abo_gift abo_online abo_print abo_student abo_test angle_left angle_right angle_right_filled arrow_big_down arrow_big_down_filled arrow_big_left arrow_big_left_filled arrow_big_right arrow_big_right_filled arrow_big_up arrow_big_up_filled arrow_dropdown_down arrow_dropdown_up arrow_small_left arrow_small_left_filled arrow_small_right arrow_small_right_filled arrow_stage_left arrow_stage_left_filled arrow_stage_right arrow_stage_right_filled caret_down caret_up close close_thin close_thin_filled contact download_thick download_thick_filled download_thin download_thin_filled ebook edit element_headline element_label element_relatedcontent lock mail minus page page_filled pages pages_filled phone plus print print_filled quotationmarks_left quotationmarks_right search send share share_filled shoppingcart_big shoppingcart_big_filled shoppingcart_header shoppingcart_small shoppingcart_small_filled social_facebook social_googleplus social_linkedin social_pinterest social_twitter social_xing social_youtube user_big user_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select all De-select all
Author(s) Title Journal Issue Page Category
Zuschrift zu: Toleranzen und Vorhaltemaß der Betondeckung beim Nachweis der Feuerwiderstandsdauer im Massivbau Beton- und Stahlbetonbau 3/2016 183-184 Zuschrift

Abstract

Zuschrift zu: UNTERBUCHBERGER, CLAUDIA; MÜLLER, ANDRÉ: Toleranzen und Vorhaltemaß der Betondeckung beim Nachweis der Feuerwiderstandsdauer im Massivbau. Beton- und Stahlbetonbau 110 (2015), Heft 10, S. 646-655.

x
Kongresse - Symposien - Seminare - Messen Beton- und Stahlbetonbau 3/2016 185-186 Veranstaltungskalender

Abstract

No short description available.

x
Content: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 Content

Abstract

No short description available.

x
News: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 172-179 News

Abstract

Tunnel boring machine at the Filder Tunnel ready for second drive / Tunnelvortriebsmaschine am Fildertunnel für zweite Schildfahrt bereit
Refurbishment of the Bruck chain of tunnels completed / Sanierung Tunnelkette Bruck abgeschlossen
Provisional result of tendering for the contract Mauls 2-3 / Vorläufiges Ergebnis der Ausschreibung Baulos Mauls 2-3
Implenia wins infrastructure project in Norway / Implenia gewinnt Infrastrukturgroßprojekt in Norwegen
Fröschnitzgraben access shafts for the Semmering Base Tunnel in operation / Zugangsschächte Fröschnitzgraben für den Semmering-Basistunnel in Betrieb
Strabag receives road and tunnel contract in Norway / Strabag erhält Straßen- und Tunnelbauauftrag in Norwegen
All three construction sections awarded at the Semmering Base Tunnel / Alle drei Baulose am Semmering-Basistunnel vergeben
Refurbishment of the Wald and Pretallerkogel Tunnels / Sanierung von Wald- und Pretallerkogeltunnel
Further underground railway contract in Cairo / Weiterer Auftrag für die U-Bahn in Kairo
TBM quartet for Norway / TBM-Quartett für Norwegen
Call for papers - Themes for the next issues of Geomechanics and Tunnelling / Themen für die nächsten Ausgaben der “Geomechanics and Tunnelling”

x
Product Information: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 276-282 Product Information

Abstract

The Klaus tunnel chain: DSI ground support products stabilize excavation of the new Eastern tubes / Die Tunnelkette Klaus: Stützmittel der DSI sichern Vortrieb der neuen Oströhren
Project-planning software for the Brenner Base Tunnel / Projektplanungssoftware für den Brenner Basistunnel

x
Diary of Events: Geomechanics and Tunnelling 3/2016 Geomechanics and Tunnelling 3/2016 285-286 Diary of Events

Abstract

No short description available.

x
Inhalt: Geotechnik 3/2016 geotechnik 3/2016 Inhalt

Abstract

No short description available.

x
DGGT-Mitteilungen: geotechnik 3/2016 geotechnik 3/2016 212-216 DGGT-Mitteilungen

Abstract

No short description available.

x
Persönliches: geotechnik 3/2016 geotechnik 3/2016 216-217 Persönliches

Abstract

• In memoriam Prof. Dr.-Ing. habil. Helmut Mei√üner
• Nachruf Dipl.-Ing. Hans-Walter Koreck

x
CBTR-Nachrichten: geotechnik 3/2016 geotechnik 3/2016 217-219 CBTR-Nachrichten

Abstract

No short description available.

x
40 Jahre Smoltcyk & Partner GmbH geotechnik 3/2016 220 Firmen und Verbände

Abstract

No short description available.

x
geotechnik-Homepage nutzt erweiterte Funktionen der Wiley Online Library geotechnik 3/2016 220-221 geotechnik aktuell

Abstract

No short description available.

x
Termine: geotechnik 3/2016 geotechnik 3/2016 221-222 Termine

Abstract

No short description available.

x
Inhalt: Mauerwerk 3/2016 Mauerwerk 3/2016 Inhalt

Abstract

No short description available.

x
Simple and efficient: Brochure for dimensioning and constructing brick masonry / Einfach und effizient: Brosch√ľre zur Bemessung und Konstruktion von Ziegelmauerwerk Mauerwerk 3/2016 212 Firmen und Verb√§nde

Abstract

No short description available.

x
The Order of Merit of the Federal Republic of Germany for Thomas L√ľtzkendorf / Bundesverdienstkreuz f√ľr Thomas L√ľtzkendorf Mauerwerk 3/2016 252-253 Pers√∂nliches

Abstract

No short description available.

x
Successful winter seminars on plastered façades without damages / Erfolgreiche Winterseminare zu schadenfreien Putzfassaden Mauerwerk 3/2016 253-254 Veranstaltungen

Abstract

No short description available.

x
Hamburg Wilhelmsburg honoured with the German Building-Owner Award 2016 / Hamburg Wilhelmsburg mit dem Deutschen Bauherrenpreis 2016 ausgezeichnet Mauerwerk 3/2016 254 Wettbewerbe

Abstract

No short description available.

x
Firmen und Verbände: Mauerwerk 3/2016 Mauerwerk 3/2016 255-256 Firmen und Verbände

Abstract

Digital planning aid for thermal and acoustic protection / Digitaler Planungshelfer zum Wärme- und Schallschutz
New strategic orientation of the Federal Association Aerated Concrete / Neue strategische Ausrichtung des Bundesverbandes Porenbeton

x
Termine: Mauerwerk 3/2016 Mauerwerk 3/2016 256 Termine

Abstract

16th IB2MAC. 16th International Brick and Block Masonry Conference “Masonry in a world of challenges”

x
Inhalt: Stahlbau 3/2016 Stahlbau 3/2016 Inhalt

Abstract

No short description available.

x
FIDIC-Seminare 2016 Stahlbau 3/2016 180 Aktuell

Abstract

No short description available.

x
The 9th International Conference on BRIDGES IN DANUBE BASIN Stahlbau 3/2016 194 Aktuell

Abstract

No short description available.

x
Die Eisenbibliothek - ein Kurzportrait Stahlbau 3/2016 228 Aktuell

Abstract

No short description available.

x
Persönliches: Stahlbau 3/2016 Stahlbau 3/2016 236 Persönliches

Abstract

Tobias Melz neuer Leiter des Fraunhofer LBF
Zum Tode von Artur Fischer

x