abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Taffe, A.; Krause, M.; Milmann, B.; Niederleithinger, E.Zerstörungsfreie Untersuchungen an Fundamentplatten mit UltraschallechoBeton- und Stahlbetonbau12/20041000-1004Berichte

Abstract

No short description available.

x
Schneck, U.Zerstörungsfreier elektrochemischer Chloridentzug an der Donaubrücke Pfaffenstein: Langzeiterfahrungen über eine bauwerksschonende und verkehrserhaltende TechnologieBeton- und Stahlbetonbau3/2009145-153Fachthemen

Abstract

Zwischen 2003 und 2007 wurden in der Donaubrücke Pfaffenstein, die im Zuge der BAB A93 in Regensburg Donau und Donaukanal überspannt, insgesamt 200 m2 Hohlkastenbodenflächen in Teilabschnitten mit zerstörungsfreiem, elektrochemischem Chloridentzug instandgesetzt. Diese Bereiche waren durch Defekte im Entwässerungssystem der Fahrbahntafel teils erheblich chloridbelastet (bis 4%, bezogen auf die Zementmasse), so dass die Bewehrung aktiv korrodierte, aber noch keine kritischen Querschnittsverluste entstanden oder Schäden am Beton eingetreten waren. Nach Abschluss des Chloridentzugs wurden die Betonflächen, aus denen ca. 28 kg Chlorid entfernt worden sind, mehrfach - in einem Abstand von bis zu drei Jahren - mit Potentialmessungen nachuntersucht. Dabei konnte nachgewiesen werden, dass die chloridinduzierte Korrosionsaktivität - auch bei vereinzelt vorhandenem Restchloridgehalt - zuverlässig beseitigt wurde. Weder die Autobahn noch die im Arbeitsbereich unter der Brücke führende Bundesstraße waren von den Arbeiten betroffen. In diesem Beitrag sollen Wirkprinzip, Randbedingungen und die seit 2001 vom Autor gesammelten Erfahrungen mit dieser Instandsetzungsmethode besprochen werden.

x
Zerstörungsfreies Aufspüren winziger OberflächenrisseBeton- und Stahlbetonbau10/2013742Aktuell

Abstract

No short description available.

x
Zertifikatstudiengang Facility ManagementBautechnik10/2006743-744Nachrichten

Abstract

No short description available.

x
Zertifizierte NachhaltigkeitBeton- und Stahlbetonbau3/2018245Aktuelles

Abstract

No short description available.

x
Zertifizierter KanalsanierungsberaterBautechnik12/2000962Termine

Abstract

No short description available.

x
Zertifizierter SanierungsberaterBautechnik10/1999935Termine

Abstract

No short description available.

x
Faber, T.; Klose, M.Zertifizierung von Offshore-Windparks - Erste ErfahrungenStahlbau9/2007613-619Fachthemen

Abstract

Die Planung und Errichtung von Offshore-Windparks ist ein komplexes Aufgabenfeld, an dem eine Vielzahl von Beteiligten aus unterschiedlichen Fachbereichen über mehrere Jahre mitwirkt. Die Errichtungskosten für diese Projekte können im dreistelligen Millionenbereich liegen. Begleitet wird der Prozess im Rahmen der Zertifizierung durch unabhängige Sachverständigenorganisationen wie den Germanischer Lloyd (GL), die ihre Erfahrungen aus der Meerestechnik und den zahlreichen Windparks an Land einbringen, um so die Sicherheit und das “Vieraugenprinzip” zu wahren. Dieser Beitrag erläutert die grundsätzlichen Aspekte der Zertifizierung von Offshore-Windparks und gibt anhand einiger Beispiele ausgeführter Projekte im europäischen Ausland Einblicke in die Problemstellungen, die sich aus der komplexen Wechselwirkung zwischen Einwirkungen, Tragstruktur und Anlagenverhalten ergeben. Komplettiert wird der Artikel durch Erfahrungen aus Forschungsergebnissen zum Thema Korrosionsschutz und dem Betrieb der Forschungsplattform FINO 1.

x
Pärsch, J.; Petrick, K.Zertifizierung von Qualitätssicherungssystemen auch in der Bauindustrie.Bautechnik10/1992589-592Berichte

Abstract

No short description available.

x
Zertifizierung von WindturbinenStahlbau6/2005482Nachrichten

Abstract

No short description available.

x
Zeugin der Geschichte - die Alte Weichselbrücke in Dirschau (Ramm, W. (Hrsg.))Bautechnik1/200556-57Bücher

Abstract

No short description available.

x
Suda, J.Zeugin der Geschichte: Die Alte Weichselbrücke in Dirschau (Ramm, W.)Beton- und Stahlbetonbau10/2006831-832Bücher

Abstract

No short description available.

x
Zeugin der Geschichte: Die Alte Weichselbrücke in Dirschau (Ramm, W.)Stahlbau9/2005722Rezensionen

Abstract

No short description available.

x
Gao, ZongyuZhengzhou Yellow River road-cum-railway bridge, ChinaStahlbau2/2012151-155Berichte

Abstract

Zhengzhou Yellow River road-cum-railway bridge accommodates both the Beijing-Guangzhou passenger railway line and the Zhengzhou-Xinxiang inter-city highway, which cross the Yellow River at Zhengzhou, China (Fig. 1). The bridge is 9177 m long and has two distinct sections[1]: the first is a six-pylon continuous steel-concrete composite truss extradosed bridge with a span arrangement of 120 5 ¥168 120 m; the second is a continuous steel-concrete composite truss with a span arrangement of 5 ¥120 m. The main bridge has a double deck, with a six-lane carriageway on the upper deck and a twin-track railway on the lower deck. An inclined truss structure is used for the main bridge superstructure. The upper deck is of concrete, the lower deck uses orthotropic steel solution. The analysis revealed that the main bridge has good rigidity and favourable service conditions for high-speed trains. The main steel truss was constructed by incremental launching.

x
Ziegel-Geschossbau in PassivhausbauweiseMauerwerk5/2010310Aktuell

Abstract

No short description available.

x
Ziegel-Lexikon - alles aus Ziegel vom Keller bis zum DachBautechnik10/2001755Nachrichten

Abstract

No short description available.

x
Ziegelarchitektur im mediterranen Stil: Die Yachthafenresidenz "Hohe Düne" in RostockMauerwerk4/2006181-182Berichte

Abstract

No short description available.

x
Ziegeleipark MildenbergMauerwerk4/2011222Aktuell

Abstract

No short description available.

x
Krechting, A.; Figge, D.; Jedamzik, H.-W.Ziegelelementbau - Modular und wirtschaftlichMauerwerk1/200621-33Fachthemen

Abstract

Der Beitrag behandelt in vier Abschnitten wesentliche Aspekte des Bauens mit werksgefertigten Elementen aus Ziegelmauerwerk. Wegen des notwendigerweise begrenzten Beitragsumfanges kann das nur zusammenfassend erfolgen. Eine ausführliche und vollständige Darstellung enthält ein voraussichtlich in Kürze erscheinendes Sonderheft der Zeitschrift.
Der Abschnitt 1 des Beitrages widmet sich der allgemeinen Beschreibung der Bauweise sowie der Darstellung zweier Beispiele aus der Praxis des Ziegelelementbaus. Im Anschluß daran werden ergänzend die charakteristischen Merkmale der Bauweise sowie die “neue” DIN 1053-4 skizziert.
Abschnitt 2 ist von hoher Praxisrelevanz gekennzeichnet und beschreibt die maßgeblichen Verfahrensabläufe der Montage der Ziegelwandelemente.
Abschnitt 3 gibt wichtige Hinweise für Planung und Ausführung von Außenputz auf Ziegelwandelementen.
Die Immobilie mit Keller ist bevorzugte Bauweise im Wohnungsbau. Ob traditionelle oder hochwertige Nutzung des Kellerraumes - vorgefertigte Ziegelwandelemente bieten hierzu die notwendigen Voraussetzungen. Abschnitt 4 dieses Beitrages gibt einen Überblick über die zu beachtenden technischen Regeln und Festlegungen in bezug auf Feuchteschutz, Bauwerkabdichtungen und Abdichtungssysteme und erläutert die Bemessung von Kellerwänden aus Ziegelwandelementen.

x
Ziegelforum lobt Architekturpreis 2002 ausBautechnik8/2002564Nachrichten

Abstract

No short description available.

x
Ziegelhersteller aus der DDR gründen eigenen VerbandBauphysik5/1990150Aktuelles

Abstract

No short description available.

x
Steinbach, F.; Worg, S.; Pfeifer, M.Ziegelherstellung und Ziegeleigenschaften in MadagaskarMauerwerk6/2005284-286Fachthemen

Abstract

Mauerwerk wird in Madagaskar nicht als tragender Baustoff verwendet. Obwohl die Grundlagen dafür vorhanden sind und der Einsatz von Mauerwerk für das Land aus bauklimatischer und auch aus wirtschaftlicher Sicht überaus sinnvoll wäre, wird Massivkonstruktionen aus Stahlbeton, in die Mauerwerk nur als nichttragendes Element integriert wird, der Vorzug gegeben.
Der Bericht beschäftigt sich mit der Herstellung und den daraus resultierenden Eigenschaften von Mauerziegeln in Madagaskar, in denen die Hauptursache für den Nichteinsatz von Mauerwerk als tragendes Bauteil zu suchen ist. Er entstand im Zuge eines größeren Bauvorhabens in Madagaskar, welches von den Autoren betreut wird.

x
Planck, A.; Weber, D.Ziegelsplitt-Schüttbeton - Untersuchung eines Schadensfalles.Bautechnik5/1986156-163

Abstract

Die sehr niegdrige, stark streuende Druckfestigkeit von geschütteten Wänden aus Ziegelsplittbeton gab Veranlassung für die kurzfristige Räumung von zwei siebengeschossigen Häusern in Berlin-Britz. Für die grundlegenden, umfangreichen Untersuchungen zu Schadensursache, Materialverhalten und Sanierungsmöglichkeiten wurden neben Bohrkernen auch sechs, dem Bauwerk entnommene Wandteile im Labor untersucht. Die zulässige Beanspruchbarkeit der Bauwerksteile ist nach einem probabilistischen Konzept zur Sicherheitsbeurteilung aus den zu Materialfestigkeiten bereichsweise zusammengefassten Bohrkernfestigkeiten berechnet worden.

x
Laue, H.; Klostermann, H.; Alicki, G.Ziegelverblendfertigteile: perfekte Technik hinter der Sichtfläche beim Backforum HannoverMauerwerk2/200881-84Anwendungsberichte

Abstract

No short description available.

x
Ziegelwerk Eisenberg produziertBauphysik6/1992187Aktuelles

Abstract

No short description available.

x