufig anhand einfacher Scherfestigkeitsparameter abgeschätzt. Hierbei wird fast immer eine lineare Beziehung zwischen Vertikal- und Scherspannung verwendet. Das tatsächliche Scherfestigkeitsverhalten von Steinschüttungen weicht aber von dieser theoretischen Gerade ab. Es bildet sich eine gekrümmte Linie aus, was besagt, dass hohe Scherfestigkeiten bei geringen Spannungen graduell mit wachsenden Spannungen abnehmen.
Das Scherfestigkeitsverhalten wird hierbei von sehr vielen Aspekten, wie z. B. Kornverteilung, Druckfestigkeit des Ausgangsgesteins, Sättigung, Spannungszustand, Kornform, etc. beeinflusst. In der Praxis mangelt es nicht selten an verlässlichen Ergebnissen von Großscherversuchen und man muss mit analytischen Ansätzen eine realistische nicht-lineare Scherfestigkeitsfunktion abschätzen. Für dynamische Belastungen von Steinschüttdämmen infolge von Erdbeben gibt es nur wenige Referenzfälle, jedoch ist aus Erfahrung davon auszugehen, dass typische Steinschüttmaterialien sich gegen dynamische Lasten als widerstandsfähig erweisen.

x
Schwiteilo, Erik; Herle, IvoVergleichsstudie zur Kompressibilität und zu den Scherparametern von Ton aus Ödometer- und Rahmenscherversuchengeotechnik3/2017204-217Fachthemen

Kurzfassung

Es werden Ergebnisse von in unterschiedlichen Laboren durchgeführten Ödometer- und Rahmenscherversuchen verglichen und analysiert. Um ein möglichst homogenes Material zu erhalten, wurden die Proben aus einem tonigen Boden aufbereitet und vorkonsolidiert. Die Handhabung des Probenmaterials und die Durchführung der Versuche wurde jedem teilnehmenden Labor in einer detaillierten Beschreibung der einzelnen Versuchsschritte mitgeteilt. Die aus den Laborergebnissen hergeleiteten Bodenkennwerte streuen in einem relativ breiten Bereich. Die Analyse der Ergebnisse hat gezeigt, dass ein großer Teil der Streuung auf die Versuchsbedingungen zurückzuführen ist.

Comparative study on the compressibility and shear parameters of clay from oedometer and direct-shear tests.
Results of oedometer and direct shear tests, which were performed in several laboratories, are compared and analysed. In order to obtain homogeneous and reproducible samples, a clayey soil was remolded and pre-consolidated. The handling of the soil specimens and detailed testing procedures were described and communicated to each participating laboratory. The evaluated soil properties scatter in a relatively wide range. The analysis of the results shows that a large part of the scatter originates from the testing conditions.

x
DGGT-Mitteilungen: geotechnik 3/2017geotechnik3/2017219-221DGGT-Mitteilungen

Kurzfassung

35. Baugrundtagung 2018 in Stuttgart
36. Baugrundtagung 2020 in Hamburg
ISRM International Society for Rock Mechanics
IAEG International Association for Engineering Geology and the Environment
IGS International Geosynthetics Society
Aus der DGGT-Nachwuchsförderung - “Praxistag der Geotechnik” in der Geoerlebniswelt GEORADO

x
CBTR-Nachrichten: geotechnik 3/2017geotechnik3/2017221-222CBTR-Nachrichten

Kurzfassung

CBTR-Jubiläumstagung 2017 in Mainz
Festakt zur Verleihung des Tiefbaurechtspreises

x
Das aktuelle Urteil: geotechnik 3/2017geotechnik3/2017222-224CBTR-Nachrichten

Kurzfassung

Wer muss für Witterungsschutz sorgen?
Wer haftet für Einsturz Nachbargiebel?
Baggern und entsorgen - “gemeinsame Betriebsstätte”?
“Vertragsdurchführung geht vor Preisgewissheit”
Wer schafft an? Auftraggeber oder Baufirma?
Ist eine E-Mail “schriftlich”?

x
Tagungsberichte: geotechnik 3/2017geotechnik3/2017224-225Tagungsberichte

Kurzfassung

Schrobenhausener Tage: Von Bauen im Bestand, technischen Innovationen und Wertewandel
10. Freiberger Geotechnik Kolloquium im Rahmen des 68. Berg- und Hüttenmännischen Tages 2017

x
Firmen und Verbände: geotechnik 3/2017geotechnik3/2017225-226Firmen und Verbände

Kurzfassung

Bundesfachabteilung (BFA) Wasserbau gegründet
Keller Grundbau verstärkt Präsenz in Norddeutschland

x
Termine: geotechnik 3/2017geotechnik3/2017226-228Termine

Kurzfassung

Fachsektionstage Geotechnik - interdisziplinäres Forum
Numeric in Geotechnology 2017
ISRM 2017 - Rock mechanics for Africa
13. Hans Lorenz Symposium
27. Karlsruher Deponie- und Altlastenseminar 2017
66. Geomechanik Kolloquium 2017
15th International Conference on Computer Methods and Advances in Geomechanics
AFTES International Congress
Südbahntagung 2017
STUVA Tagung 2017
Spritzbeton-Tagung 2018
25. Darmstädter Geotechnik-Kolloquium
9. RuhrGeo Tag 2018
Geotechnik-Tag 2018
4. Felsmechanik- und Tunnelbau-Tag
11. Freiberger Geotechnik Kolloquium im Rahmen des 69. Berg- und Hüttenmännischen Tages 2018
XVI Donau-Europäische Konferenz für Geotechnik
9th NUMGE Conference on Numerical Methods in Geotechnical Engineering
11th International Conference on Geosynthetics
10th Asian Rock Mechanics Symposium (ARMS10)

x
Inhalt: Mauerwerk 3/2017Mauerwerk3/2017Inhalt

Kurzfassung

Keine Kurzfassung verfügbar.

x
Jäger, WolframMasonry - energy-efficient, strong and weather-resistant / Mauerwerk - Energieeffizient, tragfähigMauerwerk3/2017137-138Editorials

Kurzfassung

Keine Kurzfassung verfügbar.

x
Schoch, TorstenEnergy-efficient masonry buildings / Energieeffiziente Gebäude aus MauerwerkMauerwerk3/2017139-154Fachthemen

Kurzfassung

In line with the general trend to improved energy-related properties of buildings in massive construction, many massive buildings have been designed and built in recent years, which have proactively observed and also helped to determine the specification of future building standards in Europe. According to [1], the first low-energy house was built in Kassel in 1986 with an area-related energy demand for hot water and heating of only 60 kWh/(m2a). The use of massive building materials with low thermal conductivity played a similarly important role in this case to the increasing use of thermal insulation materials and new building services technology using renewable energy sources. Keeping the constructional details simple to build by tradesmen in order to avoid thermal bridging and useless building mistakes was and is still an important practical requirement. With the help of examples, the article demonstrates that monolithic construction is suitable for compliance with current energy-related requirements and how this is carried out.

x
Gunkler, Erhard; Marx, Johann Jakob; Blum, CarstenShear resistance of reinforced masonry beams with and without additional concrete or prestress / Querkrafttragfähigkeiten von bewehrten Mauerwerksbalken mit und ohne Aufbeton oder VorspannungMauerwerk3/2017155-167Fachthemen

Kurzfassung

This article investigates the transferability of the Simplified Modified Compression Field Theory (SMCFT) [2], which is known in reinforced concrete design and included in the fib Model Code for Concrete Structures 2010 (Volume 3) [1], to reinforced or prestressed masonry beams (RM beams) with or without an additional layer of concrete. The investigation for this work is the obsolete shear design concept that has been used until now for reinforced masonry under shear loading, which does not adequately reflect the actual load-bearing behaviour of significant areas of masonry. The fundamentals of the SMCFT are explained and the transferability of the theory to RM beams is examined, taking into account in particular the different material properties of masonry compared to reinforced concrete. A first approach for future application is represented by the equations presented here for the determination of the shear force capacity of RM beams. The verification is performed through a comparison of the shear resistances determined experimentally (exp.) and by calculation (calc.).

x
Bothe, Eckard; Hinze, Sirko; Schöps, PeterStructural calculation of existing masonry arch bridges / Nachrechnung gemauerter BogenbrückenMauerwerk3/2017168-178Fachthemen

Kurzfassung

For masonry bridges with small spans built before 1900, there are often no documents available since such bridges were often built from experience. Surveying is often restricted to the visible parts of the structure. Geometrical assistance in the form of drilling cores is only ever at points, which inevitably have to be interpolated. Large parts of these structures are in the ground (abutments, foundations) and are largely inaccessible for adequate geometrical recording. The constitutive laws for the existing masonry can only be described with reasonable effort through minimum values from regulations. The article describes a procedure with additions to the missing documents from experience to obtain statements about the load-bearing capacity based on approximate models, which permit categorisation into decisive bridge classes based on the regulations for the structural analysis of existing road bridges and also enable usable results for the comparison between the result of categorisation and special load cases for heavy transport.

x
Professional training courses on the subject of nearly zero energy buildings / Weiterbildungsmaßnahmen zum Thema NiedrigstenergiegebäudeMauerwerk3/2017178Firmen und Verbände

Kurzfassung

Keine Kurzfassung verfügbar.

x
Dunjic, Viktor; Kolbitsch, AndreasShear resistance verification of late 19th century masonry according to EC 6 - State of the art / Nachweis der Schubtragfähigkeit von gründerzeitlichem Mauerwerk nach EC 6 - State of the ArtMauerwerk3/2017179-187Fachthemen

Kurzfassung

A large part of buildings in Central European cities like Vienna was built in the Gründerzeit period between about 1840 and 1918 [1]. These buildings were constructed according to traditional rules. Current urban development requires historic buildings to be structurally adapted, which requires retroactive analysis of the masonry walls; in Austria according to ÖNORM EN 1998-3 [2] and ÖNORM EN 1996-3 (EC 6) [3]. Here, special focus is on the load transfer of horizontal earthquake loads, i. e. the shear strength of masonry walls.
This paper describes the verification of historic masonry in detail and discusses individual components. Initial shear strength, load-influenced friction and the length of the compressed part of the wall are first determined using results from experimental testing and relevant literature and then compared to the approaches in EC 6. Based on this analysis, recommendations are provided to make theoretical approaches more realistic.

x
10th Australasian Masonry Conference Masonry today and tomorrowMauerwerk3/2017187Termine

Kurzfassung

Keine Kurzfassung verfügbar.

x
Braun, JörgInvestigations into the improvement of the weather protection of unburnt brick masonry, part 2 / Untersuchungen zur Verbesserung des Witterungsschutzes von Lehmmauerwerk, Teil 2Mauerwerk3/2017188-203Fachthemen

Kurzfassung

In June 2006, the Chair of Structural Design at the Technical University of Dresden was commissioned by the Iranian cultural authority ICHHTO and the UNESCO to perform structural design services for the earthquake-resistant repair and rebuilding of the Sistani House in the historic citadel Arg-e-Bam in the south of Iran. The citadel was until its almost complete destruction by an earthquake on 26 Dezember 2003 the largest building of unburnt brick masonry in the world and is listed as a World heritage Site by UNESCO because of its cultural and historical significance. Surveying and documentation work, archaeological rubble clearance and the rebuilding of the Sistani House after its destruction by the earthquake have taken the team from the department to Bam at regular intervals since 2006. In the course of the work, it became apparent that research was needed in the field of the repair of earthquake-damaged unburnt brick masonry and into the improvement of the shear strength/earthquake resistance and the weather protection of unburnt brick masonry.
The article is subdivided in Part 1, Introduction, test performance and assessment of results for additives to loam render [14] as well as Part 2, Assessment of the results for surface treatment to unburnt bricks and the climatic chamber tests.

x
A house with sweeping lines / Ein Haus mit SchwungMauerwerk3/2017204-205Wettbewerbe

Kurzfassung

Keine Kurzfassung verfügbar.

x
10th Academic Masonry Day / 10. Akademischer MauerwerkstagMauerwerk3/2017205-206Veranstaltungen

Kurzfassung

Keine Kurzfassung verfügbar.

x
Titelbild: Stahlbau 3/2017Stahlbau3/2017Titelbild

Kurzfassung

Sowohl Stahl-, Metall- und Komplettbauer planen und steuern komplexe Aufträge, die mit erheblichen Investitionen einhergehen. Mit ams.erp STEEL erhalten Einzel, Auftrags- und Variantenfertiger ein durchgängiges Informationssystem, das sie zu allen kaufmännischen und technischen Fragen ihrer Projekte verlässlich in Echtzeit beauskunftet. Querschnittsfunktionen wie DSTV-Standards, Dokumentenmanagement, Zeitwirtschaft und Finanzbuchhaltung machen die Lösung zu einem Projektmanagement-ERP, mit dem sich Stahl-, Metall- und Komplettbauer durchgängig organisieren. Für zusätzliche Effizienz auf der technischen Seite sorgt ams.mobile und insbesondere auf Anwenderseite die Branchenexpertise des ams-Teams. (Foto: ams.Solution)

x
Vorschau 4/2017Stahlbau3/2017Vorschau

Kurzfassung

Natalie Stranghöner, Dominik Jungbluth, Nariman Afzali, Christoph Lorenz: Einblick in das Vorspannverhalten von geschraubten Verbindungen aus nichtrostendem Stahl
J. Michael Rotter: Shell buckling transformed: Mechanics, design processes and their inter-relation
Peter Knödel, Thomas Ummenhofer: Regeln für die Berechnung von Behältern mit der FEM
Kirsi Hautala, Matti-Esko Järvenpää, Pekka Pulkkinen: Digitalization transforms the construction sector throughout asset's life-cycle from planning and design to operation and maintenance
Thomas Winterstetter, Agatha Toth, Werner Sobek, Konrad Graser, Marco Baur: National Museum of Qatar - Stahlbau, Gebäudehülle und 3D BIM in höchster Komplexität
Holger Lange, Christian Elberg: Entwicklung von weichen Türmen für Windenergieanlagen - Softtower
Jörg Uhlemann, Natalie Stranghöner: Steifigkeitskennwerte von Gewebemembranen

x
Inhalt: Stahlbau 3/2017Stahlbau3/2017Inhalt

Kurzfassung

Keine Kurzfassung verfügbar.

x
Bernert, Dietmar; Hauke, BernhardDer Deutsche Stahlbau ist am vorderen Ende der DigitalisierungsketteStahlbau3/2017201Editorials

Kurzfassung

Keine Kurzfassung verfügbar.

x
Peter, Boris; Oppe, MatthiasDie Digitalisierung im Bauwesen ist eine Chance - Über Prozessketten und notwendige ParadigmenwechselStahlbau3/2017202-207Fachthemen

Kurzfassung

Durch die Digitalisierung verändern sich unser Leben, unsere Gesellschaft und ganze Wirtschaftszweige. Sogenannte Disruptoren wie Apple, Google, Uber und viele andere führen in kürzester Zeit zu einer Neuordnung einer Branche. Beispiele für disruptive Technologien sind unter anderem die Digitalkamera, das Smartphone, das Elektroauto und eben auch das CAD (Computer Aided Design), das in den 90er Jahren die technische Handzeichnung mit Tuschestift und Zeichenbrett innerhalb kürzester Zeit ersetzte (Bild 1).
Digitaler Prozesswandel, das parametrische Entwerfen und der Einsatz von BIM als Planungsmethode führen vermehrt auch im Bauwesen zu grundlegenden Veränderungen in den Planungsprozessen und Planungsschnittstellen. Sie ermöglichen die Planung, Berechnung und Umsetzung deutlich komplexerer Bauwerke, führen zu durchgängigen Prozessketten zwischen Planung, Ausführung und Nutzung, und ermöglichen die koordinierte Bündelung aller Bauwerksinformationen in einer Projektdatenbank. Durch die Veränderung unserer Prozesse hin zu einer teamorientierten Planungsmethode lassen sich Paradigmen aufbrechen und Fehlentwicklungen korrigieren. “Aber dafür müssen wir heraus aus der Deckung, selbst ausprobieren und mitreden [1]”.

The digitization in the building industry is a chance - about process chains and necessary changes of paradigm.
The digitization changes our lives, our society, and all sectors of the economy. So-called disruptors, such as Apple, Google, Uber, and many others lead to a reorganization of an industry in a very short time. Examples of disruptive technologies are among other things the digital camera, the smartphone, the electric car and also the CAD (computer aided design), which has replaced within a very short time the technical drawing with ink pen and drawing board in the 90s (Fig. 1).
Digital process change, parametric design and the use of BIM planning method lead increasingly also in the construction industry to basic changes in the planning process and planning interfaces. It enables the planning, calculation and implementation significantly more complex structures, lead to continuous process chains between planning, execution, and use and enable coordinated bundling of all building information in a project database. By changing our processes towards a team-oriented planning method paradigms can be changed and mistakes can be corrected. “But therefore we must leave the defense, must try out the possibilities and talk together [1]”.

x
Münzner, Hinrich; Schmidt, IngoDigitales Planen und Bauen - Vorteile im Stahlbau - Anwendungsbeispiele nach der BIM-MethodeStahlbau3/2017208-216Fachthemen

Kurzfassung

Die Planung, Fertigung und Montage in Stahlbauunternehmen ist von der modernen IT-Infrastruktur geprägt und bildet eine hochintegrierte Einheit. Die Anbindung an den gesamtheitlichen Lebenszyklus des Gebäudes ist im herkömmlichen, nach Leistungsphasen gegliederten Planungsablauf, nur begrenzt möglich. Mit Einführung der BIM-Methode hat der Stahlbau die Chance, sich in die Prozesskette einzubinden und die vielfältigen vorhandenen Erfahrungen in der digitalen Planung und Fertigung auf die gesamte Prozesskette auszuweiten.

Digital planning and production - benefit for steel construction contractors.
Design and construction of steel structures is a highly integrated process, using modern IT infrastructure throughout the process. However, the participation in the life cycle of the building is limited, due to the segmented project procurement. With the implementation of the BIM Methodology, steel construction gets the chance to merge into the process, enhancing project optimization efforts and leading to a better overall project delivery.

x