abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Architektenkammer Nordrhein-WestfalenBautechnik10/2002717Termine

Abstract

No short description available.

x
Rott, NatalieArchitektenhonorarrechnung: Wann ist sie prüfbar?UnternehmerBrief Bauwirtschaft4/201512-15Berichte

Abstract

Nicht selten kommt es bei Bauvorhaben zum Streit zwischen Bauherr und Architekt/Ingenieur hinsichtlich der Höhe von Honoraren. Spätestens vor Gericht hat der Architekt die Voraussetzungen seines Honoraranspruchs darzulegen und zu beweisen. Dabei spielt die Prüfbarkeit der Honorarschlussrechnung eine zentrale Rolle. Wendet der Auftraggeber (AG) die fehlende Prüfbarkeit einer Rechnung innerhalb der Prüffrist ein, wird der Honoraranspruch nicht fällig (vgl. § 15 Abs. 1 HOAI) und kann nicht durchgesetzt werden. Daneben kann der AG im Prozess die Forderungshöhe bestreiten, so dass der Auftragnehmer (AN) seine Ansprüche prüfbar darlegen muss.

x
Schalk, GüntherArchitekten-Weitblick vertraglich geschuldet? 1/2013UnternehmerBrief Bauwirtschaft1/20131Editorial

Abstract

No Abstract.

x
Architekten-und Ingenieur-Verein zu Berlin wählt neuen VorstandBautechnik5/2011339Nachrichten

Abstract

No short description available.

x
Architekt Carlo Weber verstorbenMauerwerk5/2014330Persönliches

Abstract

No short description available.

x
Architecture. City. Responsibility / Architektur. Stadt. VerantwortungMauerwerk4/2018224Termine

Abstract

No short description available.

x
Architecture+Technology Award 2006Bautechnik6/2006459Nachrichten

Abstract

No short description available.

x
Architecture+Technology AwardBautechnik5/2005333Nachrichten

Abstract

No short description available.

x
Murtinho, V.; Ferreira, H.; Correia, A.; Simões da Silva, L.; Gervásio, H.; Santos, P.Architectural concept for multi-storey apartment building with light steel framingSteel Construction3/2010163-168Articles

Abstract

This paper describes a modular, easy-to-build, energy-efficient and affordable architectural concept for multi-storey residential buildings. The design concept evolves from a minimum modular grid that allows multiple combinations while ensuring spatial flexibility, net area optimization and adaptability. The proposed solution is based on light steel framing to allow easy erection and rapid construction without the need for complex and expensive in situ construction facilities.

x
ArchiPHYSIK 2.0 - das Bauphysik-Modul zu ArchiCADBautechnik3/2001208Nachrichten

Abstract

No short description available.

x
Jäger, Wolfram; Bakeer, TammamArching effect in case of exterior walls with low surcharge under wind action / Ausbildung der Bogentragwirkung bei Außenwänden mit geringer Auflast unter WindbeanspruchungMauerwerk3/2015183-186Fachthemen

Abstract

It is very important to have a minimum surcharge on external masonry walls to help the wall resisting wind actions. The present contribution describes the behaviour of masonry wall under wind action with low surcharge. The behaviour has been investigated using a finite element non-linear model that considers the large displacement non-linearity. An increasingly wind load has been applied and the deformation state and the thrust line within the wall have been investigated. The results of the analysis show that the behaviour of the wall under low surcharge was greatly characterized by the arching effect. Due to the low surcharge the influence of the second order effect was very small and can be neglected.

x
Kurrer, Karl-EugenArchimedes. Ingenieur, Naturwissenschaftler, Mathematiker. Von I. SchneiderStahlbau3/2016236-237Rezensionen

Abstract

No short description available.

x
ArchiCAD-Preis für Innovatives Bauen mit GlasBautechnik3/1999271-272EDV im Bauwesen

Abstract

No short description available.

x
ARCH'01 Third International Conference Arch BridgesStahlbau7/2001512Termine

Abstract

No short description available.

x
Sieder, Mike; Krecker, Tobias; Marsik, MichalArborTUM - Umsetzung eines historischen Tragsystems mit modernen Entwurfs- und AusführungsmöglichkeitenBautechnik4/2012275-280Berichte

Abstract

In einer interdisziplinären Zusammenarbeit zwischen Studenten der Architektur- und der Bauingenieurfakultät der Technischen Universität München entstand ein skulpturales Holzobjekt, bei dem das historische Tragprinzip des Hebelstabwerks durch die zukunftsweisende Möglichkeit des parametrischen Entwerfens umgesetzt und mithilfe moderner CNC-Holzbearbeitungstechnik ausgearbeitet wurde.

ArborTUM - Realization of a historic structural principle by the possibilities of modern design and processing technology.
Students of the faculty of architecture and civil engineering of the Technische Universität München created a sculptural timber object in an interdisciplinary cooperation. Thereby the historic structural principle of the selfsupporting-framework was realized by the forward-looking possibility of the parametric design and by modern CNC-wood processing technology.

x
Arbeitszimmer für Mitarbeiter und Ehepartner: MusterprozessUnternehmerBrief Bauwirtschaft5/201415Berichte

Abstract

Für Außendienstmitarbeiter oder den angestellten Ehepartner läuft derzeit ein interessanter Musterprozess zum häuslichen Arbeitszimmer.

x
Herkommer, F.Arbeitszeitrichtwerte mit geschweissten Betonstahlmatten und Stahlersparnis.Bautechnik10/1977350-353

Abstract

Die wirtschaftlichen Vorteile von Listenmatten und Lagermatten im Stahlbetonbau.

x
Arbeitsvorbereitung im Ingenieurhochbau (Spranz, D.)Bautechnik5/2004404Bücher

Abstract

No short description available.

x
Arbeitstagung der Bundesvereinigung der Prüfingenieure für BautechnikStahlbau8/2004644Termine

Abstract

No short description available.

x
Arbeitstagung der Bundesvereinigung der PrüfingenieureBeton- und Stahlbetonbau8/2004695Tagungen

Abstract

No short description available.

x
Arbeitstabellen aktualisiertBautechnik7/1998499Nachrichten

Abstract

No short description available.

x
Arbeitsschutz und Arbeitssicherheit auf BaustellenUnternehmerBrief Bauwirtschaft5/201620Buchtipps

Abstract

No short description available.

x
Arbeitsrecht - Urteil zur Nachwirkung und -bindung von TarifverträgenUnternehmerBrief Bauwirtschaft8/20052

Abstract

No short description available.

x
Arbeitsrecht - Rückforderung vermögenswirksamer LeistungenUnternehmerBrief Bauwirtschaft7/20083

Abstract

Will ein Arbeitgeber über das Ende des Arbeitsverhältnisses hinaus irrtümlich gewährte vermögenswirksame Leistungen vom Arbeitnehmer zurückfordern, muss er vor dem Arbeitsgericht klagen.

x
Arbeitsrecht - Mitarbeiter mit Auslandseinsatz ohne Anspruch auf bAVUnternehmerBrief Bauwirtschaft2/20081

Abstract

No short description available.

x