abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Nagy, Péter; Adam, DietmarArbeitsintegrierte Verdichtungskontrolle während der Rütteldruckverdichtunggeotechnik3/2019124-133Fachthemen

Abstract

Die Rütteldruckverdichtung ist ein Bodenverbesserungsverfahren, das bei der tief reichenden Verdichtung von grobkörnigen Böden weltweit angewendet wird. Die wesentlichen Vorteile dieser Technologie bestehen in der Vorwegnahme von Setzungen durch Bodenverdichtung und der Homogenisierung des Untergrunds. Trotz langjähriger Tradition des Verfahrens basieren heutzutage die Festlegung von Prozessparametern sowie die Kontrolle und der Nachweis des Verdichtungserfolgs in erster Linie auf Erfahrungen der ausführenden Firmen.
Im vorliegenden Beitrag wird die Möglichkeit zur arbeitsintegrierten Verdichtungskontrolle auf Basis des Bewegungsverhaltens des Tiefenrüttlers aufgezeigt und diskutiert. Die dynamische Wechselwirkung zwischen einem Tiefenrüttler und dem zu verdichtenden Boden wurde in großmaßstäblichen experimentellen Untersuchungen auf einem Versuchsfeld bei weitestgehend bekannten Untergrundverhältnissen messtechnisch erfasst und dokumentiert. Die theoretische Untersuchung des Rüttler-Boden-Interaktionssystems ermöglichte eine Quantifizierung des Verdichtungserfolgs in Form eines unmittelbar aus der Rüttlerbewegung ableitbaren Indikators. Dieser lässt eine tiefenabhängige Verdichtungskontrolle entlang der Verdichtungsstrecke zu und erteilt Informationen über die Homogenität des erzeugten Bodenkörpers im Versuchsboden, wodurch eine raumfüllende Kontrolle der Verdichtungsarbeiten gewährleistet werden kann.

Work-integrated quality control during deep vibro compaction.
Deep vibro compaction (vibroflotation) is a ground improvement method, which is used worldwide for compaction of granular soil. An appropriate compaction procedure results in a homogenous soil body and in reduced settlements. Despite the long tradition of this technique, the specification of process parameters and the control and quality assurance of the compaction works are still based on the experience of the contractors.
This paper discusses a proposal for a work-integrated compaction control, based on the motion behaviour of the compaction device. The dynamic interaction between the deep vibrator and the compacted soil was observed and recorded in large-scale experiments, with well-known ground conditions. A complementary theoretical investigation of the soil-vibrator interaction system allowed the quantification of the compaction success by a parameter, which was derived directly from the monitored vibrator movement. This parameter allowed a work-integrated compaction control covering the depth of the compacted soil. Moreover, the homogeneity of the compacted soil body could be controlled. Thus, a three-dimensional quality control of the compaction works was made possible.

x
Arbeitskreis "Fertigdach"Beton- und Stahlbetonbau8/2005719Aktuelles

Abstract

No short description available.

x
Arbeitskreis "Photovoltaik in Gebäuden"Bautechnik1/1999102Nachrichten

Abstract

No short description available.

x
Arbeitskreis "VBI International"Bautechnik5/2005334-335Nachrichten

Abstract

No short description available.

x
Arbeitskreis für vorgehängte hinterlüftete Fassaden gegründetBauphysik6/2003349Aktuelles

Abstract

No short description available.

x
Fuchs, BastianArbeitskreis Internationales Baurecht in der Deutschen Gesellschaft für Baurecht e. V.UnternehmerBrief Bauwirtschaft9/201119-20Berichte

Abstract

No Abstract.

x
Arbeitskreis Melaminharz-Schaumstoff in FSKBauphysik3/199897Aktuelles

Abstract

No short description available.

x
Arbeitskreis Schadenfreies Planen und Bauen im IngenieurbauBautechnik8/2002559Termine

Abstract

No short description available.

x
Böhm, S.Arbeitskreise des Fachverbandes Konstruktiver GlasbauStahlbau6/2006544-546Berichte

Abstract

No short description available.

x
Bergmeister, K.Arbeitsplätze und Wertewandel in der BauwirtschaftBeton- und Stahlbetonbau9/2000517Editorial

Abstract

No short description available.

x
Arbeitsrecht - Arbeitsverweigerung bei LohnrückstandUnternehmerBrief Bauwirtschaft7/20053

Abstract

No short description available.

x
Arbeitsrecht - Auslösen: Wohnwagen gilt als WohnungUnternehmerBrief Bauwirtschaft3/20071

Abstract

No short description available.

x
Arbeitsrecht - Bürgenhaftung im AEntG ist verfassungsgemäßUnternehmerBrief Bauwirtschaft5/20071

Abstract

No short description available.

x
Arbeitsrecht - Darlegungs- und Beweislast bei FortsetzungserkrankungUnternehmerBrief Bauwirtschaft12/20063

Abstract

No short description available.

x
Arbeitsrecht - Erste Urteile zum Auslandsentsendegesetz in der BauwirtschaftUnternehmerBrief Bauwirtschaft11/200614

Abstract

No short description available.

x
Arbeitsrecht - Macht Fehler bei Sozialauswahl Kündigungen unwirksam?UnternehmerBrief Bauwirtschaft1/20072

Abstract

No short description available.

x
Arbeitsrecht - Mitarbeiter mit Auslandseinsatz ohne Anspruch auf bAVUnternehmerBrief Bauwirtschaft2/20081

Abstract

No short description available.

x
Arbeitsrecht - Rückforderung vermögenswirksamer LeistungenUnternehmerBrief Bauwirtschaft7/20083

Abstract

Will ein Arbeitgeber über das Ende des Arbeitsverhältnisses hinaus irrtümlich gewährte vermögenswirksame Leistungen vom Arbeitnehmer zurückfordern, muss er vor dem Arbeitsgericht klagen.

x
Arbeitsrecht - Urteil zur Nachwirkung und -bindung von TarifverträgenUnternehmerBrief Bauwirtschaft8/20052

Abstract

No short description available.

x
Arbeitsschutz und Arbeitssicherheit auf BaustellenUnternehmerBrief Bauwirtschaft5/201620Buchtipps

Abstract

No short description available.

x
Arbeitstabellen aktualisiertBautechnik7/1998499Nachrichten

Abstract

No short description available.

x
Arbeitstagung der Bundesvereinigung der PrüfingenieureBeton- und Stahlbetonbau8/2004695Tagungen

Abstract

No short description available.

x
Arbeitstagung der Bundesvereinigung der Prüfingenieure für BautechnikStahlbau8/2004644Termine

Abstract

No short description available.

x
Arbeitsvorbereitung im Ingenieurhochbau (Spranz, D.)Bautechnik5/2004404Bücher

Abstract

No short description available.

x
Herkommer, F.Arbeitszeitrichtwerte mit geschweissten Betonstahlmatten und Stahlersparnis.Bautechnik10/1977350-353

Abstract

Die wirtschaftlichen Vorteile von Listenmatten und Lagermatten im Stahlbetonbau.

x