abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Schütz, Holger; Konietzky, HeinzStudies of flooding induced by seismicity in the Schlema-Alberoda uranium mine / Untersuchungen zur flutungsinduzierten Seismizität im Uranerzbergwerk Schlema-AlberodaGeomechanics and Tunnelling5/2016508-514Topics

Abstract

The uranium mine in Schlema-Alberoda near the town Aue in south-east Germany was operated between 1947 and 1990. In 1979, a seismic event with local magnitude of ML = 2.9 and intensity MSK = 5 (Medvedev-Sponheuer-Karnik scale) was monitored close to the mining area. Due to this event and observations of underground dynamic de-stressing, a local seismic network was installed and extended in the following years. Seismic events were routinely located and source parameters for selected events were determined [1], [2]. It was found that most of the sources of dynamic events are located outside the mine, in the neighbouring granitic intrusion. During the period of active mining, continuous online evaluation of seismic events was performed in conjunction with online hazard evaluation [2].
In 1990, the controlled flooding of the mine was started. A total excavated volume of 35 m. m3 had to be flooded. The flooding was completed in 2012. The flooding process was continuously monitored with a seismic network over the whole period of 22 years. This large dataset has been used for statistical calculations, correlations between seismicity and flooding level and ground velocity predictions.
Im Bergwerk Schlema-Alberoda, in der Nähe der Stadt Aue im Südosten Deutschlands, wurde von 1947 bis 1990 Uranerz im Firststoßbau-Verfahren abgebaut. Im Jahr 1979 wurde in der Nähe des Bergwerks ein seismisches Ereignis mit einer Lokalmagnitude von ML = 2,9 und einer Intensität von I = 5 nach der Medwedew-Sponheuer-Karnik-Skala aufgezeichnet. Dieses Ereignis, verbunden mit beobachteten Spannungsumlagerungen, führte zur Entscheidung, ein lokales seismologisches Online-Überwachungsnetz zu installieren und in den folgenden Jahren auszubauen. Die Lokalisierung und Magnitudenbestimmung wurde seitdem routinemäßig durchgeführt, und für ausgewählte Ereignisse konnten Herdparameter bestimmt werden [1, 2]. Weiterhin wurde während der Zeit des aktiven Bergbaus eine Online-Gefährdungsbeurteilung durchgeführt [2]. Die Beobachtungen zeigten, dass sich ein Großteil der Hypozentren nicht im Bergwerk selbst befinden, sondern in der darunter liegenden Granitintrusion. Nach der Einstellung der Bergbauarbeiten wurde im Jahr 1990 die kontrollierte Flutung eingeleitet, die im Jahr 2012 abgeschlossen war. Insgesamt wurden 35 Mio. m3 Hohlraum geflutet. Während des gesamten Zeitraums wurde die Flutung kontinuierlich mit dem seismologischen Netz überwacht. Dieser umfangreiche Datensatz wurde für statistische Berechnungen, Korrelationen zwischen Seismizität und Flutung und zur Abschätzung von Bodenschwinggeschwindigkeiten verwendet.

x
Gaul, Felix; Eggenreich, StefanInstallation of a microseismic monitoring system in the Mittersill scheelite mine / Aufbau eines mikroseismischen Ãœberwachungssystems im Mittersiller Scheelit BergbauGeomechanics and Tunnelling5/2016515-523Topics

Abstract

The 500.000 t/a underground Mittersill scheelite mine produced around 12 Mio. t during its 40 year lifetime. The active western field dips with 55° to the NNW under the western flank of the steep valley. The ore zone is developed over a vertical length of 600 m from its outcrop at 1.250 m down to the 650 m asl. The deepest workings are already more than 1.000 m below surface due to the dipping below the mountain range. Open stoping with backfill, cut and fill as well as sublevel caving are the prominent mining methods. End of 2015 a micro seismic system from Canadian ESG Solution was installed to get a better understanding of induced stresses and movements in rock formation. As of December 2015 the system consisting of ten sensors are constantly recording all microseismic events in the mine at a depth between 500 and 1.000 m. The events are analysed and graphically displayed according their location, magnitude and category.
Der Mittersiller untertägige Scheelit Bergbau gewinnt pro Jahr etwa 500.000 t Erz. Über die Lebensdauer des Betriebs wurden bereits mehr als 12 Mio. t abgebaut. Die derzeit im Abbau befindliche Lagerstätte, das sogenannte Westfeld fällt mit etwa 55° noch NNW unter den Hang ein. Die Lagerstätte ist vom Ausbiss auf dem Niveau 1.250 m NN bis zum Niveau 650 m NN über 600 Höhenmeter aufgeschlossen. Durch das Einfallen unter den Hang haben die tiefsten Grubenbaue bereits eine Überdeckung von über 1.000 m. Als Abbauverfahren kommen großräumiger Weitungsbau, Firstenstoßbau und Teilsohlenbruchbau zur Anwendung. Ende 2015 wurde ein mikroseismisches Überwachungssystem der kanadischen Firma ESG Solutions installiert, um ein besseres Verständnis über die durch den Bergbau hervorgerufenen Spannungsverlagerungen und Bewegungen im Gebirgsverband zu bekommen. Seit Dezember 2015 erfolgen die Aufzeichnungen in einem Bereich mit einer Überdeckung von 500 bis 1.000 m. Das System erfasst mithilfe von zehn Sensoren seismische Aktivität und zeichnet diese kontinuierlich in Echtzeit auf. Die Ereignisse werden nach Ort, Größe und Kategorie ausgewertet und dreidimensional grafisch dargestellt.

x
Wagner, Horst; Ladinig, Tobias; Blaha, HannesDesign considerations for pillar systems in deep minesGeomechanics and Tunnelling5/2016524-528Topics

Abstract

Pillar systems in mines are statically indeterminate systems. The paper presents the results of numerical investigations to evaluate the effects of panel dimensions on pillar loads. It is shown that pillar load in deep mines is strongly influenced by the lateral and vertical extent of extraction panels. The commonly applied tributary area concept does not account for these effects and is an oversimplification that has to be applied with caution. The effects of local pillar failures on stability of pillar workings are examined using simple models. It is shown that limiting panel dimensions by substantial barrier pillars can reduce the danger of regional pillar collapses and enhance overall mine stability.

x
Gomes, Alexandre R.A.; Rojas, Eduardo; Ulloa, Juan CarlosSevere rock mass damage of undercut and extraction level pillars at El Teniente MineGeomechanics and Tunnelling5/2016529-533Topics

Abstract

The El Teniente Mine of Codelco is one of the largest underground mine operations in the world. The mine employs massive mechanised panel caving methods with pre-undercut variants to extract copper-molybdenum ore, producing 140,000 t/d, mainly of primary copper ore. In the context of a study of rehabilitation measures for collapsed zones at the Esmeralda mine, which is one of Tenientés most important operations, a preliminary assessment of the post-collapse pillar's rock mass condition was carried out, allowing the characterization of the damage zone surrounding the drifts and some insights into the likely pillar's rock mass damage development. The paper outlines these findings and discusses some underlying factors that may also have influenced the process.

x
Klitzen, Jens; Herdina, JohannHydroshield drive with a diameter of 13 m in the Lower Inn Valley - Project design and experience from construction of contract H3-4 / Hydroschildvortrieb mit 13 m Durchmesser im Unterinntal - Projektplanung und Erfahrungen im Baulos H3-4Geomechanics and Tunnelling5/2016534-546Topics

Abstract

In the Lower Inn Valley of the Tyrol, Autria, the existing railway line has been upgraded. In the course of these works a two-track tunnel with an excavated diameter of 13.03 m was built in the track section H3-4 Münster/Wiesing. The tunnel was excavated with a slurry TBM. Demanding geotechnical conditions on this difficult contract necessitated changes to the overall concept. After tendering and the award of contract, the client and the contractor started the construction phase with different expectations. We report on the strongly differing experiences of the parties during the construction of the works. At the end, we draw conclusions for both parties from the experience gained during the successful completion of the project.
Im Tiroler Unterinntal wurde im Zuge des Ausbaus der bestehenden Bahntrasse im Streckenabschnitt H3-4 Münster/Wiesing ein zweigleisiger Tunnel mit einem Ausbruchsdurchmesser von 13,03 m ausgeführt. Zum Einsatz kam hierbei eine Schildmaschine mit flüssigkeitsgestützter Ortsbrust. Die besonderen Anforderungen im geotechnisch anspruchsvollen Baulos haben bereits in der Phase der Projektierung eine Reihe von Anpassungen des Gesamtkonzepts erforderlich gemacht. Nach Ausschreibung und Vergabe sind Auftraggeber (AG) und Auftragnehmer (AN) mit bestimmten tlw. nicht deckungsgleichen Erwartungshaltungen in die Bauausführung gestartet. Über dies und die tlw. davon stark abweichenden Erfahrungen, die während der Ausführung gemacht wurden, wird berichtet. Zudem werden die für beide Vertragspartner wesentlichen Schlussfolgerungen aus dem technisch und vertraglich erfolgreich abgewickelten Bauvorhaben zusammengefasst.

x
Daller, Josef; Diewald, Martin; Lemmerer, Johann; Zwittnig, GeraldExpectations and reality of the mechanised tunnel drives for the Wienerwald Tunnel / Erwartung und Wirklichkeit der TBM-Vortriebe am WienerwaldtunnelGeomechanics and Tunnelling5/2016547-555Topics

Abstract

The 13.35 km long Wienerwald (Vienna Woods) Tunnel forms a key element of the new railway line between Vienna and St. Pölten. The 11 km long twin-tube western section of the tunnel was constructed using two tunnel boring machines, type TBM-S, with an excavation diameter of approximately 10.7 m, and a water pressure-relieved, double shell lining system. A Swiss unsealed, stacked segment lining system was used. In the year 2000, a TBM with these dimensions represented new territory for ÖBB-Infrastructure AG, so intensive investigations of the technology were undertaken from the feasibility study and permit application phases onwards. Risk analyses in respect of geotechnical engineering, TBM design and segmental tunnel lining, cross-checking of the construction schedule and costs that were estimated during the tender phases were undertaken. Together with a comprehensive and thorough investigation, this led the client to the conclusion that the tunnelling work in the western section should be tendered with two alternatives (conventional tunnelling and TBM drive). Appropriate tender evaluation criteria allowed an objective comparison of the submitted tenders to be made and resulted in an unproblematic contract with the western section being awarded for the TBM system. The expectations of the client and the contractor with regard to geology and geotechnics, construction schedule and construction process are described. Deviations from these expectations and the actual technical and construction difficulties encountered are explained, along with the corresponding solutions that were used to overcome these problems.
Der 13,35 km lange Wienerwaldtunnel stellt das Kernstück der Neubaustrecke Wien-St. Pölten dar. Der zweiröhrige Westabschnitt des Tunnels wurde über eine Länge von rd. 11 km mit zwei Tunnelbohrmaschinen TBM-S, Ausbruchsdurchmesser rd. 10,7 m und druckwasserentlastetem, zweischaligen Ausbau hergestellt. Als Tübbingsystem wurde ein ungedichteter Schweizer Stapeltübbing gewählt. TBM-Vortriebe in dieser Dimension waren Anfang 2000 für die ÖBB-Infrastruktur AG Neuland, und so befasste sie sich schon bei den Machbarkeitsstudien und den behördlichen Einreichungen intensiv mit dieser Technologie. Risikoanalysen zu Geotechnik, Maschinentechnik, Tübbingausbau, Bauzeit und Kosten in den Phasen Einreichung und Ausschreibung sowie eine umfangreiche Erkundungskampagne ließen den Auftraggeber zu dem Schluss kommen, die Vortriebsarbeiten im Westabschnitt in zwei Varianten (zyklisch und TBM-Vortrieb) auszuschreiben. Entsprechend gewählte Zuschlagskriterien ermöglichten einen objektiven Vergleich der Angebote und eine einspruchsfreie Vergabe des Westabschnitts zugunsten der Variante mit TBM-Vortrieben. Die Erwartungen des Auftraggebers (AG) und des Auftragnehmers (AN) werden hinsichtlich Geologie und Geotechnik, Bauzeit und Bauablauf sowie Vertragsabwicklung dargelegt. Die Abweichungen und tatsächlich aufgetretenen, technischen und bauwirtschaftlichen Schwierigkeiten sowie deren Lösungen werden erläutert.

x
Jesel, Thomas; Amberg, Felix; Rohrer, ThomasTBM drives at the Gotthard Base Tunnel - Design and experience from tunnelling in Faido / TBM-Vortriebe am Gotthard Basistunnel - Projektierung und Erfahrung aus dem Vortrieb FaidoGeomechanics and Tunnelling5/2016556-568Topics

Abstract

In the course of designing the Gotthard Base Tunnel, extensive questions were considered about the tunnelling conditions to be expected and the resulting requirements for the TBM. Naturally this mainly concentrated on the achievable advance rates and the associated costs. The tunnelling works have now been completed and the essential assumptions and decisions from the design phase could be confirmed. Experience does however also show that the behaviour of the rock mass could not always be correctly predicted in its entireness and a corresponding flexibility in the use of support measures is unavoidable, which is only possible with suitable tunnelling equipment and machinery. The present article collects the essential data and facts from the TBM drives and described the areas where significant deviations arose. Particular attention is paid to the following subjects and the corresponding effects: wear to the cutterhead, heavy water ingress, rockburst, reciprocal influencing of the two tunnel drives under poor geological conditions and the collapse in the Tenelin Zone. The stated matters are described with a comparison against the assumptions made in the design phase and a complemented with few of the lessons learnt.
Im Zuge der Planung des Gotthard Basistunnels wurden umfangreiche Überlegungen angestellt, über die zu erwartenden Vortriebsverhältnisse und die sich daraus ergebenden Anforderungen an die TBM. Im Fokus standen dabei naturgemäß vor allem auch die erreichbaren Vortriebsleistungen und die damit verbundenen Kosten. Die Vortriebsarbeiten sind abgeschlossen, und die wesentlichen Annahmen und Entscheide aus der Planungsphase konnten bestätigt werden. Die Erfahrung zeigt aber auch, dass das Verhalten des Gebirges nicht immer vollumfänglich zutreffend vorausgesagt werden konnte und eine entsprechende Flexibilität beim Einsatz der Sicherungsmittel unumgänglich ist, was nur mit einer dafür geeigneten Vortriebsinstallation möglich ist. Der vorliegende Beitrag stellt die wesentlichen Daten und Fakten aus dem TBM- Vortrieb zusammen und zeigt auf, in welchen Bereichen sich deutliche Unterschiede ergeben haben. Ein besonderes Augenmerk wird auf folgende Themen und die entsprechenden Auswirkungen gelegt: Verschleiß am Bohrkopf, hoher Wasseranfall, Bergschlag, gegenseitige Beeinflussung der beiden Tunnelvortriebe bei schlechten geologischen Verhältnissen und Niederbruch in der Tenelin-Zone. Die aufgeführten Punkte werden mit einem Vergleich der Annahmen aus der Projektierung und den effektiv angetroffenen Verhältnissen beleuchtet sowie mit einigen Hinweisen zu den Lessons learned abgerundet.

x
Köhler, Hans; Rengshausen, RainerMetro Doha Green Line - EPB TBM tunnelling under very special circumstances / Metro Doha Green Line - EPB-Vortriebe unter Berücksichtigung sehr spezieller RandbedingungenGeomechanics and Tunnelling5/2016569-579Topics

Abstract

As part of the Qatar National Vision 2030, the capital of Qatar - Doha - is being expanded into a modern centre for economy, trade and sport. A main part of this plan is the establishment of an efficient infrastructure with modern means of transportation.
The Design & Build - Project Green Line Underground was awarded to a Joint Venture (JV) composed of PORR (lead), the Saudi BinLadin Group and the local construction company HBK in summer 2013. It contains the turnkey construction of the underground part of the Green Line with a total length of 2 × 17 km tunnel, six stations, switching areas as well as cross passages and emergency exit shafts. The 34 km of tunnelling, bored by six EPB machines simultaneously, has now been completed. The expectations for the project, especially concerning the TBM tunnelling, are compared to the knowledge gained.
The following topics are highlighted:
- climate and culture,
- personnel of different origins/education,
- working with unskilled/semiskilled workers,
- TBM/logistic concepts,
- performance, wear and tear,
- geological conditions,
- segment design,
- health and safety.
The tunnel drives were completed in 18 months despite all challenges.
Im Rahmen der Qatar National Vision 2030 wird die Hauptstadt Katars - Doha - zu einem modernen Zentrum für Wirtschaft, Handel und Sport ausgebaut. Ein wesentlicher Bestandteil zur Realisierung dieses Ziels ist die Errichtung einer leistungsfähigen Infrastruktur mit modernen Massentransportmitteln.
Das Design & Build-Projekt Green Line Underground wurde im Sommer 2013 an ein Joint Venture (JV) aus Porr (Federführung), der Saudi BinLadin Group und dem lokalen Bauunternehmen HBK vergeben und beinhaltet die schlüsselfertige Errichtung des unterirdischen Abschnitts der Green Line mit einer Tunnellänge von 2 × 17 km, sechs Stationen, Spurwechsel- und Weichenanlagen sowie Querschlägen und Notausstiegsschächten. Die Vortriebe der ca. 34 km langen Tunnel, die mit sechs EPB-Maschinen hergestellt wurden, sind mittlerweile abgeschlossen. In einem Rückblick werden die Erwartungen an das Projekt, insbesondere an den TVM-Vortrieb, mit den gemachten Erfahrungen verglichen.
Hier werden speziell folgende Themen beleuchtet:
- klimatisches und kulturelles Umfeld,
- Personal unterschiedlichster Herkunft und Bildung,
- Arbeiten mit ungelerntem/angelerntem Personal,
- Vortriebs- und Logistikkonzepte,
- Leistungen, Verschleiß, Schäden,
- geologische Verhältnisse, Vorauserkundung,
- technische Ausführung der Tübbinge, inkl. Dichtung,
- Arbeitssicherheit, Gesundheitsschutz.
Trotz aller Herausforderungen konnten die Vortriebsarbeiten in ca. 18 Monaten abgeschlossen werden.

x
Benedikt, Johannes; Lemmerer, Johann; Köpf, Manfred; Obermeier, OskarExcavation of the Perschling Tunnels by TBM - expectations and reality - lessons learned / TBM-Vortrieb Tunnelkette Perschling - Erwartung und Wirklichkeit - Erfahrungen und ErkenntnisseGeomechanics and Tunnelling5/2016580-594Topics

Abstract

In the course of constructing the new Vienna - St. Pölten high-speed railway line, three TBM tunnels with an excavated diameter of approx. 13 m were driven between 2005 and 2010. The total length of these three tunnels including portal structures, cut-and-cover and top-down sections was approx. 7.4 km, of which 6.2 km were excavated by TBM-S. The tunnels were constructed with drainage systems and two-pass linings in the tunnel arch. During the feasibility study, the permit application design and the tender design phase, detailed risk analyses were performed for excavation method (TBM or NATM), machine type (TBM-S or SM-EPB) and lining type (single- or two-pass). The expectations of the client during the design phase and those of the contractor during the bidding phase are compared and discussed, taking into account construction time considerations, geotechnical risk assessments, lining design, machine type and construction sequence as well as the allocation of risks between client and contractor. The reality of the project, i.e. the construction time actually needed, the challenges encountered, the problems solved and the joint approach adopted to implement the project as well as the lessons learned (experiences and findings) are all described.
Im Zuge der Errichtung der Neubaustrecke Wien - St. Pölten wurden in den Jahren 2005 bis 2010 drei Tunnel mittels einer Tunnelbohrmaschine mit einem Ausbruchsdurchmesser von rund 13 m aufgefahren. Die Gesamtlänge der drei Tunnelbauwerke, inklusive der Portalbauwerke, offenen Bauweisen und Deckelbauweisen, betrug rund 7,4 km, wobei rund 6,2 km mit einer TBM-S aufgefahren wurden. Die Tunnel wurden druckwasserentlastet mit einem zweischaligen Ausbau im Gewölbe hergestellt. Für die Tunnel wurden in den Phasen der Grundsatzprüfung, der Behördenverfahren und der Ausschreibungsplanung vertiefte Risikoanalysen zur Vortriebsmethode (TVM oder NÖT), zur Wahl des Maschinentyps (TBM-S oder SM-EPB) und des Ausbaus (einschalig oder zweischalig) erstellt. Die Erwartungen des Auftraggebers (AG) in der Planungsphase und des Auftragnehmers (AN) in der Angebotsphase werden anhand von Bauzeitüberlegungen, Risikobetrachtungen zu Geotechnik, Ausbau, Maschine und Bauablauf sowie der Sphärenzuordnung AG und AN gegenübergestellt und erläutert. Die Wirklichkeit, also die reale Bauzeit, die aufgetretenen Schwierigkeiten, die gelösten Probleme und die partnerschaftliche Projektabwicklung sowie die gewonnenen Erfahrungen und Erkenntnisse werden dargelegt.

x
Arioglu, Basar; Gokce, Hasan Burak; Malcioglu, Fatma Sevil; Arioglu, ErginTBM Tunnel under the Bosphorus for the Istanbul Strait Road Crossing ProjectGeomechanics and Tunnelling4/2016303-309Topics

Abstract

The population increase in Istanbul is also reflected in car ownership, which brings an extensive traffic load to the city, especially to the two bridges over the Bosphorus. After feasibility studies, a double deck, 3.4 km subsea tunnel with a 13.7 m diameter at a maximum depth of 106 m below sea level and a capacity of 100,000 cars/day was initiated as a solution for the city. The tunnel, excavated by a custom-made mixshield slurry TBM, passes through very complex geological structures including the Trakya formation, transition zones and marine sediments in a highly seismic area.

x
Gokce, Hasan Burak; Demir, Korhan; Bakir, Ayd?n; Aribilginc, Tamer; Arioglu, ErginAsia Transition Box and Conventionally Excavated Twin Tunnels for the Istanbul Strait Road Crossing ProjectGeomechanics and Tunnelling4/2016310-316Topics

Abstract

The 14.6 km long Istanbul Strait Road Crossing Project is a safe, quick and environmentally responsible alternative road link between Asia and Europe, as such it is being constructed under a Build-Operate-Transfer contract by a public-private partnership. The investor/contractor has committed to build the Project in 55 months and to operate the facility for a concession period of approximately 25 years. This article examines the project's two critical structures located in the Asian side of Istanbul, considering site investigation, construction and monitoring. The first structure is a cut and cover construction next to the Bosphorus, called the Asia Transition Box (ATB), which enabled the launching of the TBM and conventional tunnels. The second is the conventionally excavated twin tunnels (CETT), which pass under a highly urbanized part of Istanbul and provide the transition from the highway into the tunnel under the Bosphorus.

x
Özcan, Baris; Duman, Emre; Türkoglu, Aykut; Kayali, Sanem; Saenz, IgnacioDesign and construction of the mined Kisikli Station on the Üsküdar-Çekmeköy Metro Line ProjectGeomechanics and Tunnelling4/2016317-325Topics

Abstract

The Üsküdar-Çekmeköy Metro Line (UCM), which is located on the Asian side of Istanbul, is an 18 km underground metro line with 27 km of TBM tunnel, 13 km of NATM tunnel and 16 stations. Apart from being a completely tunnelled station, it has several other features. It is the deepest station in this metro line with the platform depth 45 m below surface level. The station is being built in a complex geology that contains several passive fault zones. The ticket hall and technical rooms are also located in an NATM tunnel with an excavated width of 20 m. Most of the passenger circulation is planned to be carried out by elevators.
The station has been designed with two levels of NATM tunnels with four main elliptical shafts. The geology varies from very strong quartz arenite with a compressive strength of 77 MPa to highly weathered fault zones containing andesite. The complex geometry and geology of the station dictated utmost care for excavation and final lining design of the NATM sections in order to provide stability during excavation and sufficient structural capacity in case of a seismic event.

x
Tokgöz, NurayAn assessment method for fine-grained sedimentary materials excavated by EPB TBMGeomechanics and Tunnelling4/2016326-337Topics

Abstract

The aims of this study are to find a solution for the problems (lumping, adhesion, and clogging) encountered with fine-grained sedimentary materials, minimize the time and cost of excavation, and decrease the potential environmental effects due to soil conditioning chemicals used in the process of excavating a waste water tunnel. Therefore, this study will contribute important technical knowledge regarding design and implementation of excavation with TBM to the mining and construction industries as well as for optimization in mechanical engineering.
In this research, real-time machine operational parameters recorded by EPB TBM and actual geotechnical parameters in an Istanbul-Büyükcekmece Wastewater Tunnel at seven selected tunnel sections were used as input data for the back analysis and assessment method. The method covers excavated materials with: (1) water and (2) soil conditioning chemicals. The influence of water and soil-conditioning chemicals of different proportions on torque, thrust, advance rate of the TBM, and plasticity and consistency indices of the material were investigated. Finally, integrated data were evaluated by multiple linear regression models.

x
Kohlböck, Bernhard; Koc, Onur; Ayten, TürkayIstanbul Strait Road Tube Crossing: Design of NATM Tunnels and Asian Transition Box ExcavationGeomechanics and Tunnelling4/2016338-344Topics

Abstract

Istanbul is among the fastest growing megacities in the world and the only one located on two continents, divided by the Bosphorus strait. The geographic situation together with the enormous growth of population impose great challenges, especially considering urban and infrastructure development. The Bosphorus Strait Road tunnel, also called Eurasia Tunnel, is the first road tunnel connecting the European and the Asian side of the city with the aim of alleviating Istanbul's traffic pressure and reducing the travel time between Kazlıçeme and Göztepe from 100 to 15 minutes. This article focuses on the design of the twin tunnels and the transition box from NATM to TBM on the Asian side.

x
Shalabi, Faisal I.; Cording, Edward J.; Paul, Stanley L.Sealant behavior of gasketed segmental tunnel lining - Conceptual modelGeomechanics and Tunnelling4/2016345-355Topics

Abstract

Gasket sealant behavior along joints of concrete tunnel lining depends on gasket-gasket and gasket-groove contact loads, bonding between gasket and groove, and gasket lateral extrusion. As the gaskets are made of polymers, gasket contact loads are expected to drop with time due to relaxation. Reduction in the contact load with time is expected to affect the gasket sealant capacity. Gasket-gasket contact loads depend on many factors such as: stiffness of the gasket material, gasket shape and volume, groove size and configuration, gasket base configuration, and the amount of gasket compression. In this work, the mechanical and sealant behavior of gaskets in grooves were investigated. Two types of gaskets were considered: open base gasket for low design water pressure (less than 600 kPa), and closed base gasket for high water pressure (up to 4###, 000 kPa). The work focused on gasket-in-groove load deformation behavior and gasket sealant potential including the effect of gasket contact loads, relaxation, extrusion, and the change in joint gap during water pressurization. The effect of gasket base conditions (fingers base vs. closed base) on the gasket sealant behavior was also considered in this work. A conceptual model was developed that explains the leakage of the gasket as water pressure is applied.

x
Paternesi, Alessandra; Schweiger, Helmut F.; Schubert, PeterVerification of a rheological constitutive model for shotcrete through back-analysisGeomechanics and Tunnelling4/2016356-361Topics

Abstract

Tunnel excavation represents a particularly challenging problem from the design point of view, mainly due to the uncertainties characterising the soil or rock mass behaviour and to the difficulties in the prediction of the stress state on the structural supports. This explains why tunnel designers mostly rely on observational data, adapting excavation sequences and support measures during the construction phase (at least in the case of traditionally excavated tunnels), especially for deep tunnels, where the geological and geotechnical uncertainties can be significant. However, the observational method requires a reliable monitoring system as well as considerable work to interpret and back-analyse data measured during construction. On the other hand, this interpretation and back-analysis represent an important step in gaining better understanding of the system response and allowing improvement of the design, thus avoiding excessively conservative and uneconomical solutions. In this paper, a back-analysis of stress and displacement measurements is presented for a NATM tunnel excavation in rock, carried out using a rheological model for shotcrete. It is shown, consistently with the previous literature on the topic, that the use of an advanced model improves the prediction of tunnel behaviour compared to the common practice of using quasi-elastic E-moduli.

x
Gehwolf, Paul; Monsberger, Christoph; Barwart, Stefan; Wenighofer, Robert; Galler, Robert; Lienhart, Werner; Haberler-Weber, Michaela; Moritz, Bernd; Barwart, Christian; Lange, AndreasDeformation measurements of tunnel segments at a newly developed test rig / Deformationsmessungen an Tübbingen mit einem neu entwickelten PrüfstandGeomechanics and Tunnelling3/2016180-187Topics

Abstract

With the use of tunnel boring machines under different geological and geotechnical conditions, the support with precast elements has been state of the art for decades. For the verification of the load-bearing and deformation behaviour of these high-strength reinforced concrete elements under exact known loading conditions, a test rig has been developed and implemented in a cooperation between experts of Austrian Federal Railways (ÖBB-Infrastruktur AG, SAE Fachbereich Bautechnik/Tunnelbau) and the Montanuniverität Leoben (Chair of Subsurface Engineering). The newly developed segment test rig allows biaxial tests on real segments. Due to the modular construction it is feasible to test segments with different geometries and dimensions. The obtained findings should be included in the optimization of these elements. Furthermore, the optimisation of the reinforcement design and replacement of steel bar reinforcement with fibre reinforcement is being investigated. With this test rig, an important step has been taken towards new technologies and materials in the field of segment linings. Currently, tests with distributed fibre optic sensing systems are carried out in cooperation with the Graz University of Technology (Institute of Engineering Geodesy and Measurement Systems - IGMS). A fibre optic sensing cable can be embedded in the segment during production and used for lifelong in-situ deformation measurements of the segment.
Bei einem kontinuierlichen Vortrieb mit Tunnelvortriebsmaschinen zählt der Ausbau des aufgefahrenen Hohlraums mit Tübbingen seit Jahrzehnten zum Stand der Technik. Zur Verifizierung des Trag- und Verformungsverhaltens der Tübbinge bei unterschiedlichen geologischen und geotechnischen Verhältnissen unter definierten Belastungs- und Auflagerbedingungen wurde in enger Kooperation zwischen der ÖBB-Infrastruktur AG (SAE Fachbereich Bautechnik/Tunnelbau) und dem Lehrstuhl für Subsurface Engineering der Montanuniversität Leoben ein Prüfstand geplant und realisiert, der biaxiale Versuche an Tübbingen ermöglicht. Durch den modularen Aufbau ist das Prüfen von unterschiedlichen Tübbinggeometrien sowie -abmessungen möglich. Die daraus gewonnenen Erkenntnisse sollen in die Tübbingoptimierung einfließen. Unter anderem sollen Optimierungen des Bewehrungsdesigns und die mögliche Verwendung von Faserbewehrung untersucht werden. Zukünftig bietet dieser Prüfstand neue Prüfmöglichkeiten zur Weiterentwicklung des Tübbingausbaus und dessen Materialien. Derzeit werden Versuche mit faseroptischen Messsystemen in Kooperation mit dem Institut für Ingenieurgeodäsie und Messsysteme (IGMS) der Technischen Universität Graz durchgeführt. Das faseroptische Sensorkabel wird während der Herstellung in den Tübbing eingebettet und kann zur In-situ-Deformationsmessungen über die gesamte Lebensdauer des Tübbings genutzt werden.

x
Henzinger, Michael R.; Radoncic, Nedim; Moritz, Bernd A.; Schubert, WulfBackfill of segmental lining - State of the art, redistribution behaviour of pea gravel, possible improvements / Tübbingbettung - Stand der Technik, Umlagerungsverhalten von Perlkies, VerbesserungspotenzialGeomechanics and Tunnelling3/2016188-199Topics

Abstract

With mechanized shield tunnelling the quality of the backfill is of significant importance for the stability of the lining. The used material affects the interaction between support and rock mass. Therefore, the choice of a proper backfilling material is of great importance for the system behaviour. Scaled model tests have been carried out investigating the relocation behaviour of pea gravel within the annular gap. The tests have shown that especially with Double shielded TBMs a distinct relocation mechanism is triggered by the regripping process. This leads to an unfavourable bedding situation immediately behind the TBM shield.
Within a numerical study the influence of an incomplete bedding situation on the section forces within the lining segments has been carried out. The simulations have shown that crack propagation is more likely in unfavourable bedding situations. Nevertheless, numerical simulations have proven that cracks within the segments denote a higher utilization level but do not directly imply an acute danger to the load-bearing capacity. As observed in reality, the state of incomplete bedding represents the relevant load case.
A design improvement has been introduced overcoming the temporary state of a partially bedded segmental lining. Furthermore, this approach prevents a large-scale relocation process of pea gravel within the annular gap.
Bei Schildvortrieben hat die Qualität der Ringspaltverfüllung einen wesentlichen Einfluss auf die Qualität des Tübbingausbaus. Das verwendete Bettungsmaterial beeinflusst die Interaktion Gebirge-Tübbingausbau. Deshalb ist die Wahl eines geeigneten Materials für die Ringraumverfüllung von hoher Bedeutung für das Systemverhalten. Zur Untersuchung des Umlagerungsverhaltens von Perlkies innerhalb des Ringspalts wurden Laborversuche durchgeführt. Die Versuche zeigten, dass vor allem bei Doppelschildmaschinen eine ausgeprägte Tendenz zur Umlagerung des Perlkieses in Längsrichtung während des Umsetzvorgangs gegeben ist. In Folge dessen sind die Tübbingringe unmittelbar hinter dem Schildschwanz nur teilgebettet.
Mittels numerischer Simulationen wurde der Einfluss der unvollständigen Bettung auf die Schnittkräfte der Tübbingsegmente untersucht. Die Simulationen haben gezeigt, dass die Rissentwicklung vor allem bei ungünstigen Bettungsszenarien bevorzugt auftritt. Weiters wurde festgestellt, dass Betonrisse lediglich auf einen erhöhten Ausnutzungsgrad innerhalb der Stahlbetonfertigteile, jedoch nicht auf eine Gefährdung der Ausbautragfähigkeit hinweisen. Wie in der Realität beobachtet, repräsentiert der Zustand der unvollständigen Bettung den maßgebenden Lastfall.
Abschließend wird eine Maßnahme vorgestellt, die die temporäre Bettung gezielt verbessern soll. Zudem verhindert diese eine großräumige Umlagerung von Perlkies innerhalb des Ringspalts.

x
Wilfing, Lisa; Käsling, Heiko; Goliasch, Robert; Moritz, Bernd; Thuro, KuroschPenetration tests at the Koralm Tunnel (KAT2) - The right tool to improve penetration prediction in TBM tunneling? / Penetrationsversuche am Beispiel des Koralmtunnels (KAT2) - Ein Werkzeug zur Verbesserung von Penetrationsprognosen im maschinellen Tunnelbau?Geomechanics and Tunnelling3/2016200-209Topics

Abstract

Performance prediction is one of the crucial issues for estimating excavation costs and construction time of tunnel projects. In mechanized tunneling, TBM performance highly depends on achieved penetration rate and cutter wear. The aim of the research group ABROCK and the topic of this paper is the improvement of penetration prediction by performing on-site penetration tests. Therefore estimated parameters by two existing prediction models (Gehring model, Colorado School of Mines model) are compared with the results of penetration tests at Austrians large infrastructure project of the OeBB Koralm tunnel construction lot KAT2. Penetration tests are a common tool to determine the performance of a TBM in certain geological environments. During a test, the TBM is operated under defined conditions that allow the comparison of different tunnel projects and machine types in analogous geological conditions. Results show that only for a narrow scope, considered prediction models reveal appropriate fitting. Once the rock mass is fractured or the stress level within the rock mass changes, existing models are not applicable. This fact emphasizes the need of an update for penetration prediction models by implementing a correction factor for discontinuities and the stress state in a rock mass. This may result in a new prognosis model called Alpine model.
Die Leistungsprognose ist einer der wichtigsten Aspekte für die Kalkulation von Baukosten und Bauzeiten bei Tunnelprojekten. Die Leistung einer TBM wird von der erreichten Penetration sowie dem auftretenden Werkzeugverschleiß bestimmt. Ziel der Forschungsgruppe ABROCK sowie Schwerpunkt dieses Beitrags ist es, existierende Penetrationsprognosemodelle mithilfe von Penetrationsversuchen auf Tunnelbaustellen zu verbessern. In diesem Beitrag werden die prognostizierten Penetrationswerte von zwei gebräuchlichen Modellen (Gehring Model, Colorado School of Mines Model) mit den Ergebnissen der Penetrationsversuche am großen österreichischen Infrastrukturprojekt der ÖBB-Infrastruktur AG, dem Koralmtunnel Baulos KAT2, verglichen. Der Penetrationsversuch ist eine häufig angewandte Methode, um die Leistung einer TBM in einem gewissen geologischen Umfeld zu bestimmen. Hierbei wird die Maschine unter definierten Bedingungen gefahren, wodurch ein Vergleich unterschiedlicher Tunnelprojekte sowie Maschinentypen bei entsprechenden geologischen Verhältnissen ermöglicht wird. Die Ergebnisse zeigen, dass die untersuchten Prognosemodelle nur für einen sehr engen Anwendungsbereich zuverlässige Werte liefern. Sobald das Gebirge Trennflächen oder einen veränderten Spannungszustand aufweist, sind beide Ansätze nicht mehr brauchbar. Diese Tatsache zeigt deutlich, dass die existierenden Modelle adaptiert werden müssen, indem Korrekturfaktoren für das Trennflächengefüge sowie den Spannungszustand im Gebirge implementiert werden. Dies soll in einem neuen Prognosemodell, dem sogenannten Alpine-Modell resultieren.

x
Gaich, Andreas; Pötsch, Markus3D images for digital tunnel face documentation at TBM headings - Application at Koralmtunnel lot KAT2 / 3D-Bilder zur digitalen Ortsbrustdokumentation bei TBM- Vortrieben - Anwendung beim Koralmtunnel Baulos KAT2Geomechanics and Tunnelling3/2016210-221Topics

Abstract

Within the scope of a research activity of ÖBB-Infrastruktur AG (Austrian Federal Railways) improvements for tunnel face documentation during TBM tunnelling are investigated. This contribution presents an autonomous imaging unit for taking videos of the tunnel face. The unit is installed during maintenance shift in the cutter head of a hard rock TBM. While turning the cutter head, a video is taken. Simultaneously a smartphone that also controls the camera tracks the orientation of the imaging system. From the video a consistent three-dimensional image is generated using latest algorithms from photogrammetry. The resulting 3D images are used for determining single block detachments from the tunnel face as well as quantifying the planarity in general. They serve for enhancing geological mapping including the determination of discontinuities and provide comprehensive and objective documentation information. First successful applications at Koralmtunnel lot KAT2 showed the value of this new way of documentation and measurements.
Im Rahmen einer Forschungsaktivität der ÖBB Infrastruktur AG werden Verbesserungen zur Dokumentation der Ortsbrust bei TBM-Vortrieben untersucht. Dieser Beitrag zeigt eine autonome Aufnahmeeinheit, die Videos der Ortsbrust erfasst. Die Aufnahmeeinheit wird während der Wartungsschicht im Bohrkopf einer Hartgesteins-Tunnelvortriebsmaschine installiert, und während einer Drehung des Bohrkopfs wird ein Video aufgenommen. Gleichzeitig zeichnet ein Smartphone, das auch die Kamera steuert, Orientierungsinformationen auf. Aus dem Video wird unter Anwendung aktueller Algorithmen der Photogrammetrie ein konsistentes dreidimensionales Bild erzeugt. Die resultierenden 3D-Bilder werden dazu benutzt, um einzelne Ausbrüche aus der Ortsbrust sowie die Ebenheit der aufgenommenen Bereiche zu quantifizieren. Sie dienen außerdem für eine verbesserte geologische Kartierung inklusive der Bestimmung von Trennflächenorientierungen und stellen eine umfassende und objektive Dokumentation dar. Erste erfolgreiche Anwendungen beim Baulos KAT2 des Koralmtunnels zeigen den Wert dieser neuartigen Art der Dokumentation und messtechnischen Bewertung.

x
Handke, Dieter; Edelhoff, DennisQuality and risk management strategy for mechanized tunnelling - From machine concept to process controlling / Qualitätssicherungselemente und Risikomanagementstrategie für den maschinellen Tunnelbau - Vom Maschinenkonzept zum ProzesscontrollingGeomechanics and Tunnelling3/2016222-233Topics

Abstract

Mechanized tunnelling is a highly technical construction process, which requires the establishment of precise objectives to consistently guarantee high quality and safety standards while still considering the aspects of time and cost reduction. In the tendering and construction phases, these objectives can be met by the application of a risk management strategy and the integration of quality assurance elements. The implementation of process controlling with the objectives optimization, error prevention and documentation provides a centralized monitoring element in the construction phase. External experts can monitor tunnelling activities in real time and submit recommendations in case of deviations. With downstream analyses, incidents can be evaluated and methodological errors identified.
Der maschinelle Tunnelbau ist ein hoch mechanisiertes Bauverfahren, bei dem zur Sicherstellung einer dauerhaft hohen Qualität und Einhaltung höchster Sicherheitsstandards bei gleichzeitiger Berücksichtigung bauzeit- und kostenreduzierender Aspekte klare Zielformulierungen aufgestellt werden müssen. In der Ausschreibungs- und Ausführungsphase können diese Zielstellungen durch die Anwendung einer Risikomanagementstrategie und die Integration von Qualitätssicherungselementen erfüllt werden. Die Ausführung eines Prozesscontrollings mit der Zielstellung Optimierung, Fehlervermeidung und Dokumentation stellt ein zentrales Überwachungselement in der Bauphase dar. Hierbei werden von externen Experten die Vortriebsarbeiten in Echtzeit überwacht und bei Vorliegen von Abweichungen Handlungsempfehlungen unterbreitet. Über nachgeschaltete Analysen können Schadensereignisse bewertet und Verfahrensfehler identifiziert werden.

x
Gehwolf, Paul; Walter, Andreas; Galler, Robert; Wagner, HannsShear tests on flexible shear dowels for use at cross passages with thin segmental linings / Scherversuche von flexiblen Scherdübeln für den Einsatz bei Querschlagsanschlägen mit schlanken TübbingauskleidungenGeomechanics and Tunnelling3/2016234-242Topics

Abstract

For the driving of cross passages in mechanized tunnelling, different systems can be used for load transfer at the cross passage opening. With thin segmental linings, achieving high load-bearing capacity of the precast lining and the load transfer elements used pose a great challenge. For the selection of a system, not only the required support measures but also practical construction aspects such as the integration of the load transfer elements into the precast element and the installation of the elements play an important role. The use of shear dowels as a connection and load transfer element between segment rings in the cross passageoffers new possibilities in mechanized tunnelling. Particularly in connection with thin segmental linings, flexible systems of plastic with integrated steel core make it possible to resist loads with large deformations, both in the radial and longitudinal directions. In order to investigate the system behaviour of the overall system of segmental lining with thin construction and plastic shear dowels, shear tests were performed at the Chair for Subsurface Engineering of the Montanuniversität Leoben with a dowel system as the connecting element between segments. The objective of the research project initiated by the ÖBB-Infrastruktur AG is to determine the effects of different reinforcement concepts on the load-bearing capacity of the connection system. Ways of determining the failure of the construction element based on crack detection are also described.
Für das Anfahren von Querschlägen im maschinellen Tunnelbau kommen unterschiedliche Systeme für die Lastabtragung im Bereich der Querschlagsöffnung zum Einsatz. Bei schlanken Tübbingauskleidungen stellt das Erzielen einer hohen Lastkapazität der Fertigteilauskleidung sowie der eingesetzten Lastabtragungselemente eine hohe Herausforderung dar. Bei der Auswahl der Systeme spielen neben den erforderlichen Sicherungsmaßnahmen die baupraktischen Aspekte wie das Integrieren der Lastabtragungselemente in das Fertigteilsegment und die Installation der Elemente eine wesentliche Rolle. Durch Verwendung von Scherdübeln als Verbindung- und Lastübertragungselement zwischen Tübbingringen im Querschlagsbereich ergeben sich neue Möglichkeiten im maschinellen Tunnelvortrieb. Insbesondere im Zusammenhang mit schlanken Tübbingauskleidungen bieten flexible Systeme aus Kunststoff mit integriertem Stahlkern die Möglichkeit, Lasten mit großen Verformungen sowohl in Radial- als auch in Längsrichtung zu übertragen. Um das Systemverhalten des Gesamtsystems zwischen Tübbingauskleidung mit schlanker Bauteildicke und Kunststoffscherdübel zu untersuchen, wurden am Lehrstuhl für Subsurface Engineering der Montanuniversität Leoben Scherversuche mit einem Dübelsystem als Verbindungselement von Tübbingen durchgeführt. Ziel des von der ÖBB-Infrastruktur AG initiierten Forschungsprojekts ist es, die Auswirkungen unterschiedlicher Bewehrungskonzepte auf die Tragfähigkeit des Verbindungssystems zu bestimmen. Ergänzend werden Möglichkeiten zur Bestimmung des Bauteilversagens auf Basis der Risserkennung aufgezeigt.

x
Vigl, Alois; Walter, Andreas; Lemmerer, Johann; Atzl, Georg; Handke, DieterTBM research project - Tolerances segmental lining / TVM-Forschungsprojekt - Toleranzen TübbingausbauGeomechanics and Tunnelling3/2016243-259Topics

Abstract

In infrastructure tunnelling projects with shielded TBMs, prefabricated segmental linings are used with various systems and requirements. The required degree of accuracy in segment production and ring assembly is a considerable factor in terms of equipment, time and costs. The required tolerances for segments and ring assembly depend significantly on the segment geometry, lining system and field of application. In order to provide a reasonable basis for allowable segment and installation tolerances, a new approach has been established as part of a research initiative of the ÖBB-Infrastruktur AG with respect to the risks and consequences arising from geometrical tolerances. The paper explains the concept of “tolerance classes” with the approach for their developments, derivation and classification. A practical application example is shown in addition. With respect to the nomenclature of tolerances, a harmonization process has been performed in collaboration with the German committees for underground structures, ZTV-ING and DAUB. The results of harmonizing and proposals of tolerance clarifications are presented within this paper.

Toleranzklassen, Harmonisierung der Toleranzbegriffe und Toleranzanforderungen Erfahrungsstand 2016
Bei maschinellen Schildvortrieben kommen Tübbingauskleidungen mit unterschiedlichen Systemen und Anforderungen zum Einsatz. Die erforderliche Genauigkeit in der Herstellung der Fertigteilsegmente sowie beim Ringbau gewinnt immer mehr an Bedeutung für eine wirtschaftliche Auslegung der Auskleidung, gekoppelt an die spezifischen Anforderungen des Projekts. Das erforderliche Maß an die Genauigkeit der Tübbinge und den Einbau im Tunnel hängt im Wesentlichen von der Tübbinggeometrie, vom Tübbingsystem und vom jeweiligen Anwendungsbereich ab. Im Arbeitskreis “TVM-Forschungsprojekt Toleranzen”, einer Forschungsinitiative der ÖBB-Infrastruktur AG, wurde ein neuer Ansatz für die Herleitung zulässiger Herstell- und Einbautoleranzen unter Einbeziehung einer Risikobetrachtung entwickelt. Im vorliegenden Beitrag wird die Herangehensweise für die Entwicklung, Herleitung und Klassifizierung von Toleranzgruppen, die unter dem Namen “Toleranzklassen” geführt werden, beschrieben. Ergänzend wird auch ein Beispiel für die Anwendung des vorgestellten Konzepts gezeigt. Im Zusammenhang mit den Toleranzklassen erfolgte eine Harmonisierung von Toleranzbegriffen in Zusammenarbeit mit deutschen Ausschüssen wie der ZTV-ING und des DAUB. Die wesentlichen Änderungen und Ergänzungen der Toleranzbegriffe sowie Erläuterungen werden im Anschluss an das erwähnte Konzept der Toleranzklassen vorgestellt.

x
John, Max; Matousek, Federico; Dallapiazza, WernerGotthard Base Tunnel - Comparison of forecast and findings regarding engineering geology and tunnelling / Gotthard-Basistunnel - Vergleich Prognose und Befund aus baugeologischer und tunnelbautechnischer SichtGeomechanics and Tunnelling3/2016260-275Topics

Abstract

For deep tunnels with restricted possibilities for site investigation, deviations from the forecast are usually to be expected. Deviations of geological and hydrogeological conditions have different effects on tunnelling. At the Gotthard Base Tunnel it was found that some areas considered as critical actually behaved most favourably, whereas other areas, such as fault zones and zones of high rock pressure, deviated unfavourably from the forecast with considerable effects on costs and the time schedule. Unfavourable deviations could not be compensated by favourable areas. It should be also noted that these deviations had not been included in risk analyses, because they were unknown, however the original cost prognosis of 1999 provided sufficient financial reserves. These deviations were mastered by intensive probing ahead of excavation and adaptation of design, construction programme and additional measures defined during construction. On the basis of the comparison of forecast and actual conditions, the positive and negative effects of the conditions encountered on tunnelling are described.
Bei einem tiefliegenden Tunnel mit beschränkten Möglichkeiten der Erkundung treten bei der Ausführung naturgemäß Abweichungen von der Prognose auf. Diese haben ihre Ursachen in den geologischen und hydrogeologischen Verhältnissen, die sich unterschiedlich auf den Vortrieb auswirken. Beim Gotthard-Basistunnel hat sich gezeigt, dass sich in einzelnen als kritisch eingestuften Bereichen das Gebirge günstiger verhalten hat als prognostiziert. Von der Prognose abweichende ungünstigere Bereiche, insbesondere Störzonen und druckhaftes Gebirge, hatten erhebliche Auswirkungen auf Kosten und Termine, die durch die günstigeren Bereiche nicht aufgewogen werden konnten. Diese Abweichungen waren in den Risikoanalysen nicht enthalten, da diese nicht bekannt waren. Allerdings waren in der ursprünglichen Kostenprognose von 1999 entsprechende finanzielle Reserven vorgesehen. Die geänderten Verhältnisse wurden mit einer intensiven Vorauserkundung erfasst; mit einer Anpassung der Planung, des Bauablaufs und dem Einsatz zusätzlicher Maßnahmen wurde ihnen Rechnung getragen und damit konnten diese zielführend bewältigt werden. Auf Basis einer Gegenüberstellung von Prognose und Befund wird aus Sicht des SIOP-Teams auf die positiven und negativen Auswirkungen der angetroffenen Verhältnisse auf den Vortrieb eingegangen.

x
Vetsch, Hans-Peter; Zbinden, Peter; Märki, Ernst; Ehrbar, HeinzGotthard Base Tunnel - Choice of the tunnel system from today's point of view / Gotthard-Basistunnel - Wahl des Tunnelsystems aus heutiger SichtGeomechanics and Tunnelling2/201679-93Topics

Abstract

The historic rail tunnels in the Alps were consistently built in the form of single-tube twin-track tunnels, starting with the Mont Cenis Tunnel (1871). Only the 19.8 km long Simplon Tunnel at the start of the 20th century was built with two separate single-track tunnels. In 1988, the 53.8 km long Seikan Tunnel became the first tunnel more than 50 km long to go into operation - once more as a twin-track tunnel, although with additional constructional elements such as forced ventilation, emergency stations and a service tunnel. In 1994 followed the Channel Tunnel with a system of two single-track tunnels and a service or safety tunnel as well as a complex ventilation system. For the base tunnels through the Alps, the question arose in Switzerland at the start of the 1990s, what is the optimal tunnel system considering the requirements of construction, safety and operation? A cost-benefit analysis resulted in a system with two single-track tunnels and multi-function stations at the third points as the optimum. Meanwhile, various requirements have been newly formulated so that the question arises whether the same decision would be made with the knowledge available today.
Die historischen Eisenbahntunnel in den Alpen wurden nach dem Bau des Mont Cenis Tunnels (1871) konsequent in Form von einröhrigen Doppelspurtunneln gebaut. Einzig der 19,8 km lange Simplontunnel wurde Anfang des 20. Jahrhunderts mit zwei separaten Einspurtunneln erstellt. 1988 wurde mit dem 53,8 km langen Seikan-Tunnel erstmalig ein über 50 km langer Eisenbahntunnel in Betrieb genommen - wiederum als Doppelspurtunnel, allerdings mit zusätzlichen konstruktiven Elementen wie Betriebslüftung, Nothaltestellen und einem Dienststollen. 1994 folgte der Eurotunnel mit einem System aus zwei Einspurtunneln und einem Service- bzw. Sicherheitsstollen sowie einem zusätzlichen komplexen Lüftungssystem. Für die Basistunnel durch die Alpen stellte sich in der Schweiz Anfang der 1990er-Jahre die Frage, welches das optimale Tunnelsystem unter Berücksichtigung der Anforderungen Bau, Sicherheit und Betrieb sei. Aus einer Nutzwertanalyse resultierte das System mit zwei Einspurtunneln sowie Multifunktionsstellen in den Drittelspunkten als Optimum. Mittlerweile wurden verschiedene Anforderungen neu formuliert, so dass sich die Frage stellt, ob mit den heutigen Kenntnissen die gleiche Entscheidung getroffen würde.