abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Langlie, C.; Wels, W.Studie zur Instandsetzung der Kaiserin-Auguste-Viktoria-Kirche auf dem Ölberg in Jerusalem.Bautechnik2/199137-40

Abstract

Die Kaiserin-Auguste-Viktoria-Kirche in Jerusalem wurde im Jahre 1910 fertiggestellt und im Jahr 1927 durch ein Erdbeben stark beschädigt. Verbesserung der Horizontalaussteifung der beschädigten Mauerwerksbogenkonstruktion durch eine Massivdecke und teilweise Aufhängung der Mauerwerkskonstruktion an die Massivdecke mit Hilfe von mit epoxidharzverpressten Zugankern.

x
Keßler, Sylvia; Gehlen, ChristophStudie zur Potentialfeldmessung an 40 Jahre alten Stahlbetonbauteilen vom Olympiastadion MĂŒnchen - Einfluss des Elektrolytwiderstands und des MessrastersBeton- und Stahlbetonbau9/2013620-629Fachthemen

Abstract

Die Detektion von korrodierenden Bereichen in Stahlbetonbauwerken ist ein wesentlicher Schritt für die Zustandserfassung und die Planung von Instandsetzungsmaßnamen. Als etabliertes Messverfahren steht dafür die Potentialfeldmessung zur Verfügung. Obwohl dieses Verfahren schon seit Jahren eingesetzt wird und in verschiedenen Richtlinien und Merkblättern Eingang gefunden hat, gibt es immer noch offene Fragen zur Oberflächenvorbehandlung, zum geeigneten Messzeitpunkt bei frei bewitterten Bauteilen und zum optimalen Messraster. Diese Fragen werden anhand von Labormessungen und praxisnahen Feldmessungen qualitativ untersucht. Für die praxisnahen Feldmessungen wurden Potentialfelder an 40 Jahre alten, natürlich korrodierten Stahlbetonrandbalken vom Olympiastadion in München bei unterschiedlichen Oberflächenvorbehandlungen, nach verschiedenen Wetterszenarien und Messrastervariationen ausgewertet.

Study of potential mapping at 40 year old reinforced elements from the Olympic stadium in Munich - Influence of concrete resistivity and grid size
An essential part of the inspection and repair planning of reinforced concrete structures is the detection of corroding areas. Potential mapping is a widely used and established procedure to do this. But there are still some open questions concerning this measurement procedure. Which is the proper pre-wetting condition or which is the best time to measure when the structural element is exposed to weather conditions? Which is the optimal grid size? Investigations are made with a laboratory and practical test set up. For the practical test set up 40 year old, naturally corroded reinforced segments from the Olympic stadium in Munich are available and potential measurements under different condition were analyzed qualitatively.

x
StudiegÀnge Master of Science und Zertifikat "Wasser und Umwelt"Bautechnik2/2004151Firmen und VerbÀnde

Abstract

No short description available.

x
Ohlemutz, A.Studien fĂŒr die Instandsetzung der Williamsburg-HĂ€ngebrĂŒcke ĂŒber den East-River in New York City.Stahlbau11/1985344-345Berichte

Abstract

No short description available.

x
Studiengang "Bau-Management"Bautechnik11/2001833Nachrichten

Abstract

No short description available.

x
Studiengang "Facility Management" akkreditiertBautechnik5/2007358Nachrichten

Abstract

No short description available.

x
Studiengang Angewandte InformatikBautechnik8/1998603Nachrichten

Abstract

No short description available.

x
Studiengang Industrie-Betriebswirt der Fachrichtung BauwirtschaftBautechnik9/2003670Termine

Abstract

No short description available.

x
Studiengang Stahl- und Metallbau in Roßwein gesichertStahlbau6/2001397Ausbildung

Abstract

No short description available.

x
StudiengebĂŒhren als Steuervorteil?UnternehmerBrief Bauwirtschaft6/201217Berichte

Abstract

No Abstract.

x
StudiengÀnge "Wasser und Umwelt"Bautechnik2/2006156Nachrichten

Abstract

No short description available.

x
StudiengÀnge "Wasser und Umwelt"Bautechnik1/200556Nachrichten

Abstract

No short description available.

x
StudiengÀnge "Wasser und Umwelt"Bautechnik2/2007152-153Nachrichten

Abstract

No short description available.

x
StudiengÀnge "Wasser und Umwelt"Bautechnik8/2006577Nachrichten

Abstract

No short description available.

x
StudiengÀnge "Wasser und Umwelt"Bautechnik7/2004599Nachrichten

Abstract

No short description available.

x
StudiengÀnge "Wasser und Umwelt" 2007/2008Bautechnik8/2007602-603Nachrichten

Abstract

No short description available.

x
StudiengÀnge "Wasser und Umwelt" im Wintersemester 2005/2006Bautechnik7/2005472Nachrichten

Abstract

No short description available.

x
StudiengÀnge Master of Science und Zertifikat "Wasser und Umwelt"Bautechnik8/2002559Termine

Abstract

No short description available.

x
StudiengÀnge Wasser und UmweltBautechnik8/2000605Nachrichten

Abstract

No short description available.

x
StudiengÀnge »Wasser und Umwelt« an der Bauhaus-UniversitÀt WeimarBautechnik7/2013409Aus den Hochschulen

Abstract

No short description available.

x
Rekow, D.Studienreformprojekt "Projekt und Praxis" an der Technischen UniversitÀt Berlin - Innovationen in der universitÀren LehreBautechnik8/2003553-555Berichte

Abstract

No short description available.

x
Studienrichtung GebÀudetechnik und Bauphysik an der FH CoburgBauphysik4/2003250Aktuelles

Abstract

No short description available.

x
Studienrichtung GebÀudetechnik und Bauphysik an der FH CoburgBauphysik3/2003145Aktuelles

Abstract

No short description available.

x
SchĂŒtz, Holger; Konietzky, HeinzStudies of flooding induced by seismicity in the Schlema-Alberoda uranium mine / Untersuchungen zur flutungsinduzierten SeismizitĂ€t im Uranerzbergwerk Schlema-AlberodaGeomechanics and Tunnelling5/2016508-514Topics

Abstract

The uranium mine in Schlema-Alberoda near the town Aue in south-east Germany was operated between 1947 and 1990. In 1979, a seismic event with local magnitude of ML = 2.9 and intensity MSK = 5 (Medvedev-Sponheuer-Karnik scale) was monitored close to the mining area. Due to this event and observations of underground dynamic de-stressing, a local seismic network was installed and extended in the following years. Seismic events were routinely located and source parameters for selected events were determined [1], [2]. It was found that most of the sources of dynamic events are located outside the mine, in the neighbouring granitic intrusion. During the period of active mining, continuous online evaluation of seismic events was performed in conjunction with online hazard evaluation [2].
In 1990, the controlled flooding of the mine was started. A total excavated volume of 35 m. m3 had to be flooded. The flooding was completed in 2012. The flooding process was continuously monitored with a seismic network over the whole period of 22 years. This large dataset has been used for statistical calculations, correlations between seismicity and flooding level and ground velocity predictions.
Im Bergwerk Schlema-Alberoda, in der Nähe der Stadt Aue im Südosten Deutschlands, wurde von 1947 bis 1990 Uranerz im Firststoßbau-Verfahren abgebaut. Im Jahr 1979 wurde in der Nähe des Bergwerks ein seismisches Ereignis mit einer Lokalmagnitude von ML = 2,9 und einer Intensität von I = 5 nach der Medwedew-Sponheuer-Karnik-Skala aufgezeichnet. Dieses Ereignis, verbunden mit beobachteten Spannungsumlagerungen, führte zur Entscheidung, ein lokales seismologisches Online-Überwachungsnetz zu installieren und in den folgenden Jahren auszubauen. Die Lokalisierung und Magnitudenbestimmung wurde seitdem routinemäßig durchgeführt, und für ausgewählte Ereignisse konnten Herdparameter bestimmt werden [1, 2]. Weiterhin wurde während der Zeit des aktiven Bergbaus eine Online-Gefährdungsbeurteilung durchgeführt [2]. Die Beobachtungen zeigten, dass sich ein Großteil der Hypozentren nicht im Bergwerk selbst befinden, sondern in der darunter liegenden Granitintrusion. Nach der Einstellung der Bergbauarbeiten wurde im Jahr 1990 die kontrollierte Flutung eingeleitet, die im Jahr 2012 abgeschlossen war. Insgesamt wurden 35 Mio. m3 Hohlraum geflutet. Während des gesamten Zeitraums wurde die Flutung kontinuierlich mit dem seismologischen Netz überwacht. Dieser umfangreiche Datensatz wurde für statistische Berechnungen, Korrelationen zwischen Seismizität und Flutung und zur Abschätzung von Bodenschwinggeschwindigkeiten verwendet.

x
Hanswille, G.; Porsch, M.; Ustundag, C.Studies of the lifetime of cyclically loaded steel-concrete composite bridgesSteel Construction3/2010140-147Articles

Abstract

In current German and international standards for composite structures of steel and concrete, the determination of the ultimate load capacity and the fatigue life of headed shear studs is carried out with separate and independent verifications at the ultimate, serviceability and fatigue limit states. The fatigue resistance is verified in a similar way to steel structures, based on a nominal stresses concept and linear damage accumulation according to Palmgren-Miner. The effect of pre-damage due to fatigue loading at both the ultimate and serviceability limit states is not considered. Because cyclic loading of headed shear studs leads to a decrease in the static strength of stud connectors, the assumptions for independent limit states are not given and the reliability index of steel-concrete composite structures subjected to fatigue loading may fall below the target values in codes. This paper deals with the results of a comprehensive programme of experimental work with more than 90 standard EC4 push-out test specimens and two full-scale beam tests which consider the crack propagation through the stud foot and the local damage to the concrete surrounding the studs as relevant consequences of highcycle loading. Based on the results of the push-out tests, new design methods were developed to predict the fatigue life and the residual strength of headed shear studs after high-cycle loading. Considering the interaction between the local damage and the behaviour of the global structure, these research results were taken as the basis for simulating the cyclic behaviour of composite beams by means of a damage accumulation method.

x