abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Artikeldatenbank

Filter zurücksetzen
  • Autor(en)

  • Sprache der Veröffentlichung

  • Erschienen

  • Rubrik

Zeitschriften-Selektion

  • Alle auswählenAlle abwählen
Autor(en)TitelZeitschriftAusgabeSeiteRubrik
Horváth, AdriánThe Pentele Danube-bridge in Dunaújváros, Hungary Design, Research and ConstructionSteel Construction3/2011150-160Articles

Kurzfassung

The main part of the bridge is a basket handle type tied-arch bridge. The geometrical size, structural solutions and erection method of the bridge required preliminary research and advanced design methodology. This paper gives a general outline about the construction of the steel structure of the arch bridge and emphasizes some of the design aspects.

x
Bakeer, TammamThe performance of masonry buildings under wind loads  -  The influence of the global effect on component responseMauerwerk2/201188-97Fachthemen

Kurzfassung

The following contribution focuses on the global behaviour of masonry structures subjected to wind loads. It describes the interaction between the structural elements and their influences on the global behaviour. Numerical models based on discrete / finite element approach of different scales have been built for a typical terraced house masonry building.
The models have been used to investigate the contribution of each shear wall to the overall capacity of the structure, and to determine the portion of each from vertical/horizontal loads. The results give an insight into the interaction between the deformation of the slab and the rocking of the shear walls. The different performances between the model with rigid foundation and the model with elastic foundation have been compared.
Models for strips of the building have been built with an intention to deal with in-plane behaviour separated from the influences of load distribution. A comparison of the results of the strip model with the results of the global model shows, that the strip model results are in safe side.

Das Verhalten von Mauerwerk unter Windlasten  -  Der Einfluss der Gesamteinwirkung auf die Reaktion einzelner Bauteile.
Der folgende Beitrag konzentriert sich auf das globale Verhalten von Mauerwerksbauten unter Windlasten. Er beschreibt die Wechselwirkungen zwischen den einzelnen Strukturelementen und deren Einflüsse auf das Gesamtverhalten. Es sind numerische Modelle für ein typisches Reihenhaus aus Mauerwerk, die auf dem Diskrete-/ Finite-Elemente-Ansatz basieren, in unterschiedlichen Maßstäben erstellt worden.
Die Modelle dienten der Untersuchung des Beitrages jeder einzelnen Wandscheibe zur Gesamtwiderstandsfähigkeit des Bauwerks sowie ihres Anteils an der Ableitung der vertikalen und horizontalen Belastungen. Die Ergebnisse geben einen Einblick in die Wechselwirkung zwischen der Verformung der Deckenplatte und dem Kippen der Wandscheiben. Es wurde das unterschiedliche Verhalten eines Modells mit starrem Fundament und eines Modells mit elastischer Gründung verglichen.
Verschiedene Streifenmodelle des Gebäudes dienten dazu, das Schub-Verhalten getrennt von den Einflüssen der Lastverteilung beschreiben zu können. Ein Vergleich der Ergebnisse des Streifenmodells mit den Ergebnissen des Gesamtmodells zeigt, dass das Streifenmodell auf der sicheren Seite liegt.

x
Czerwonka-Schröder, Daniel; Gaisecker, ThomasThe permanent three-dimensional data acquisition of geotechnical structures by means of a web-based application of terrestrial LiDAR sensors / Die permanente dreidimensionale Datenerfassung geotechnischer Strukturen mittels webbasierter Anwendung terrestrischer LiDAR-SensorikGeomechanics and Tunnelling5/2022596-604Topics

Kurzfassung

As part of the i2MON research project, an integrated monitoring service was developed for the identification and evaluation of soil and slope movements in the context of coal mining. The focus was on the correct integration (to give reliability, accuracy and integrity) of a long-range laser scanner into a web-based monitoring system from an engineering geodetic point of view. A web-based application of terrestrial laser scanners has been developed by cooperation between DMT GmbH & Co. KG and RIEGL Laser Measurement Systems GmbH.
The system allows a high temporal and spatial resolution for measured value acquisition by means of permanent installation in the vicinity of a monitored object. This article shows how the laser scanner can be remotely controlled within a web-based monitoring platform. In addition, the integration of various sensors (including total station, GNSS, geotechnical sensors) within a project into a uniform monitoring platform based on a web interface and the corresponding data analysis (including the automatic detection of geomorphological processes) will be described.
Im Rahmen des Forschungsprojekts i2MON wurde ein integrierter Monitoring-Dienst zur Identifikation und Bewertung von Boden- und Hangbewegungen im Zusammenhang mit dem Steinkohlenabbau entwickelt. Der Fokus lag dabei auf der aus ingenieurgeodätischer Sicht korrekten Integration (Zuverlässigkeit, Genauigkeit und Integrität) eines Long Range Laserscanners in ein webbasiertes Monitoringsystem. In Zusammenarbeit zwischen der DMT GmbH & Co. KG und RIEGL Laser Measurement Systems GmbH ist eine webbasierte Anwendung terrestrischer Laser-Scanner entstanden. Das System erlaubt mittels permanenter Installation im nahen Umfeld eines Überwachungsobjekts eine hohe zeitliche und räumliche Auflösung bei der Messwerterfassung. In diesem Beitrag wird dargestellt, wie der Laserscanner innerhalb einer webbasierten Monitoring-Plattform ferngesteuert werden kann. Darüber hinaus wird die Integration verschiedenster Sensorik (u. a. Totalstation, GNSS, geotechnische Sensorik) innerhalb eines Projekts in eine einheitliche, auf einem Web-Interface basierende Überwachungsplattform und die entsprechende Datenanalyse (u. a. die automatische Erkennung geomorphologischer Prozesse) gezeigt.

x
Golger, Mario; Höfer-Öllinger, Giorgio; Prinzl, FriedrichThe Pir Panjal Railway TunnelGeomechanics and Tunnelling2/2014133-141Topics

Kurzfassung

The Pir Panjal Railway Tunnel was the first tunnel in India to be constructed in accordance with the principles of the New Austrian Tunnelling Method. Despite very heterogeneous rock conditions with frequent changes of solid and completely fractured rock, with high water inflow in places, the work progressed without prolonged excavation-related interruption and delays. This was possible because of the design and construction method, which permits prompt reaction to changing geology and installation of initial support measures, but also rapid adaptation of support measures to cope with the conditions of a young rock mass like the Himalayas. An important tool in regard to control and manage the ground deformations in the different geological conditions was the 3D monitoring of the lining displacements and its interpretation.
The tunnel was driven from numerous faces by conventional mined tunnelling methods using drill and blast as well as roadheader, with immediate installation of the primary support. The excavation and lining works were completed in late 2012, mechanical and electrical works in early 2013. Considering the difficult geology, extreme weather situation in winter and the hostile conditions of the area, the overall performance was satisfactory, although the initially scheduled target was not achieved. The tunnel has now been in operation since summer 2013.

x
Ajdukiewicz, A.The place of concrete in sustainable Civil Engineering in PolandBeton- und Stahlbetonbau7/2005633-641Berichte

Kurzfassung

Keine Kurzfassung verfügbar.

x
Müller, Jörg R.; Zettl, Nina M.; Schachinger, TobiasThe preparatory works for the new Semmering Base Tunnel / Die Vorarbeiten für den Semmering-Basistunnel neuGeomechanics and Tunnelling6/2013688-700Topics

Kurzfassung

Extensive preparatory works for the new Semmering Base Tunnel (SBTn) project have been underway in Styria since March 2012 and in Niederösterreich since April 2012, in numerous construction sections and contracts. In the Gloggnitz construction section (PGG) on contract PGG1, one of six contracts in Gloggnitz, the works included two rail bridges, two trough structures, one road bridge, various flood protection works, a landfill for excavated spoil and three lifts at Gloggnitz station. The contract also dealt with landscaping for land rehabilitation and the site facilities area. In the construction section Tunnel Fröschnitzgraben (SBT2), contracts SBT2.2 and SBT2.3 include a drinking water supply plant, the infrastructure for the site facilities area at Fröschnitzgraben, a temporary site access road from the S06 Semmering Schnellstraße, two site roads, improvement of the L117 Pfaffensattelstraße, noise protection measures and extensive preparations for the landfill site in the Longsgraben. The section with contracts SBT2.5 and SBT2.4 also made extensive felling work and planting and reforestation necessary. On contract PGG1, an extensive slope cutting was formed for the construction of the Gloggnitz Portal area, and contract SBT2.3 constructed extensive embankments as reinforced earth retaining structures. Geotechnical safety management is applied to ensure the geotechnically safe and economic implementation of these measures.
Seit März 2012 laufen auf der steirischen Seite und seit April 2012 auf der niederösterreichischen Seite bereits in mehreren Bauabschnitten bzw. Baulosen umfangreiche Vorarbeiten für das Projekt Semmering-Basistunnel neu (SBTn). Im Bauabschnitt Gloggnitz (PGG) im Baulos PGG1, einem von sechs Baulosen in Gloggnitz, werden hierbei unter anderem zwei Eisenbahnbrücken, zwei Wannenbauwerke, eine Straßenbrücke, vielfältige Hochwasserschutzmaßnahmen, eine Aushubdeponie sowie drei Liftanlagen im Bahnhof Gloggnitz errichtet. Ebenso werden im Zuge dieses Bauloses der Landschaftsbau zur Renaturierung und die Baustelleneinrichtungsflächen umgesetzt. Im Bauabschnitt Tunnel Fröschnitzgraben (SBT2) werden mit den Baulosen SBT2.2 und SBT2.3 unter anderem eine Trinkwasserversorgungsanlage, die Infrastruktur der Baustelleneinrichtungsfläche Fröschnitzgraben, eine temporäre Baustellenzufahrt von der S06 Semmering Schnellstraße, zwei Baustraßen, eine Regenerierung der L117 Pfaffensattelstraße, Lärmschutzmaßnahmen sowie umfangreiche Vorarbeiten für die Deponie im Longsgraben realisiert. Weiters sind im Bauabschnitt mit den Baulosen SBT2.5 und SBT2.4 umfangreiche Schlägerungsarbeiten sowie Bepflanzungs- und Aufforstungsarbeiten erforderlich. Im Baulos PGG1 erfolgte die Herstellung eines umfangreichen Hangeinschnitts für die Errichtung des Portalbereichs Gloggnitz, im Baulos SBT2.3 werden Dämme als Bewehrte-Erde-Stützkonstruktionen im großen Umfang errichtet. Für die geotechnisch sichere und wirtschaftliche Umsetzung dieser Maßnahmen wird ein geotechnisches Sicherheitsmanagement angewendet.

x
Sachs, M.The present status of the NATM in contracts - construction / Gegenwart der NÖT im Bauvertrag - AusführungGeomechanics and Tunnelling6/2010788-793Topics

Kurzfassung

Since the start of the worldwide success of the new Austrian tunnelling method in the middle 1960s, not only our society but also tunnelling have experienced fundamental change in many areas. The increasing influence of law and bureaucracy have led to the situation where today's tunnelling contracts have become extensive, intricate and disputed compared to former times. Collaboration as among colleagues has been replaced by the collective shedding of responsibility. The creation of tender documents, processing of the tenders and the construction of the works are all subject to the principle of lowest price, which is forced on the clients by law. Tender documents often contain errors and the tenders are not seldom speculative and under-priced. This inevitably leads to disputes during the construction phase.
The NATM is, however, a construction method, which needs flexible contract arrangements between partners, competent professionals, slender structures and short decision routes on the tunnel site in order to fulfil its entire potential. In contrast to this, tunnel sites today are often characterised by senseless administrative work and irrelevant reciprocal controls. The rapid development and increasing automation of machines and the development of construction materials still offer great chances for the NATM in the future. The future of the tendering and award arrangements, however, should be reconsidered and the training of managers capable of making decisions should be encouraged, in order to recreate the old team spirit of tunnellers on the site.
Seit der Einführung der Neuen Österreichischen Tunnelbauweise in der Mitte der 1960er Jahre erlebt der Tunnelbau in vielen Bereichen eine grundlegende Veränderung. Die zunehmende Verrechtlichung und die fortschreitende Bürokratisierung haben dazu geführt, dass die heutigen Tunnelbauverträge im Vergleich zu früher umfangreich, umständlich und widersprüchlich geworden sind. Sowohl die Erstellung der Ausschreibungsplanung als auch die Angebotsbearbeitung bis hin zur Ausführung leiden unter dem Billigstbieterprinzip, dem die Bauherrn gesetzlich unterworfen sind. Die Ausschreibungen sind meist mangelhaft, die Angebote nicht selten spekulativ und unterpreisig. Die NÖT aber ist eine Bauweise, die zur vollen Entfaltung ihres Potenzials eine flexible partnerschaftliche Vertragsgestaltung, kompetente Mitarbeiter, schlanke Strukturen und kurze Entscheidungswege auf der Baustelle benötigt. Im Gegensatz dazu sind die Baustellen heute von sinnlosem Verwaltungsaufwand und oft unsinniger gegenseitiger Kontrolle geprägt. Die rasante Entwicklung und die zunehmende Automatisierung von Maschinen und die Weiterentwicklung von Baustoffen bieten auch in Zukunft große Chancen für die NÖT. Allerdings ist in Zukunft der Vergabemodus zu überdenken und die Ausbildung entscheidungskompetenter Führungskräfte zu fördern, um den alten Teamgeist der Tunnelbauer auf den Baustellen wieder herzustellen.

x
Herdina, J.The present status of the NATM in contracts - tendering / Gegenwart der NÖT im Bauvertrag - AusschreibungGeomechanics and Tunnelling6/2010781-787Topics

Kurzfassung

Although the expert circle of NATM users has demonstrated that they are technically capable of using the NATM successfully under almost any conditions, there are repeated difficulties concerning the handling of contracts. The construction contract with flexible provisions regarding classification and the invoicing of common costs as the basis for a collaborative project implementation has been subjected to extreme stress recently by various construction companies. The expectations of the contractor concerning tendering are not identical to the tender documents currently in use in the market. The article explains the differences and proposes a way of overcoming such problems in the future. The author maintains that in his view three main points could lead to an improvement of contract implementation:
· The appointment of contractors only for a plausible total price,
· Consultants as a partner of the client and
· The provision of a behaviour code for NATM construction measures.
Während die Fachgemeinschaft der NÖT-Anwender bewiesen hat, dass sie technisch in der Lage ist, bei fast allen Randbedingungen die NÖT erfolgreich anzuwenden, ergeben sich auf der vertraglichen Seite immer wieder Abwicklungsschwierigkeiten. Der flexible Bauvertrag bezüglich Klassifizierung und Gemeinkostenabrechnung als Grundlage für eine partnerschaftliche Projektabwicklung zwischen Bauherren und Auftragnehmern wurde in letzter Zeit bei verschiedenen Baumaßnahmen äußerst strapaziert. Die Erwartungshaltung des Auftragnehmers zur Ausschreibung ist nicht ident mit den aktuell am Markt befindlichen Ausschreibungsunterlagen. Im Artikel werden die Unterschiede dargelegt, und es wird versucht, einen Weg aufzuzeigen, wie in Zukunft die Probleme überwunden werden können, wobei der Autor festhält, dass aus seiner Sicht drei wesentliche Punkte zur Verbesserung der vertraglichen Abwicklung führen können:
· Beauftragung von Firmen nur zur einem plausiblen Gesamtpreis,
· Planer als Partner des Bauherrn und
· Festlegen eines Verhaltenskodex für NÖT-Baumaßnahmen.

x
Gobiet, GerhardThe railway station Mürzzuschlag in relation to the Semmering Base Tunnel / Der Bahnhof Mürzzuschlag im Kontext mit dem Semmering-BasistunnelGeomechanics and Tunnelling6/2017660-667Topics

Kurzfassung

The opening of the Semmering Base Tunnel (SBT from timetable change in 2026/27) will change the characteristics of the Baltic-Adriatic axis from a mountain railway to a flat trajectory. This will revalue the trans-European route in the Austrian segment with lasting effect. In future, the railway station at Mürzzuschlag will play an even more important role in the Baltic-Adriatic axis than today. The connection to the metropolitan area of Vienna will bring a time saving for long-distance passenger traffic of about 30 minutes. The rail freight traffic will profit from the fact that train will no longer run over the mountains. The enlargement of the park & ride facility, the improved connection to public transport as part of the transformation of the forecourt, the enlargement of the ASC location and the adaptation of the existing station buildings will improve Mürzzuschlag station with lasting effect.
Mit der Inbetriebnahme des Semmering-Basistunnels (SBT) ab Fahrplanwechsel 2026/27 ändert sich die Charakteristik der Baltisch-Adriatischen-Achse von einer Bergbahn zur Flachbahn, und die transeuropäische Route im österreichischen Abschnitt wird somit nachhaltig aufgewertet. Der Bahnhof Mürzzuschlag wird zukünftig eine noch stärkere Rolle auf der Baltisch Adriatischen Achse einnehmen als heute. Die Verbindung in den Großraum Wien wird eine Zeitersparnis im Personenfernverkehr von rund 30 Minuten bringen. Der Güterverkehr profitiert davon, dass die Zugfahrten nicht mehr über Bergstrecken geführt werden müssen. Durch die Erweiterung der Park-and-Ride-Anlage, verbesserte Anbindung an den öffentlichen Personennahverkehr durch die Umgestaltung des Vorplatzes, die Erweiterung des ASC-Standorts und Anpassung der bestehenden Hochbauten wird der Bahnhof Mürzzuschlag nachhaltig attraktiviert.

x
Bacher, M.; Brandtner, M.; Kohlböck, B.; Santner, J.The rebuilding of the ventilation cavern at the Tauern Tunnel / Der Umbau der Lüfterkaverne TauerntunnelGeomechanics and Tunnelling4/2010355-364Topics

Kurzfassung

This report gives an overview of the ventilation scheme for both tubes of the Tauern Tunnel with particular attention to the rebuilding of the multi-storey ventilation cavern. The cavern was designed and constructed in the 1970s - along with most of the ventilation system - and provides the ventilation for the central sections of both tubes with a ventilation shaft about 600 mm deep. While the original scheme intended sheet metal ducts partly suspended from the cavern vault, all the extract air ducts now had to be constructed of reinforced concrete as part of the construction of the second tube on account of the requirement for fire resistance. This also included the replacement of existing suspended sheet metal ducts.
The design work was a particular challenge because the structural design and detailing also had to consider the complicated existing structure and the aerodynamic (flow resistance) and logistical (maintenance of traffic and continuous operation of ventilation) aspects.

Im vorliegenden Bericht wird eine Übersicht über das Lüftungskonzept der beiden Röhren des Tauerntunnels gegeben, wobei besonders auf die Umbauarbeiten der mehrgeschossigen Lüfterkaverne eingegangen wird. Die Kaverne wurde - wie der Großteil der Lüftungsanlage - bereits in den 1970-er Jahren für beide Tunnelröhren geplant und errichtet und gewährleistet mit einem rund 600 m hohen Lüftungsschacht die Be- und Entlüftung der zentralen Lüftungsabschnitte für beide Tunnelröhren. Während beim ursprünglichen Konzept zum Teil vom Kavernengewölbe abgehängte Blechkanäle vorgesehen waren, müssen im Zuge des Neubaus der zweiten Tunnelröhre und der Sanierung der Bestandsröhre sämtliche Abluftkanäle wegen der geforderten Hitzebeständigkeit in Stahlbetonbauweise ausgeführt werden. Daher musste auch für die bereits bestehenden, aufgehängten Blechkanäle Ersatz geschaffen werden.
Die Planungsarbeiten erwiesen sich als besonders herausfordernd, da die statisch-konstruktive Planung auch die komplexen bestehenden Bauwerke und zusätzlich lüftungstechnische (Strömungswiderstand) und logistische (Verkehrsaufrechterhaltung und laufender Lüftungsbetrieb) Aspekte zu berücksichtigen hatte.

x
Wolter, BernhardThe reconstruction of the historic facades of the Berlin Palace / Die Rekonstruktion der historischen Fassaden für das Berliner SchlossMauerwerk1/201940-49Berichte

Kurzfassung

The masonry and wall building for the reconstruction of the historic facades for the rebuilding of the Berlin Palace as the Humboldt Forum represent a unique challenge for the art of masonry, structural design and detailed design. In front of the modern reinforced concrete structure of the new palace building, the massive solid brick masonry wall, separated from it by mineral insulation, leads to an overall thickness for the historically reconstructed external wall that comes near to the average thickness of the baroque palace walls. The exceptional thickness of the brick wall serves as a substrate for the facade decoration elements of sandstone and together with the internal insulation, enables the requirements of the energy-saving regulations (EnEV) to be clearly exceeded.

x
Fellin, WolfgangThe rediscovery of infinite slope model / Die Wiederentdeckung der unendlich langen BöschungGeomechanics and Tunnelling4/2014299-305Topics

Kurzfassung

The infinite slope model is very simple and its essential conclusion is that the maximum inclination of a cohesionless slope is equal to the friction angle of the soil. In combination with generally used failure models for cohesionless soils this assumption leads to an overestimation of slope stability. Alternative estimations for slope stability are presented in this contribution.
Das Modell der unendlich langen Böschung ist sehr einfach und liefert als klassische Schlussfolgerung, dass die maximale Neigung einer kohäsionslosen Böschung gleich dem Reibungswinkel des Bodens ist. Dies liegt für die im Allgemeinen verwendeten Versagensmodelle kohäsionsloser Böden für steilere Böschungen deutlich auf der unsicheren Seite. In diesem Beitrag werden alternative Abschätzungen angeführt.

x
Freitag, Manfred; Larcher, Markus; Blauhut, AndreasThe Reißeck II pumped storage power station / Das Pumpspeicherkraftwerk (PSKW) Reißeck IIGeomechanics and Tunnelling2/2011119-128Topics

Kurzfassung

The Reißeck II pumped storage power station under construction for the Verbund Hydro Power AG is part of their current extension project in southern Austria. Features of the new system are the advantages of the rapidly available and easily controllable power output of a pumped storage scheme in generation operation and the possibility of storing hydropower water at times of low energy demand. The upgraded output of 430 MW in generation and pumping operation will achieve an increase of efficiency of the entire plant of up to 40 %. It is advantageous that some essential parts of the existing system (reservoir, tunnel system, infrastructure) can be made use of and will not have to be newly constructed. Starting from the experience of the challenging geological conditions during the construction of the original system, extensive geological investigations were carried out. Both mechanical and conventional tunnelling methods are being used to overcome the height difference of just under 600 m. The wholly underground power station with a tunnel system about 5.3 km long and a powerhouse cavern for two machine sets is planned for full operation in September 2014.
Das derzeit im Bau befindliche Pumpspeicherkraftwerk Reißeck II der Verbund Hydro Power AG ist ein aktuelles Erweiterungsprojekt im Süden Österreichs. Wesentliche Merkmale der Neuanlage sind die Vorteile der schnell verfügbaren und gut regelbaren Energieabgabe eines Speicherkraftwerks im Turbinenbetrieb sowie die Möglichkeit zur Speicherung des Triebwassers in Zeiten geringeren Energiebedarfs. Mit einer Ausbauleistung von 430 MW im Turbinen- und Pumpbetrieb wird eine Effizienzsteigerung des gesamten Kraftwerksstandorts von bis zu 40 % erreicht. Vorteilhaft ist, dass wesentliche Anlagenteile bestehender Anlagen (Speicher, Triebwasserweg, Infrastruktur) mitbenutzt werden können und nicht neu errichtet werden müssen. Aufbauend auf Erfahrungen und Kenntnisse über die herausfordernden geologischen Verhältnisse bei den Bestandsanlagen wurden umfangreiche geologische Vorerkundungen durchgeführt. Zur Überwindung der knapp 600 m Höhendifferenz kommen sowohl maschinelle als auch konventionelle Vortriebsverfahren zum Einsatz. Die vollständig unterirdisch errichtete Kraftwerksanlage mit einem ca. 5, 3 km langen Triebwasserweg und einem Kavernenkraftwerk für zwei Maschinensätze soll im September 2014 den Vollbetrieb aufnehmen.

x
Freitag, Manfred; Larcher, Markus; Hager, AndreasThe Reißeck II pumped storage power station in Carinthia / Das Pumpspeicherkraftwerk (PSKW) Reißeck II in KärntenGeomechanics and Tunnelling5/2011553-561Topics

Kurzfassung

The Reißeck II pumped storage power station being constructed for the Verbund Hydro Power AG is a current extension project in the south of Austria. With an extended capacity of 430 MW in generation and pumping modes, the efficiency of the entire pumped storage scheme will be increased by up to 40%. One advantage is that many parts of the existing system (reservoirs, headrace tunnel, infrastructure) can be used and do not have to be newly constructed. Both, mechanical and conventional tunnelling, methods are being used to overcome the height difference of just 600 m. The power station will be entirely housed underground and should enter full service in September 2014 at a cost of 385 mio Euro. The main works has been under construction since June 2010 by a joint venture of Hinteregger, Östu-Stettin, Porr and Swietelsky.
Das derzeit im Bau befindliche Pumspeicherkraftwerk Reißeck II der Verbund Hydro Power AG stellt ein aktuelles Erweiterungsprojekt im Süden Österreichs dar. Mit einer Ausbauleistung von 430 MW im Turbinen- und Pumpbetrieb wird eine Effizienzsteigerung des gesamten Kraftwerksstandorts von bis zu 40% erreicht. Vorteilhaft ist, dass zum Teil wesentliche Anlagenteile bestehender Anlagen (Speicher, Triebwasserweg, Infrastruktur) mitbenutzt und nicht mehr errichtet werden müssen. Zur Überwindung der knapp 600 m Höhendifferenz kommen sowohl maschinelle als auch konventionelle Vortriebsverfahren zum Einsatz. Die vollständig unterirdisch errichtete Kraftwerksanlage mit einem Gesamtinvestitionsvolumen von 385 Mio. Euro soll im September 2014 den Vollbetrieb aufnehmen. Die Hauptbauarbeiten werden seit Juni 2010 von der Arbeitsgemeinschaft Hinteregger, Östu-Stettin, Porr, Swietelsky ausgeführt.

x
Hammer, Andreas; Bonapace, Paul; Maldet, Rainer; Schüller, OswinThe renewal of the pressure shaft for the Kaunertal high-head hydropower plant in AustriaSteel Construction4/2013257-264Articles

Kurzfassung

A new steel-lined pressure shaft and surge tank are being constructed for the existing Kaunertal high-head hydropower plant. The inclined shaft with a diameter of 4.3 m is approx. 1430 m long and is designed for a pressure head of 100 bar. The steel lining is fully embedded and installed inside the precast concrete segmental lining, which was earlier erected as the tunnelling work progressed. Steel design criteria take into account that the internal pressure is shared between the pipe steel and the rock mass according to the stiffness ratio of lining and rock mass.
To support the development of steel lining design and material specifications prior to award of contract, the permissible steel strength vs. ductility was investigated together with the compatibility between pipe material and welding material and the brittle fracture behaviour. In particular, the high-performance steel and welding materials require a detailed fracture mechanics analysis to establish whether selected materials fit project requirements. Extensive tests were carried out on sample pipes - partly on a full-size model - by the bidders to select the steel and welding materials. An analysis of the tests revealed interesting results and dependencies on material strength, welding process, filler material and other parameters.
An overview of the project, which is being implemented between 2012 and 2015, the design criteria for the steel-lined shaft and the material specification are presented in this paper.

x
Stockinger, Georg; Thuro, Kurosch; Moeck, Inga; Straubinger, RobertThe rock mass as the governing factor for successfully developing deep geothermal systems in Southern GermanyGeomechanics and Tunnelling1/202237-47Topics

Kurzfassung

In Southern Germany, geothermal wells target Upper Jurassic carbonates, formerly referred to as Malm, below the Northern Alpine Foreland Basin (NAFB). In the northern, shallower carbonates (3000 m depth), e.g., in the Munich area, hydrothermal systems prevail, and wells yield proper flow rates. Deeper carbonates (> 4000 m) towards the south indicate a petrothermal system due to a decline in porosity and permeability. Inexplicably, fractures only contribute poorly to larger flow rates. This sets the goal for the project Dolomitkluft to analyse the rock mass for options countering low flow rates in two geothermal wells at Geretsried, Bavaria. Therefore, 20 m drill cores from 4600 to 4715 m total vertical depth (TVD) depict the initial structure of the rock mass: the rock parameters, the discontinuity network, and the in situ stresses. Alternating homogeneous, micritic, strong, to inhomogeneous, porous, weak limestones and massive, crystalline dolostones define the stratigraphy. Five joint sets from the cores can be distinguished into the bedding, two paleo anti- and synthetic normal faults and two recent strike-slip faults. The latter, in combination with core disking, allows exclusively a strike-slip (SS) stress regime and delimits the ratio to at least SH : Sv : Sh = 1.7 : 1.0 : 0.7. According to the results, including dilatation- and slip-tendencies, drill trajectories of prosperous geothermal wells should head ESE/WNW, perpendicular to SS-faults, and avoid the presence of normal faults.

Das Gebirge als Schlüsselfaktor zur erfolgreichen Erschließung tiefer geothermischer Energie in Süddeutschland
In Süddeutschland zielt tiefe Geothermie auf oberjurassische Karbonate (Malm) ab, die im Liegenden des Nordalpinen Vorlandbeckens (engl. NAFB) nach Süden abtauchen. Im nördlicheren NAFB, z. B. bei München, erbringen hydrothermale Systeme ertragreiche Schüttungen. Gegen Süden nehmen Porosität und Permeabilität in den tieferen Karbonaten (> 4000 m) ab. In dem petrothermalen System sind vorhandene Klüfte jedoch kaum hydraulisch konduktiv. Hier greift das Projekt Dolomitkluft an, das mithilfe der zwei Geothermiebohrungen bei Geretsried das Gebirge untersucht und Wege erörtert, höhere Schüttungsraten zu erreichen. Dazu dienen u. a. 20 m Bohrkerne aus einer Tiefe von 4600 bis 4715 m TVD, welche die natürliche Beschaffenheit des Gebirges, die Gesteinsparameter, das Kluftnetzwerk und Spannungsverhältnisse aufzeigen. Stratigraphisch zeigen die Kerne eine Wechsellagerung aus variierend festen, geschichteten Kalksteinen und massigen, kristallinen Dolomitsteinen, vergleichbar mit Karbonaten aus Oberflächenaufschlüssen. Fünf Trennflächenscharen in den Kernen repräsentieren die Schichtung, zwei Abschiebungs- und zwei aktive Blattverschiebungskluftsysteme (BV). Letztere lassen, in Kombination mit auftretendem “Core Disking”, nur ein BV-Regime mit einem Mindestverhältnis von SH : Sv : Sh = 1.7 : 1.0 : 0.7 zu. Die gewonnenen Informationen, zzgl. Dilatation- und Scher-Tendenzen, legen nahe, dass zukünftige Bohrungen in Richtung ESE/WNW, also senkrecht auf BV-Störungen, abgeteuft und die Nähe zu Abschiebungen gemieden werden sollten.

x
Poisel, Rainer; Kolenprat, Bernd; Bertagnoli, Michael; Ahmadabadi, Morteza; Grasemann, Bernhard; Hödlmoser, NikolausThe rockslide hazard in the former quarry near Spitz and its foreland / Die Felssturzgefahr im ehemaligen Tagebau Spitz a. d. Donau und dessen VorlandGeomechanics and Tunnelling5/2016497-507Topics

Kurzfassung

In the former quarry near Spitz many rockslides have occurred during operation as well as after closure. They endangered a railway, the Wachau-bicycle route, an important road and the left Danube river bank. Therefore, a protection embankment and a rock fall fence were constructed as well as a monitoring system installed automatically closing all traffic routes, when rock face displacements are exceeding a threshold. In order to clarify the need for risk reduction measures, the hazard caused by the former quarry near Spitz was investigated by
- Analyses of weather - and of occurrences statistics (when did rock slides occur for which reasons?) in order to assess the probability of future rock slides,
- Geomechanical analyses of occurred and of possible future rock detachments and
- Analyses of existing deposits and simulations of possible future rock slides in order to estimate the damage caused by these slides.
The results of these investigations and the subsequent conclusions are described.
Im ehemaligen Tagebau Spitz a. d. Donau ereigneten sich in der Vergangenheit sowohl während des Abbaus als auch nach dessen Stilllegung zahlreiche Felsstürze. Diese bedrohten die Wachau-Bahn, den Wachau-Radweg, die Wachau-Bundesstraße und das linksseitige Donauufer. Deshalb wurden ein Schutzdamm geschüttet, ein Steinschlagschutzzaun errichtet und ein Monitoring-Programm installiert, das bei Gefahr (bei größeren Verschiebungen) automatisch eine Sperre der Verkehrswege auslöst. Um die Notwendigkeit weiterer Maßnahmen zur Reduktion des Risikos abzuklären, wurde die vom ehemaligen Tagebau Spitz a. d. Donau ausgehende Gefahr analysiert. Dies geschah in Form von
- Analysen der Wetter- und Ereignisstatistiken (wann ereigneten sich warum Felsstürze), um die Wahrscheinlichkeit weiterer Felsstürze abzuschätzen,
- Geomechanischen Analysen früherer Ablösungen sowie Analysen möglicher zukünftiger Ablösungen und
- Analysen früherer Ablagerungen und Simulationen möglicher zukünftiger Absturzszenarien, um den durch diese Szenarien verursachten Schaden abzuschätzen.
Die Ergebnisse dieser Untersuchungen und die Schlussfolgerungen daraus werden beschrieben.

x
Schweiger, H. F.The Role of Advanced Constitutive Models in Geotechnical EngineeringGeomechanik und Tunnelbau5/2008336-344Fachthemen

Kurzfassung

Numerical calculations have a long tradition in tunnelling but in recent years numerical methods have become a standard tool for analysing a wide variety of geotechnical problems. This has become feasible because advanced constitutive models are available in commercial software packages and sufficient computer power for performing 3D nonlinear analysis is readily available. In this paper a short history of the development of constitutive models for soils will be given, starting from (non)linear elasticity to strain hardening formulations. Emphasis is put on consequences the use of different models has on the results of boundary value problems rather than on the mathematical description. The significant advances made within the last decade will be obvious. It is pointed out that this overview is directed towards practical applications and does not include models which are predominantly used in research. The merits of using advanced models in practice are discussed.

x
Hellebois, Armande; Espion, BernardThe role of the Belgian engineer Paul Christophe on the development of reinforced concrete at the turn of the 20th centuryBeton- und Stahlbetonbau12/2013888-897Berichte

Kurzfassung

Paul Christophe (1870-1957) owes his fame to being the author of the book Le béton armé et ses applications, published first in 1899 and again in 1902. This publication is considered internationally as one of the first treatises on reinforced concrete which included detailed explanations of the various computation models in use at the turn of the 20th century. He concluded by proposing rational modelling of reinforced concrete based mainly on the previous work of Coignet & de Tedesco. Until the present research, the professional life of Christophe and the context of his publication were unknown. The discovery of large parts of the family archives has allowed clarification of the role of Paul Christophe in the theoretical development of reinforced concrete. Therefore the paper proposes first to draw up the biography of Paul Christophe, secondly to expose the ins and outs of the publication Le béton armé et ses applications and finally to explore his relations with others precursors of reinforced concrete such as the Austrian engineer Fritz von Emperger (1862-1942).

Die Rolle des belgischen Ingenieurs Paul Christophe auf die Entwicklung des Stahlbetonbaus zur Zeit der Jahrhundertwende
Paul Christophe (1870-1957) verdankt seinen Ruf dem Buch Le béton armé et ses applications, dessen Autor er war. Erstmals veröffentlicht wurde das Buch 1899, ein zweites Mal im Jahr 1902. Dieses Werk wird international als eine der ersten Abhandlungen über den Stahlbetonbau angesehen, die detaillierte Erläuterungen zu den verschiedenen, zur Zeit der Jahrhundertwende üblichen Berechnungsmodellen enthält. Der Autor schloss sein Buch mit der These, dass eine vernünftige Modellierung von Stahlbeton hauptsächlich auf die früheren Arbeiten von Coignet & de Tedesco zurückgeht. Bis dato war in der heutigen Forschung nichts über das Berufsleben von Christophe und den Zusammenhang mit seiner Veröffentlichung bekannt. Die Entdeckung von großen Teilen des Familienarchivs ermöglichte es nun zu klären, welche Rolle Paul Christophe im Bereich der theoretischen Entwicklung des Stahlbetonbaus inne hatte. Der Beitrag beginnt mit seiner Biographie. Anschließend wird gezeigt, welche Strömungen und Arbeiten Einfluss auf sein Buch Le béton armé et ses applications hatten und welchen Einfluss das Buch wiederum auf die Fachwelt hatte. Zuletzt werden seine Beziehungen zu anderen Vorreitern des Stahlbetonbaus, wie z.B. zum österreichischen Ingenieur Fritz von Emperger (1862-1942) erkundet.

x
Page, Adrian W.The Role of Thermal Mass in the Sustainable Design of Australian HousingMauerwerk3/2011179-185Berichte

Kurzfassung

There is an increasing worldwide interest in sustainability in all of its forms, and in particular the sustainable design of housing. In Australia this has been reflected in regulations which require new housing to satisfy various sustainability requirements, particularly in relation to energy efficiency and water consumption.
Traditionally house design in Australia has been governed by aesthetic and economic considerations with little attention being given to factors such as energy performance. A range of veneer and cavity walling systems are available, but solar-passive design principles, taking advantage of the thermal mass of heavy walling, are not widely used. As a result, many houses use artificial heating and cooling to provide internal thermal comfort, with no attempt in the design to optimise the thermal performance of the building. Since this operational energy far outweighs the embodied energy of the materials, operational performance becomes a key factor in the design of a sustainable housing system.
In this context, the more effective use of the thermal mass inherent in heavy walling such as brickwork has an important role to play in improving thermal performance. Some of the findings of a major on-going research project at the University of Newcastle focussing on this area are presented here.

Die Rolle der thermischen Masse bei nachhaltigen Konstruktionen im australischen Gebäudebau.
Es ist weltweit ein zunehmendes Interesse an Nachhaltigkeit in all ihren Formen, insbesondere bei der nachhaltigen Gestaltung der Gebäudehülle, zu verzeichnen. In Australien spiegelt sich dies in den Regelungen wider, die beim Bau von neuen Gebäuden zu beachten sind, um den verschiedenen Anforderungen der Nachhaltigkeit gerecht zu werden; insbesondere in Bezug auf Energieeffizienz und Wasserverbrauch.
Die traditionellen Hauskonstruktionen in Australien wurden von ästhetischen und ökonomischen Überlegungen beeinflusst mit nur wenig Augenmerk auf Faktoren wie Energieeffizienz. Eine Reihe von Verblend- und Hohlziegelmauerwerk-Systemen sind verfügbar; aber solare Passiv-Konstruktionsprinzipien, die den Vorteil der thermischen Massen von schweren Wänden nutzen, sind nicht sehr verbreitet. Als Folge nutzen viele Häuser künstliche Heizung und Kühlung, um thermischen Komfort zu bieten, ohne den Versuch zu unternehmen, bereits bei der Konstruktion die thermische Leistungsfähigkeit des Gebäudes zu optimieren. Da die eingesetzte Energie für den Betrieb des Gebäudes bei weitem die graue Energie der Materialien übersteigt, wird diese Gesamtenergie zu einem wichtigen Faktor bei der Herstellung nachhaltiger Gebäudesysteme.
In diesem Zusammenhang spielt die effizientere Nutzung der in schweren Wänden aus Mauerwerk vorhandenen thermischen Masse eine wichtige Rolle bei der Verbesserung der thermischen Leistungsfähigkeit. Einige der Ergebnisse eines laufenden umfassenden Forschungsprojektes an der Universität von Newcastle mit Schwerpunkt auf diesem Bereich werden im vorliegenden Beitrag vorgestellt.

x
Saischek, MichaelThe safety equipment of the new line in the Lower Inn Valley / Die sicherheitstechnische Ausrüstung der Neubaustrecke im UnterinntalGeomechanics and Tunnelling5/2012638-643Topics

Kurzfassung

100 % safety is never achievable, even with unlimited resources. The basic principles of risk optimisation pose different efficiency. Therefore the risk and the extent of damage can be over-proportionately reduced through very effective implementation of the basic principles. The article describes some measures for the minimisation of risk and their implementation on the Lower Inn Valley project as examples.
Eine 100-prozentige Sicherheit ist auch unter Einsatz unbegrenzter finanzieller Mittel nie erreichbar. Die Grundprinzipien der Risikominimierung sind unterschiedlich wirksam. Daher lassen sich durch Maßnahmen in den Grundprinzipien mit hoher Wirksamkeit das Risiko und das Schadensausmaß überproportional reduzieren. Der Beitrag beschreibt anhand von einigen Beispielen exemplarische Maßnahmen der Risikominimierung und deren Umsetzung im Unterinntalprojekt.

x
Bieker, C.The Savoy Hotel enhancement Part I: south façadeSteel Construction2/201075-82Articles

Kurzfassung

The Savoy is London’s landmark hotel located on the Thames Embankment between Waterloo Bridge and Westminster. It was closed in December 2007 and an auction was held  -  broadcasted worldwide on TV  -  to sell many pieces of the hotel’s original furniture and art. This marked the starting point for the complete refurbishment of the hotel which will soon come to an end.
A major part of the refurbishment was the work on the south façade. This Grade II listed façade is hung back from cantilevered existing lattice trusses which are supported by a 1000 mm thick brick wall. To open up the rooms to the river front, this wall was replaced by a six-storey moment frame. In order to achieve this, the existing lattice trusses had to be underpinned and therefore temporary steel towers had to be installed first.
These works are described in this paper. Other structural works, such as the installation of a large ornate glass dome, necessary due to alterations to existing steel trusses, will be published in Part II.

x
Bieker, C.The Savoy Hotel enhancement Part II: the domeSteel Construction4/2010218-224Articles

Kurzfassung

The Savoy is London’s landmark hotel located on the Thames Embankment between Waterloo Bridge and Westminster. It was closed in December 2007 for a complete refurbishment and will reopen soon.
One major part of the refurbishment  -  the underpinning of the existing cantilevering lattice trusses, from which the south façade is suspended  -  was published in ”The Savoy Hotel enhancement part I: south façade” in the 2/2010 issue of this journal. Other key parts of the refurbishment are the installation of a new lift above Savoy Way, including extending the lifts up to the 8th floor, and the installation of a large ornate glass dome above the hotel’s ”Thames Foyer”. To incorporate the dome, the existing pitched truss roof had to be temporarily supported, the tension member had to be severed and a new box structure, supporting the huge glass ornate dome, had to be inserted. The structural work undertaken is described here.

x
Blandini, Lucio; Grasmug, WalterThe search for dematerialized building envelopes - the role of glass and steelSteel Construction2/2018140-145Articles

Kurzfassung

Dedicated to Prof. Dr.-Ing. Dr.-Ing. E.h. Dr. h.c. Werner Sobek on the occasion of his 65th birthday

x
Scheller, AlbertThe second S-Bahn trunk line in Munich / Die zweite S-Bahn-Stammstrecke MünchenGeomechanics and Tunnelling2/2015115-128Topics

Kurzfassung

In order to relieve the existing S-Bahn urban transit railway trunk line under the inner city of Munich, the construction of a second S-Bahn trunk line with a further inner-city tunnel is planned, which will also link the transport nodes at the Hauptbahnhof main station, at the Marienhof/Marienplatz and at the Ostbahnhof east station. The two-track line is about 10 km long, of which about 7 km will run in tunnels, and will mainly run in the Tertiary at a depth of about 40 m due to the existing dense building and underground transport routes that have to be crossed. The platform level of the three new stations will also be correspondingly 35 to 41 m deep. The high water pressures and the cross-sections of the station tunnels of up to 330 m2 pose particular challenges for the design and construction of the stations. The article provides an overview of the overall project and the special technical features of the tunnels.
Zur Entlastung der bestehenden S-Bahn-Stammstrecke unter der Innenstadt von München ist der Bau einer 2. S-Bahn-Stammstrecke mit einem weiteren Innenstadttunnel geplant, die ebenfalls die Verkehrsknotenpunkte am Hauptbahnhof, am Marienhof/Marienplatz und am Ostbahnhof erschließen soll. Die rd. 10 km lange, zweigleisige Strecke, von der rd. 7 km im Tunnel liegen werden, wird aufgrund der bereits vorhandenen dichten Bebauung und der zu kreuzenden unterirdischen Verkehrsbauwerke überwiegend im Tertiär in einer Tiefe von rd. 40 m verlaufen. Entsprechend tief werden mit 35 bis 41 m auch die Bahnsteigebenen der drei neu zu erstellenden unterirdischen Haltepunkte liegen. Die hohen Wasserdrücke und die Querschnittsflächen der Bahnsteigröhren von bis zu 330 m2 stellen besondere Anforderungen an die Konstruktion und den Bau der Stationen. Nachfolgend wird ein Überblick über das Gesamtvorhaben und die tunnelbautechnischen Besonderheiten gegeben.

x