Lorenz, W.; Wetzk, V. | 3rd International Congress on Construction History, Cottbus 2009 - Call for Papers | Bautechnik | 4/2008 | 302-303 | Berichte |
No short description available. x |
| 3rd International Stainless Steel Congress - Stainless 2005 | Stahlbau | 9/2004 | 780 | Termine |
No short description available. x |
| 3rd International Stainless Steel Congress - Stainless 2005. Erfolgsstories in Edelstahl Rostfrei | Stahlbau | 11/2004 | 949-950 | Termine |
No short description available. x |
Paschen, M. | 3rd International Symposium on STEEL BRIDGES. | Stahlbau | 5/1997 | 283-284 | Berichte |
No short description available. x |
| 4 Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 41/2011 | 22-34 | Bauregelliste A Teil 1 (2011/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
| 4 Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 39/2010 | 20-32 | Bauregelliste A Teil 1 (2010/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
| 4 Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 38/2009 | 23-36 | Bauregelliste A Teil 1 (2009/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
| 4 Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 36/2008 | 25-37 | Bauregelliste A Teil 1 (2008/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
Flemming, Christian | 4-Stufen-Risikosimulation zur Ermittlung von Mittelabflüssen unter Berücksichtigung des geplanten Baufortschritts | Bautechnik | 7/2012 | 463-470 | Aufsätze |
Bauprojekte weisen aufgrund ihrer Komplexität, ihres zeitlichen Umfangs und ihres finanziellen Volumens ein erhebliches Risikopotenzial auf. Mit den bisherigen Methoden kann nur ein monetärer Gesamtbetrag für das Risiko eines Bauprojektes ermittelt werden. Der Auftraggeber muss aber auch die zeitliche Einordnung der Risiken berücksichtigen, um den Zeitpunkt zusätzlicher Mittelabflüsse aufgrund des Eintretens der Risiken bestimmen zu können. Auf diese Weise kann der Auftraggeber seine Finanzierungsplanung optimieren. In diesem Beitrag wird am Beispiel der Kosten für die Bauausführung gezeigt, wie die unterschiedlichen Eintrittszeitpunkte der Risiken berücksichtigt werden können, um einen zeitabhängigen Verlauf der Risikokosten und der damit verbunden Mittelabflüsse zu ermitteln.
4-step-risk-simulation for the calculation of the cash outflow of the client with consideration to the scheduled construction process Due to the complexity, the long duration and the needed scale of budget construction projects are high-risk-projects. The common methods can estimate a monetary value for the total risk of a construction project. Nevertheless, for the client it is important to know the date of additional cost for occurred risks to optimize his financial plan. This paper will show how the possible date of risks can be used to estimate a chronological sequence of the cash outflow. x |
| 4. Aachener Kolloquium für Instandhaltung, Diagnose und Anlagenüberwachung | Bautechnik | 10/2002 | 715 | Termine |
No short description available. x |
| 4. Aachener Kolloquium für Instandhaltung, Diagnose und Anlagenüberwachung | Bautechnik | 9/2002 | 649 | Termine |
No short description available. x |
| 4. Bauchemie-Forum: Zukunft des Betonbaus im Fokus neuer Normen, Richtlinien und Umwelt | Bautechnik | 11/2000 | 866 | Termine |
No short description available. x |
| 4. Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 34/2007 | 26-41 | Bauregelliste A Teil 1 (2007/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
| 4. Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 33/2006 | 28-43 | Bauregelliste A Teil 1 (2006/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
| 4. Bauprodukte für den Metallbau | Bauregelliste A, Bauregelliste B und Liste C | 31/2005 | 30-46 | Bauregelliste A Teil 1 (2005/1) |
4.1 Bauprodukte aus unlegierten Baustählen 4.2 Bauprodukte aus geschmiedetem Stahl 4.3 Bauprodukte aus Gusswerkstoffen 4.4 Bauprodukte aus Vergütungsstahl 4.5 Bauprodukte aus nichtrostendem Stahl 4.6 Bauprodukte aus schweißgeeignetem Feinkornbaustahl 4.7 Bauprodukte aus Aluminium 4.8 Verbindungsmittel (Niete, Schrauben, Bolzen, Muttern und Scheiben), Schweißzusätze, Schweißhilfsstoffe 4.9 Korrosionsschutzstoffe und korrosionsgeschützte Bauprodukte (ohne mechanische Verbindungsmittel) 4.10 Vorgefertigte Bauteile aus Metall x |
| 4. Bayerischer Mauerwerkstag | Bautechnik | 2/2001 | 135 | Termine |
No short description available. x |
Knoll, A. | 4. Braunschweiger Deponieseminar "Konstruktion, Bemessung und Qualitätssicherung von Abdichtungssystemen". | Bautechnik | 6/1996 | 396 | Berichte |
No short description available. x |
| 4. Dahlberg-Kolloquium Algen an den Fassadenbaustoffen | Bautechnik | 3/2003 | 205 | Termine |
No short description available. x |
Festtag, G. | 4. Darmstädter Geotechnik-Kolloquium. | Bautechnik | 7/1997 | 482-483 | Berichte |
No short description available. x |
| 4. Deutscher Bauchemietag | Bautechnik | 12/2001 | 909 | Termine |
No short description available. x |
| 4. Deutscher Bauchemietag zur "bautec" | Beton- und Stahlbetonbau | 1/2002 | A17 | Tagungen |
No short description available. x |
| 4. Deutscher I.I.R.-Baukongreß '99 | Bautechnik | 4/1999 | 349 | Termine |
No short description available. x |
| 4. Doka-Studentenwettbewerb | Beton- und Stahlbetonbau | 1/2005 | 92 | Aktuelles |
No short description available. x |
| 4. Dresdener Baustatik-Seminar Leichte und ultraleichte Ingenieurbauten | Bautechnik | 8/2000 | 602 | Termine |
No short description available. x |
| 4. European ETICS Forum in Warschau mit Rekordbeteiligung | Bauphysik | 6/2017 | 339 | Aktuell |
No short description available. x |