abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Groß, Thomas; Cattelaens, JörgDer Dükerbau in der offenen Bauweise am Beispiel Rheindüker Zeelink zwischen Wallach und OrkBautechnik8/2021601-606Berichte

Abstract

Es wird über die Verlegung in offener Dükerbauweise gegenüber anderen Methoden des Dükerbaus berichtet. Die technischen Möglichkeiten und Vorteile gegenüber grabenlosen Verfahren werden erläutert. Als Beispiel hierzu dient der Bau des Dükers durch den Rhein zwischen den Orten Wallach und Ork im Rahmen der Zeelink-Leitung.

The culvert construction in the open construction: using the example rhine culvert Zeelink between the places Wallach and Ork
It is reported on the laying in open culvert construction compared to other methods of culvert construction. The technical possibilities and advantages over trenchless processes are explained. An example of this is the construction of the culvert through the Rhine between the villages of Wallach.

x
Kongresse - Symposien - Seminare - MessenBautechnik8/2020601-602Veranstaltungskalender

Abstract

No short description available.

x
Walter, Bernd; Englert, Rüdiger; Piewak, SebastianErsatzneubau Hochwassersperrtor LadenburgBautechnik8/2019601-608Berichte

Abstract

Das 1931 in Betrieb gegangene Hochwassersperrtor Ladenburg wird durch einen Neubau ersetzt. Es wird ab einem Hochwasser mit einem Wiederkehrintervall von zwei Jahren geschlossen und schützt damit die sich entlang des Seitenkanals befindlichen Industrie- und Wohngebiete vor Überflutung.
Bei der Planung und Umsetzung der Maßnahme sind insbesondere die Sicherstellung der ganzjährigen Einsatzbereitschaft der bestehenden Anlage und auch die Minimierung der Einschränkungen der Schifffahrt während der Bauzeit zu berücksichtigen. Der Bauablauf sieht vor, die Gesamtmaßnahme mit wenigen Wochenend- und Nachtsperrpausen zu realisieren.
Der Ersatzneubau erfolgt im Unterwasser des alten Sperrtors. Damit befindet sich die Baumaßnahme in dessen Schutze und das Baufeld ist dadurch während der Bauzeit weitestgehend hochwassersicher. Es wird als Drucksegmenttor mit zweiseitigem hydraulischem Antrieb erstellt.
Bei der Umsetzung der Maßnahme ist dem Standardisierungsgedanken Rechnung zu tragen.

Construction of the new flood barrage Ladenburg
A new flood barrage construction will replace the old construction, put into use in 1931. For the protection of the industrial and residual areas nearby the artificial canal will be closed if a flooding situation with a return period of two years occurs.
During planning and implementation of the new construction, it was important to ensure the operational readiness of the existing flood barrage and also to minimize the restrictions on shipping during the construction period.
As the construction of the new barrage will take place mainly at nights and on weekends only some closures for ships will be necessary, therefore ensuring full operational capability. Furthermore, by constructing the replacement of the old flood barrage below its current state, the project is protected by the old construction and therefore largely flood-safe.
The design is a radial gate with two-sided hydraulic drive. While implementing the measure the idea of standardization has to be taken into account.

x
Kongresse - Symposien - Seminare - MessenBautechnik8/2017601-602Veranstaltungskalender

Abstract

No short description available.

x
Stellungnahme und Kommentar des Arbeitskreises Normung der Bayerischen Ingenieurekammer-BauBautechnik10/2009601-602Fachthemen

Abstract

No short description available.

x
Rolf Katzenbach Direktor des TU Darmstadt Energy CenterBautechnik8/2007601-602Nachrichten

Abstract

No short description available.

x
Rekordzahl von Vorträgen für IABSE Symposium in WeimarBautechnik8/2007601Nachrichten

Abstract

No short description available.

x
Bohrpfähle, Ausführung von besonderen geotechnischen Arbeiten, Kommentar zur DIN EN 1536 mit CD-ROM (Linder, W.-R., Siebke, H.)Bautechnik7/2004601-602Bücher

Abstract

No short description available.

x
Plunkett Awards 2002Bautechnik8/2001601-602Nachrichten

Abstract

No short description available.

x
Europäischer Kalksandstein-Architekturpreis 2001Bautechnik8/2001601Nachrichten

Abstract

No short description available.

x
25. Aachener Baustofftag: Neue Korrosionsschutzverfahren für StahlbetonbauwerkeBautechnik8/2001601Termine

Abstract

No short description available.

x
Braunschweiger Bauseminar 2001: Bauen im Wandel der ZeitBautechnik8/2001601Termine

Abstract

No short description available.

x
DREDGING SEEN Perspectives - From The Outside Looking InBautechnik8/2001601Termine

Abstract

No short description available.

x
Flugasche im Beton - Neue WegeBautechnik8/2001601Termine

Abstract

No short description available.

x
Ausbildung zum Beschichtungsinspektor (Paint-Inspector)Bautechnik8/2001601Termine

Abstract

No short description available.

x
Utilization of High Strengh/High Performance ConcreteBautechnik8/2001601Termine

Abstract

No short description available.

x
Moderne Methoden und Konzepte im WasserbauBautechnik8/2001601Termine

Abstract

No short description available.

x
Technische Akademie WuppertalBautechnik8/2001601Termine

Abstract

No short description available.

x
Messe NordBauBautechnik8/2001601Termine

Abstract

No short description available.

x
Brandschutz-SeminareBautechnik8/2000601Termine

Abstract

No short description available.

x
Management CircleBautechnik8/2000601Termine

Abstract

No short description available.

x
DIN-SeminareBautechnik8/2000601Termine

Abstract

No short description available.

x
Brandschutzgerechte WohnungslüftungBautechnik8/1998601Termine

Abstract

No short description available.

x
Innovation Betriebs-und RegenwassernutzungBautechnik8/1998601Termine

Abstract

No short description available.

x
Kostengünstiger Wohnungsbau mit StahlBautechnik8/1998601Termine

Abstract

No short description available.

x