abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtube social_twitter user_biguser_small
  • Ernst & Sohn

Latest news

Ernst & Sohn makes 10 engineers happy
25. March 2014

Ernst & Sohn makes 10 engineers happy

As part of the Bridge Building Symposium, a competition was held on the Ernst & Sohn / Structruae stand to win a reference book. Only one question had to be answered. How high is the Space Needle in Seattle?

The preparatory works for the new Semmering Base Tunnel
25. February 2014

The preparatory works for the new Semmering Base Tunnel

Extensive preparatory works for the new Semmering Base Tunnel (SBTn) project have been underway in Styria since March 2012 and in Niederösterreich since April 2012, in numerous construction sections and contracts. In the Gloggnitz construction section (PGG) on contract PGG1, one of six contracts in Gloggnitz, the works included two rail bridges, two trough structures, one road bridge, various flood protection works, a landfill for excavated spoil and three lifts at Gloggnitz station.

Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia
25. February 2014

Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia

The automated people mover (APM) bridge project constructed at Princess Nora University (PNU) in Saudi Arabia and inaugurated in May 2012 is a major project with many challenges in design and construction due to its strict time-frame compared with the big scale of the project.

Orthotropic steel bridges in Germany
25. February 2014

Orthotropic steel bridges in Germany

This document describes the development and state of the art of orthotropic steel bridges in Germany. Following a short historical review of the performance of orthotropic bridge decks over the last decades, the present traffic loads are described and related to the resistance of the existing structures. Based on four different hazard categories, this paper describes different retrofitting methods. Although several promising strengthening techniques are introduced and evaluated, it appears that further research is urgently required in order to improve these techniques

Ernst & Sohn Wall Calender 2014 -SALES!
20. February 2014

Ernst & Sohn Wall Calender 2014 -SALES!

Get one of the remaining copies for only 10,- Euro!

 

The Ernst & Sohn wall calendar for your office.
A Statement for your profession!

Order free sample copy
30. January 2014

Order free sample copy

I would like to order a free sample copy of Ernst & Sohn specialist journals.

Journals provide support for a successful degree
16. January 2014

Journals provide support for a successful degree

Ernst & Sohn magazines support students during their course and also afterwards. Available at a special price for students, request a sample issue to investigate. Naturally free.

SBTn basic surveying for tunnelling
05. December 2013

SBTn basic surveying for tunnelling

Major tunnel projects like the new Semmering Base Tunnel require intensive design work long before construction can start.

Fatigue strength of high-strength steel linings with different types of grouting opening
05. December 2013

Fatigue strength of high-strength steel linings with different types of grouting opening

Owing to the increased use of high-strength steel (HSS) grades for steel linings in pressure shafts, the fatigue check becomes more and more critical for the proper design of such components.

Ioannis Vayas reaches 60
04. December 2013

Ioannis Vayas reaches 60

Prof. Dr.-Ing Dr. h.c. Ioannis Vayas, professor for steel structures at the National Technical University of Athens, Greece, celebrated his 60th birthday on 26 October 2013.

Order free sample of copy

Order free sample of copy

 Specialist journals about building and civil engineering topics.
Print and online available, as a subscription or as an individual article download.
Order your free sample copy of: