abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small

Journal articles

Reset filter
  • Author(s)

  • Language of Publication

  • Published

  • Category

Journal

  • Select allDe-select all
Author(s)TitleJournalIssuePageCategory
Zweiter Fritz-Leonhardt-Preis an Jörg SchlaichStahlbau11/2002839Persönliches

Abstract

No short description available.

x
Sohn, K.Zweiter Ingenieurwettbewerb für eine Straßenbrücke in Baden-Württemberg.Beton- und Stahlbetonbau12/1990305-310

Abstract

Über Ausschreibung, Wettbewerbsentwürfe und Würdigung der preisgekrönten Beiträge für ein Brückenprojekt.

x
Zweiter Leipziger BauschadenstagBautechnik9/1999839Termine

Abstract

No short description available.

x
Grabe, JürgenZweiter Technischer Halbjahresbericht 2016 des Arbeitsausschusses "Ufereinfassungen" der Hafentechnischen Gesellschaft e. V. (HTG) und der Deutschen Gesellschaft für Geotechnik (DGGT)Bautechnik12/2016946-947Berichte

Abstract

No short description available.

x
Grabe, JürgenZweiter Technischer Halbjahresbericht 2017 des Arbeitsausschusses "Ufereinfassungen" der Hafentechnischen Gesellschaft e. V. (HTG) und der Deutschen Gesellschaft für Geotechnik (DGGT)Bautechnik12/2017875-880Berichte

Abstract

No short description available.

x
Zweiter Weiterbildungsstudiengang "Zertifizierter Fachplaner"Bautechnik6/2004502-503Nachrichten

Abstract

No short description available.

x
Zweites internationales Symposium für unkonventionellen Zement und Beton, Brünn, 14.-16. Juni 2005Beton- und Stahlbetonbau4/2004335Information

Abstract

No short description available.

x
Kos, M.Zweiträgerkranbrücke mit rechteckigen Kastenträgern.Stahlbau11/1983339-343Fachthemen

Abstract

No short description available.

x
Hettler, AchimZwischen Deregulierung und ÃœberregulierungBautechnik9/2012577-578Editorial

Abstract

No short description available.

x
Kierdorf, AlexanderZwischen Genie und Utopie - Johann Wilhelm Schwedlers vergessener Alternativentwurf für die erste Kölner RheinbrückeStahlbau3/2011198-204Fachthemen

Abstract

Im Wettbewerb um den Bau der ersten Kölner Rheinbrücke erhielt der junge Berliner Ingenieur Johann Wilhelm Schwedler den Ersten Preis für einen Hängebrücken-Entwurf, der auf einer Planung seines Bruders aufbaut und sich eng an die Vorgaben der Ausschreibung hielt. Da aber schnell klar wurde, dass die verlangte Hängebrücke mit Schifffahrtsöffnung den stetig wachsenden Anforderungen an eine Eisenbahnbrücke nicht genügen konnte, schuf Schwedler kurz darauf einen Alternativentwurf, bei dem er die Fahrbahn an abgestumpft linsenförmigen Trägern aufhing. Dieser Entwurf, der bisher unbekannt war und erst im Jahre 1900 publiziert wurde, steht in engstem Zusammenhang mit Schwedlers bahnbrechender, ebenfalls zunächst kaum wahrgenommenen Publikation der “Theorie der Brückenbalkensysteme” von 1851. In Köln entschied man sich 1853/54 für den Bau einer Gitterträgerbrücke nach dem Vorbild der Dirschauer Weichselbrücke. Als Schwedler Jahrzehnte später genau dort seinen letzten Großbau ausführen konnte, nahm er die Kölner Entwürfe auf; in statisch aktualisierter Form bildeten sie ein Dokument des Fortschritts im Brückenbau und ein gebautes Manifest zugunsten der theoretisch-wissenschaftlich fundierten Ingenieurbaukunst, an deren Durchsetzung Schwedler maßgeblich beteiligt war.

Of vision and genius - The forgotten alternative design by Johann Wilhelm Schwedler for the first Rhine Bridge at Cologne, Germany.
The competition on the first Rhine crossing was won, with a suspension bridge construction, based on his brother's preparatory designs and closely following the rules, by young engineer Johann Wilhelm Schwedler from Berlin. But it soon became clear that the bridge, including an opening section, could not cope with the constantly rising demands of railway traffic, and Schwedler created an alternative design, consisting of lenticular trusses with a suspended track. This design, hidden for al long time and published only once in 1900, is closely linked with Schwedler's groundbreaking, but also first neglected publication on the “Theory of Bridge Truss Systems” in 1851. Some years later, a lattice truss bridge was built at Cologne, following the Weichsel bridge at Dirschau (1850-55). Decades later when Schwedler got the chance to build another large size bridge right there, he returned to the Cologne design of 1850. Structurally modernized, he made it a document to progress in bridge building and a manifesto for an Art of Engineering based on science and theory, the success of which was not to a small extent the work of Schwedler.

x
Krippner, R.Zwischen Konstruktion und Präsentation - Anmerkungen zum Einsatz von Eisen im KirchenbauStahlbau12/1998969-972Berichte

Abstract

No short description available.

x
Zwischenbilanz des 1000-Dächer-Programms nach fünf JahrenBauphysik2/199761Aktuelles

Abstract

No short description available.

x
Eggert, H.Zwischenruf - Redner-RegelnBautechnik4/2002272-273Berichte

Abstract

No short description available.

x
Eggert, H.Zwischenruf - Ãœber SprachproblemeBautechnik1/200254Berichte

Abstract

No short description available.

x
Hotzler, H.Zwischenruf zur Vermeidung von FehlplanungenBeton- und Stahlbetonbau7/2006542-543Zuschriften

Abstract

No short description available.

x
Eggert, H.Zwischenruf: 4 + 1 Grundregeln für nichtrobuste StrukturenBautechnik8/2004664-665Berichte

Abstract

No short description available.

x
Böhme, H.Zwischenruf: Brauchen wir eine Wissenschaftssprache?Bautechnik7/2008480-483Berichte

Abstract

No short description available.

x
Kolymbas, D.; Fellin, W.Zwischenruf: Ein Dialog über die Sicherheit in der GeotechnikBautechnik2/2003129Berichte

Abstract

No short description available.

x
Lachmann, H.Zwischenruf: Eine Meinung zu PPP-BaumaßnahmenBautechnik5/2007352-353Berichte

Abstract

No short description available.

x
Stritzke, J.Zwischenruf: Fakten zur Dresdner WaldschlößchenbrückeBautechnik11/2007819-822Berichte

Abstract

No short description available.

x
Eggert, H.Zwischenruf: Feedback, Erfolgskontrolle und Nachkalkulation bei RegelwerkenBautechnik1/200360Berichte

Abstract

No short description available.

x
Wagner, P.Zwischenruf: Gedanken zur BauingenieurausbildungBautechnik12/2003928-929Berichte

Abstract

No short description available.

x
Kolymbas, D.Zwischenruf: Gedanken zur Grundlagenforschung und ihrer FörderungBautechnik1/200774-77Berichte

Abstract

No short description available.

x
Eggert, H.Zwischenruf: Gespenst EurocodeBautechnik9/2006653-655Berichte

Abstract

No short description available.

x
Eggert, H.Zwischenruf: Lehren aus Bad Reichenhall?Bautechnik2/2006147-148Berichte

Abstract

No short description available.

x